SF577

Efficiency improvement of Wetland Conservation Act determinations
Legislative Session 94 (2025-2026)

Related bill: HF8

Bill text

Introduction

ReadChanges
PDF
(underlined = new law, struck through = current law the bill removes)
1.1A bill for an act
1.2relating to environment; improving efficiency of Wetland Conservation Act
1.3determinations; modifying permitting efficiency reporting requirements; improving
1.4the efficiency of the environmental and resource management permit application
1.5process; requiring the Pollution Control Agency to issue separate permits for the
1.6construction and operation of certain facilities; modifying the expedited permitting
1.7process of the Pollution Control Agency; requiring petitioners for environmental
1.8assessment worksheets to reside in the affected or adjoining counties; eliminating
1.9scoping environmental assessment worksheet requirements for projects requiring
1.10an environmental impact statement; requiring modification of the state
1.11implementation plan; requiring reports; appropriating money; amending Minnesota
1.12Statutes 2024, sections 15.99, subdivision 3; 116.03, subdivision 2b; 116.07,
1.13subdivisions 4a, 4d; 116D.04, subdivision 2a; 116J.035, by adding a subdivision.
1.14BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.15Section 1. Minnesota Statutes 2024, section 15.99, subdivision 3, is amended to read:
1.16Subd. 3. Application; extensions. (a) The time limit in subdivision 2 begins upon the
1.17agency's receipt of a written request containing all information required by law or by a
1.18previously adopted rule, ordinance, or policy of the agency, including the applicable
1.19application fee. If an agency receives a written request that does not contain all required
1.20information, the 60-day limit starts over only if the agency sends written notice within 15
1.21business days of receipt of the request telling the requester what information is missing.
1.22(b) If a request relating to zoning, septic systems, watershed district review, soil and
1.23water conservation district review, or expansion of the metropolitan urban service area
1.24requires the approval of more than one state agency in the executive branch, the 60-day
1.25period in subdivision 2 begins to run for all executive branch agencies on the day a request
1.26containing all required information is received by one state agency. The agency receiving
1.27the request must forward copies to other state agencies whose approval is required.
2.1(c) An agency response, including an approval with conditions, meets the 60-day time
2.2limit if the agency can document that the response was sent within 60 days of receipt of the
2.3written request. Failure to satisfy the conditions, if any, may be a basis to revoke or rescind
2.4the approval by the agency and will not give rise to a claim that the 60-day limit was not
2.5met.
2.6(d) The time limit in subdivision 2 is extended if a state statute, federal law, or court
2.7order requires a process to occur before the agency acts on the request, and the time periods
2.8prescribed in the state statute, federal law, or court order make it impossible to act on the
2.9request within 60 days. In cases described in this paragraph, the deadline is extended to 60
2.10days after completion of the last process required in the applicable statute, law, or order.
2.11Final approval of an agency receiving a request is not considered a process for purposes of
2.12this paragraph.
2.13(e) The time limit in subdivision 2 is extended if: (1) a request submitted to a state agency
2.14requires prior approval of a federal agency; or (2) an application submitted to a city, county,
2.15town, school district, metropolitan or regional entity, or other political subdivision requires
2.16prior approval of a state or federal agency. In cases described in this paragraph, the deadline
2.17for agency action is extended to 60 days after the required prior approval is granted.
2.18(f) An agency may extend the time limit in subdivision 2 before the end of the initial
2.1960-day period by providing written notice of the extension to the applicant. The notification
2.20must state the reasons for the extension and its anticipated length, which may not exceed
2.2160 days unless approved by the applicant. new text begin There may be no more than one extension under new text end
2.22 new text begin this paragraph of any determination under sections 103G.221 to 103G.2375. new text end
2.23(g) An applicant may by written notice to the agency request an extension of the time
2.24limit under this section.
2.25Sec. 2. Minnesota Statutes 2024, section 116.03, subdivision 2b, is amended to read:
2.26Subd. 2b. Permitting efficiency. (a) It is the goal of the state that environmental and
2.27resource management permits be issued or denied within 90 days for tier 1 permits or 150
2.28days for tier 2 permits following submission of a permit application. The commissioner of
2.29the Pollution Control Agency deleted text begin shall deleted text end new text begin must new text end establish management systems designed to achieve
2.30the goal. For the purposes of this section, "tier 1 permits" are permits that do not require
2.31individualized actions or public comment periods, and "tier 2 permits" are permits that
2.32require individualized actions or public comment periods.
3.1(b) The commissioner deleted text begin shall deleted text end new text begin must new text end prepare deleted text begin an annual deleted text end new text begin semiannual new text end permitting efficiency
3.2 deleted text begin report deleted text end new text begin reports new text end that deleted text begin includes deleted text end new text begin include new text end statistics on meeting the new text begin tier 2 new text end goal in paragraph (a) and
3.3the criteria for tier 2 by permit categories. The deleted text begin report is due deleted text end new text begin reports must be submitted to new text end
3.4 new text begin the governor and to the chairs and ranking minority members of the house of representatives new text end
3.5 new text begin and senate committees having jurisdiction over environment policy and finance by February new text end
3.6 new text begin 1 and new text end August 1 each year new text begin and must be posted on the agency's website new text end . new text begin If a report indicates new text end
3.7 new text begin that 50 percent or more of the permit applications received during the period covered by new text end
3.8 new text begin the report were deemed incomplete, the commissioner must also submit the report to the new text end
3.9 new text begin ombudsman established under section 116J.035, subdivision 9. Each report must include: new text end
3.10 new text begin (1) new text end for new text begin each new text end permit deleted text begin applications deleted text end new text begin application new text end that deleted text begin have deleted text end new text begin has new text end not met the goal, deleted text begin the report deleted text end
3.11 deleted text begin must state the reasons for not meeting the goal. In stating the reasons for not meeting the deleted text end
3.12 deleted text begin goal, the commissioner shall separately identify delays deleted text end new text begin an explanation of whether the delay new text end
3.13 new text begin was new text end caused by the responsiveness of the proposer, lack of staff, scientific or technical
3.14disagreements, or the level of public engagement deleted text begin . The report must specify deleted text end new text begin ; new text end
3.15 new text begin (2) for each permit that has not met the goal, new text end the number of days from initial submission
3.16of the application to the day of determination that the application is complete deleted text begin . The report deleted text end
3.17 deleted text begin must aggregate deleted text end new text begin ; new text end
3.18 new text begin (3) a summary of new text end the data for the deleted text begin year deleted text end new text begin reporting period new text end and deleted text begin assess deleted text end new text begin an assessment of new text end
3.19whether program or system changes are necessary to achieve the new text begin tier 2 new text end goal deleted text begin . The report deleted text end
3.20 deleted text begin must be posted on the agency's website and submitted to the governor and the chairs and deleted text end
3.21 deleted text begin ranking minority members of the house of representatives and senate committees having deleted text end
3.22 deleted text begin jurisdiction over environment policy and finance. deleted text end new text begin in paragraph (a); new text end
3.23 new text begin (4) a statement of the number of tier 2 permits completed within the reporting period new text end
3.24 new text begin and, immediately following in parentheses, a statement of the percentage of total applications new text end
3.25 new text begin received for that tier 2 permit category that the number represents, stated separately for new text end
3.26 new text begin industrial and municipal permits; and new text end
3.27 new text begin (5) for permits that did not meet the goal due to lack of staff, a combined estimate of new text end
3.28 new text begin the aggregate staff resources that would have been necessary for all affected permits to meet new text end
3.29 new text begin the goal. new text end
3.30(c) The commissioner deleted text begin shall deleted text end new text begin must new text end allow electronic submission of environmental review
3.31and permit documents to the agency.
3.32(d) Within 30 business days of application for a permit subject to paragraph (a), the
3.33commissioner of the Pollution Control Agency deleted text begin shall deleted text end new text begin must new text end notify the permit applicant, in
3.34writing, whether the application is complete or incomplete. deleted text begin If the commissioner determines deleted text end
4.1 deleted text begin that an application is incomplete, the notice to the applicant must deleted text end new text begin If an application is missing new text end
4.2 new text begin information, the commissioner must immediately contact the applicant, new text end enumerate all
4.3deficiencies deleted text begin , deleted text end new text begin while new text end citing specific provisions of the applicable rules and statutes, deleted text begin and deleted text end advise
4.4the applicant on how the deficiencies can be remedied deleted text begin . deleted text end new text begin , and request that the deficiencies be new text end
4.5 new text begin remedied as soon as possible. Submission by the applicant of additional information to new text end
4.6 new text begin correct deficiencies does not restart the 30 business days allowed under this paragraph for new text end
4.7 new text begin the agency to determine whether the application is complete or incomplete unless the new text end
4.8 new text begin corrected application is more than 30 percent larger than the deficient application. new text end If the
4.9commissioner determines that the application is complete, the notice must confirm the
4.10application's tier 1 or tier 2 permit status new text begin and must inform the applicant of any missing new text end
4.11 new text begin information that was supplied by the commissioner under this paragraph new text end . If the commissioner
4.12believes that a complete application for a tier 2 construction permit cannot be issued within
4.13the 150-day goal, the commissioner must provide notice to the applicant with the
4.14commissioner's notice that the application is complete and, upon request of the applicant,
4.15provide the permit applicant with a schedule estimating when the agency will begin drafting
4.16the permit and issue the public notice of the draft permit. new text begin Failure to meet the goal in paragraph new text end
4.17 new text begin (a) for issuing a type 2 permit constitutes a final decision of the agency for purposes of new text end
4.18 new text begin section 115.05, subdivision 11. new text end This paragraph does not apply to an application for a permit
4.19that is subject to a grant or loan agreement under chapter 446A.
4.20(e) For purposes of this subdivision, "permit professional" means an individual not
4.21employed by the Pollution Control Agency who:
4.22(1) has a professional license issued by the state of Minnesota in the subject area of the
4.23permit;
4.24(2) has at least ten years of experience in the subject area of the permit; and
4.25(3) abides by the duty of candor applicable to employees of the Pollution Control Agency
4.26under agency rules and complies with all applicable requirements under chapter 326.
4.27(f) Upon the agency's request, an applicant relying on a permit professional must
4.28participate in a meeting with the agency before submitting an application:
4.29(1) at least two weeks prior to the preapplication meeting, the applicant must submit at
4.30least the following:
4.31(i) project description, including, but not limited to, scope of work, primary emissions
4.32points, discharge outfalls, and water intake points;
4.33(ii) location of the project, including county, municipality, and location on the site;
5.1(iii) business schedule for project completion; and
5.2(iv) other information requested by the agency at least four weeks prior to the scheduled
5.3meeting; and
5.4(2) during the preapplication meeting, the agency deleted text begin shall deleted text end new text begin must new text end provide for the applicant
5.5at least the following:
5.6(i) an overview of the permit review program;
5.7(ii) a determination of which specific application or applications will be necessary to
5.8complete the project;
5.9(iii) a statement notifying the applicant if the specific permit being sought requires a
5.10mandatory public hearing or comment period;
5.11(iv) a review of the timetable established in the permit review program for the specific
5.12permit being sought; and
5.13(v) a determination of what information must be included in the application, including
5.14a description of any required modeling or testing.
5.15(g) The applicant may select a permit professional to undertake the preparation of the
5.16permit application and draft permit.
5.17(h) If a preapplication meeting was held, the agency deleted text begin shall deleted text end new text begin must new text end , within seven business
5.18days of receipt of an application, notify the applicant and submitting permit professional
5.19that the application is complete or is denied, specifying the deficiencies of the application.
5.20(i) Upon receipt of notice that the application is complete, the permit professional deleted text begin shall deleted text end
5.21 new text begin must new text end submit to the agency a timetable for submitting a draft permit. The permit professional
5.22 deleted text begin shall deleted text end new text begin must new text end submit a draft permit on or before the date provided in the timetable. Within 60
5.23days after the close of the public comment period, the commissioner deleted text begin shall deleted text end new text begin must new text end notify the
5.24applicant whether the permit can be issued.
5.25(j) Nothing in this section shall be construed to modify:
5.26(1) any requirement of law that is necessary to retain federal delegation to or assumption
5.27by the state; or
5.28(2) the authority to implement a federal law or program.
5.29(k) The permit application and draft permit deleted text begin shall deleted text end new text begin must new text end identify or include as an appendix
5.30all studies and other sources of information used to substantiate the analysis contained in
5.31the permit application and draft permit. The commissioner deleted text begin shall deleted text end new text begin must new text end request additional
6.1studies, if needed, and the permit applicant deleted text begin shall deleted text end new text begin must new text end submit all additional studies and
6.2information necessary for the commissioner to perform the commissioner's responsibility
6.3to review, modify, and determine the completeness of the application and approve the draft
6.4permit.
6.5 new text begin (l) If an environmental or resource management permit is not issued or denied within new text end
6.6 new text begin the applicable period described in paragraph (a), the commissioner must immediately begin new text end
6.7 new text begin review of the application and must take all steps necessary to issue the final permit, deny new text end
6.8 new text begin the permit, or issue the public notice for the draft permit within 150 days of the expiration new text end
6.9 new text begin of the applicable period described in paragraph (a). The commissioner may extend the period new text end
6.10 new text begin for up to 60 days by issuing a written notice to the applicant stating the length of and reason new text end
6.11 new text begin for the extension. Except as prohibited by federal law, after the applicable period expires, new text end
6.12 new text begin any person may seek an order of the district court requiring the commissioner to immediately new text end
6.13 new text begin take action on the permit application. A time limit under this paragraph may be extended new text end
6.14 new text begin through written agreement between the commissioner and the applicant. new text end
6.15Sec. 3. Minnesota Statutes 2024, section 116.07, subdivision 4a, is amended to read:
6.16Subd. 4a. Permits. (a) The Pollution Control Agency may issue, continue in effect or
6.17deny permits, under such conditions as it may prescribe for the prevention of pollution, for
6.18the emission of air contaminants, or for the installation or operation of any emission facility,
6.19air contaminant treatment facility, treatment facility, potential air contaminant storage
6.20facility, or storage facility, or any part thereof, or for the sources or emissions of noise
6.21pollution. new text begin The Pollution Control Agency must issue separate permits for constructing a new text end
6.22 new text begin facility described in this paragraph and for its operation. The Pollution Control Agency new text end
6.23 new text begin must issue these permits in a manner that minimizes the time required to construct and begin new text end
6.24 new text begin operation of the permitted facility. new text end
6.25(b) The Pollution Control Agency may also issue, continue in effect or deny permits,
6.26under such conditions as it may prescribe for the prevention of pollution, for the storage,
6.27collection, transportation, processing, or disposal of waste, or for the installation or operation
6.28of any system or facility, or any part thereof, related to the storage, collection, transportation,
6.29processing, or disposal of waste.
6.30(c) The agency may not issue a permit to a facility without analyzing and considering
6.31the cumulative levels and effects of past and current environmental pollution from all sources
6.32on the environment and residents of the geographic area within which the facility's emissions
6.33are likely to be deposited, provided that the facility is located in a community in a city of
6.34the first class in Hennepin County that meets all of the following conditions:
7.1(1) is within a half mile of a site designated by the federal government as an EPA
7.2superfund site due to residential arsenic contamination;
7.3(2) a majority of the population are low-income persons of color and American Indians;
7.4(3) a disproportionate percent of the children have childhood lead poisoning, asthma,
7.5or other environmentally related health problems;
7.6(4) is located in a city that has experienced numerous air quality alert days of dangerous
7.7air quality for sensitive populations between February 2007 and February 2008; and
7.8(5) is located near the junctions of several heavily trafficked state and county highways
7.9and two one-way streets which carry both truck and auto traffic.
7.10(d) The Pollution Control Agency may revoke or modify any permit issued under this
7.11subdivision and section 116.081 whenever it is necessary, in the opinion of the agency, to
7.12prevent or abate pollution.
7.13(e) The Pollution Control Agency has the authority for approval over the siting, expansion,
7.14or operation of a solid waste facility with regard to environmental issues. However, the
7.15agency's issuance of a permit does not release the permittee from any liability, penalty, or
7.16duty imposed by any applicable county ordinances. Nothing in this chapter precludes, or
7.17shall be construed to preclude, a county from enforcing land use controls, regulations, and
7.18ordinances existing at the time of the permit application and adopted pursuant to Minnesota
7.19Statutes 2020, sections 366.10 to 366.181, or sections 394.21 to 394.37, or 462.351 to
7.20462.365, with regard to the siting, expansion, or operation of a solid waste facility.
7.21(f) Except as prohibited by federal law, a person may commence construction,
7.22reconstruction, replacement, or modification of any facility prior to the issuance of a
7.23construction permit by the agency.
7.24Sec. 4. Minnesota Statutes 2024, section 116.07, subdivision 4d, is amended to read:
7.25Subd. 4d. Permit fees. (a) The agency may collect permit fees in amounts not greater
7.26than those necessary to cover the reasonable costs of developing, reviewing, and acting
7.27upon applications for agency permits and implementing and enforcing the conditions of the
7.28permits pursuant to agency rules. Permit fees shall not include the costs of litigation. The
7.29fee schedule must reflect reasonable and routine direct and indirect costs associated with
7.30permitting, implementation, and enforcement. The agency may impose an additional
7.31enforcement fee to be collected for a period of up to two years to cover the reasonable costs
7.32of implementing and enforcing the conditions of a permit under the rules of the agency.
7.33Any money collected under this paragraph shall be deposited in the environmental fund.
8.1(b) Notwithstanding paragraph (a), the agency shall collect an annual fee from the owner
8.2or operator of all stationary sources, emission facilities, emissions units, air contaminant
8.3treatment facilities, treatment facilities, potential air contaminant storage facilities, or storage
8.4facilities subject to a notification, permit, or license requirement under this chapter,
8.5subchapters I and V of the federal Clean Air Act, United States Code, title 42, section 7401
8.6et seq., or rules adopted thereunder. The annual fee shall be used to pay for all direct and
8.7indirect reasonable costs, including legal costs, required to develop and administer the
8.8notification, permit, or license program requirements of this chapter, subchapters I and V
8.9of the federal Clean Air Act, United States Code, title 42, section 7401 et seq., or rules
8.10adopted thereunder. Those costs include the reasonable costs of reviewing and acting upon
8.11an application for a permit; implementing and enforcing statutes, rules, and the terms and
8.12conditions of a permit; emissions, ambient, and deposition monitoring; preparing generally
8.13applicable regulations; responding to federal guidance; modeling, analyses, and
8.14demonstrations; preparing inventories and tracking emissions; and providing information
8.15to the public about these activities.
8.16(c) The agency shall set fees that:
8.17(1) will result in the collection, in the aggregate, from the sources listed in paragraph
8.18(b), of an amount not less than $25 per ton of each volatile organic compound; pollutant
8.19regulated under United States Code, title 42, section 7411 or 7412 (section 111 or 112 of
8.20the federal Clean Air Act); and each pollutant, except carbon monoxide, for which a national
8.21primary ambient air quality standard has been promulgated;
8.22(2) may result in the collection, in the aggregate, from the sources listed in paragraph
8.23(b), of an amount not less than $25 per ton of each pollutant not listed in clause (1) that is
8.24regulated under this chapter or air quality rules adopted under this chapter; and
8.25(3) shall collect, in the aggregate, from the sources listed in paragraph (b), the amount
8.26needed to match grant funds received by the state under United States Code, title 42, section
8.277405 (section 105 of the federal Clean Air Act).
8.28The agency must not include in the calculation of the aggregate amount to be collected
8.29under clauses (1) and (2) any amount in excess of 4,000 tons per year of each air pollutant
8.30from a source. The increase in air permit fees to match federal grant funds shall be a surcharge
8.31on existing fees. The commissioner may not collect the surcharge after the grant funds
8.32become unavailable. In addition, the commissioner shall use nonfee funds to the extent
8.33practical to match the grant funds so that the fee surcharge is minimized.
9.1(d) To cover the reasonable costs described in paragraph (b), the agency shall provide
9.2in the rules promulgated under paragraph (c) for an increase in the fee collected in each
9.3year by the percentage, if any, by which the Consumer Price Index for the most recent
9.4calendar year ending before the beginning of the year the fee is collected exceeds the
9.5Consumer Price Index for the calendar year 1989. For purposes of this paragraph the
9.6Consumer Price Index for any calendar year is the average of the Consumer Price Index for
9.7all-urban consumers published by the United States Department of Labor, as of the close
9.8of the 12-month period ending on August 31 of each calendar year. The revision of the
9.9Consumer Price Index that is most consistent with the Consumer Price Index for calendar
9.10year 1989 shall be used.
9.11(e) Any money collected under paragraphs (b) to (d) must be deposited in the
9.12environmental fund and must be used solely for the activities listed in paragraph (b).
9.13(f) Permit applicants who wish to construct, reconstruct, or modify a project may deleted text begin offer deleted text end
9.14 new text begin request expedited permitting under this paragraph. An applicant requesting expedited new text end
9.15 new text begin permitting under this paragraph must agree new text end to reimburse the agency for the costs of staff
9.16time or consultant services needed to expedite the preapplication process and permit
9.17development process through the final decision on the permit, including the analysis of
9.18environmental review documents. The reimbursement deleted text begin shall be deleted text end new text begin is new text end in addition to permit
9.19application fees imposed by law. deleted text begin When the agency determines that it needs additional deleted text end
9.20 deleted text begin resources to develop the permit application in an expedited manner, and that expediting the deleted text end
9.21 deleted text begin development is consistent with permitting program priorities, the agency may accept the deleted text end
9.22 deleted text begin reimbursement. deleted text end The commissioner must give the applicant an estimate of new text begin the timeline and new text end
9.23costs to be incurred by the commissioner. The estimate must include a brief description of
9.24the tasks to be performed, a schedule for completing the tasks, and the estimated cost for
9.25each task. new text begin If the applicant agrees to the estimated timeline and costs negotiated with the new text end
9.26 new text begin commissioner, new text end the applicant and the commissioner must enter into a written agreement
9.27 deleted text begin detailing the estimated costs for the expedited permit decision-making process to be incurred deleted text end
9.28 deleted text begin by the agency deleted text end new text begin to proceed accordingly new text end . The agreement must deleted text begin also deleted text end identify staff anticipated
9.29to be assigned to the project. new text begin The agreement may provide that, if permitting is completed new text end
9.30 new text begin ahead of the schedule set forth in the written agreement, the commissioner may retain any new text end
9.31 new text begin fees that would have been due if the permitting had taken the time contemplated in the new text end
9.32 new text begin written agreement. Fees retained by the commissioner under this paragraph are appropriated new text end
9.33 new text begin to the commissioner to pay for administering the commissioner's permitting duties. new text end The
9.34commissioner must not issue a permit until the applicant has paid all fees in full. The
9.35commissioner must refund any unobligated balance of fees paid. Reimbursements accepted
10.1by the agency are appropriated to the agency for the purpose of developing the permit or
10.2analyzing environmental review documents. Reimbursement by a permit applicant shall
10.3precede and not be contingent upon issuance of a permit; shall not affect the agency's decision
10.4on whether to issue or deny a permit, what conditions are included in a permit, or the
10.5application of state and federal statutes and rules governing permit determinations; and shall
10.6not affect final decisions regarding environmental review.
10.7(g) The fees under this subdivision are exempt from section 16A.1285.
10.8Sec. 5. Minnesota Statutes 2024, section 116D.04, subdivision 2a, is amended to read:
10.9Subd. 2a. When prepared. (a) Where there is potential for significant environmental
10.10effects resulting from any major governmental action, the action must be preceded by a
10.11detailed environmental impact statement prepared by the responsible governmental unit.
10.12The environmental impact statement must be an analytical rather than an encyclopedic
10.13document that describes the proposed action in detail, analyzes its significant environmental
10.14impacts, discusses appropriate alternatives to the proposed action and their impacts, and
10.15explores methods by which adverse environmental impacts of an action could be mitigated.
10.16The environmental impact statement must also analyze those economic, employment, and
10.17sociological effects that cannot be avoided should the action be implemented. To ensure its
10.18use in the decision-making process, the environmental impact statement must be prepared
10.19as early as practical in the formulation of an action.
10.20(b) The board deleted text begin shall deleted text end new text begin must new text end by rule establish categories of actions for which environmental
10.21impact statements and for which environmental assessment worksheets must be prepared
10.22as well as categories of actions for which no environmental review is required under this
10.23section. A mandatory environmental assessment worksheet is not required for the expansion
10.24of an ethanol plant, as defined in section 41A.09, subdivision 2a, paragraph (b), or the
10.25conversion of an ethanol plant to a biobutanol facility or the expansion of a biobutanol
10.26facility as defined in section 41A.15, subdivision 2d, based on the capacity of the expanded
10.27or converted facility to produce alcohol fuel, but must be required if the ethanol plant or
10.28biobutanol facility meets or exceeds thresholds of other categories of actions for which
10.29environmental assessment worksheets must be prepared. The responsible governmental unit
10.30for an ethanol plant or biobutanol facility project for which an environmental assessment
10.31worksheet is prepared is the state agency with the greatest responsibility for supervising or
10.32approving the project as a whole.
10.33(c) A mandatory environmental impact statement is not required for a facility or plant
10.34located outside the seven-county metropolitan area that produces less than 125,000,000
11.1gallons of ethanol, biobutanol, or cellulosic biofuel annually, or produces less than 400,000
11.2tons of chemicals annually, if the facility or plant is: an ethanol plant, as defined in section
11.341A.09, subdivision 2a, paragraph (b); a biobutanol facility, as defined in section 41A.15,
11.4subdivision 2d; or a cellulosic biofuel facility. A facility or plant that only uses a cellulosic
11.5feedstock to produce chemical products for use by another facility as a feedstock is not
11.6considered a fuel conversion facility as used in rules adopted under this chapter.
11.7(d) The responsible governmental unit deleted text begin shall deleted text end new text begin must new text end promptly publish notice of the
11.8completion of an environmental assessment worksheet by publishing the notice in at least
11.9one newspaper of general circulation in the geographic area where the project is proposed,
11.10by posting the notice on a website that has been designated as the official publication site
11.11for publication of proceedings, public notices, and summaries of a political subdivision in
11.12which the project is proposed, or in any other manner determined by the board and deleted text begin shall deleted text end
11.13 new text begin must new text end provide copies of the environmental assessment worksheet to the board and its member
11.14agencies. Comments on the need for an environmental impact statement may be submitted
11.15to the responsible governmental unit during a 30-day period following publication of the
11.16notice that an environmental assessment worksheet has been completed. The responsible
11.17governmental unit may extend the 30-day comment period for an additional 30 days one
11.18time. Further extensions of the comment period may not be made unless approved by the
11.19project's proposer. The responsible governmental unit's decision on the need for an
11.20environmental impact statement must be based on the environmental assessment worksheet
11.21and the comments received during the comment period, and must be made within 15 days
11.22after the close of the comment period. The board's chair may extend the 15-day period by
11.23not more than 15 additional days upon the request of the responsible governmental unit.
11.24(e) An environmental assessment worksheet must also be prepared for a proposed action
11.25whenever material evidence accompanying a petition by not less than 100 individuals who
11.26reside or own property in deleted text begin the state deleted text end new text begin a county where the proposed action will be undertaken new text end
11.27 new text begin or in one or more adjoining counties new text end , submitted before the proposed project has received
11.28final approval by the appropriate governmental units, demonstrates that, because of the
11.29nature or location of a proposed action, there may be potential for significant environmental
11.30effects. Petitions requesting the preparation of an environmental assessment worksheet must
11.31be submitted to the board. The chair of the board deleted text begin shall deleted text end new text begin must new text end determine the appropriate
11.32responsible governmental unit and forward the petition to it. A decision on the need for an
11.33environmental assessment worksheet must be made by the responsible governmental unit
11.34within 15 days after the petition is received by the responsible governmental unit. The
12.1board's chair may extend the 15-day period by not more than 15 additional days upon request
12.2of the responsible governmental unit.
12.3(f) Except in an environmentally sensitive location where Minnesota Rules, part
12.44410.4300, subpart 29, item B, applies, the proposed action is exempt from environmental
12.5review under this chapter and rules of the board, if:
12.6(1) the proposed action is:
12.7(i) an animal feedlot facility with a capacity of less than 1,000 animal units; or
12.8(ii) an expansion of an existing animal feedlot facility with a total cumulative capacity
12.9of less than 1,000 animal units;
12.10(2) the application for the animal feedlot facility includes a written commitment by the
12.11proposer to design, construct, and operate the facility in full compliance with Pollution
12.12Control Agency feedlot rules; and
12.13(3) the county board holds a public meeting for citizen input at least ten business days
12.14before the Pollution Control Agency or county issuing a feedlot permit for the animal feedlot
12.15facility unless another public meeting for citizen input has been held with regard to the
12.16feedlot facility to be permitted. The exemption in this paragraph is in addition to other
12.17exemptions provided under other law and rules of the board.
12.18(g) The board may, before final approval of a proposed project, require preparation of
12.19an environmental assessment worksheet by a responsible governmental unit selected by the
12.20board for any action where environmental review under this section has not been specifically
12.21provided for by rule or otherwise initiated.
12.22(h) An early and open process must be used to limit the scope of the environmental
12.23impact statement to a discussion of those impacts that, because of the nature or location of
12.24the project, have the potential for significant environmental effects. The same process must
12.25be used to determine the form, content, and level of detail of the statement as well as the
12.26alternatives that are appropriate for consideration in the statement. In addition, the permits
12.27that will be required for the proposed action must be identified during the scoping process.
12.28Further, the process must identify those permits for which information will be developed
12.29concurrently with the environmental impact statement. The board deleted text begin shall deleted text end new text begin must new text end provide in its
12.30rules for the expeditious completion of the scoping process. The determinations reached in
12.31the process must be incorporated into the order requiring the preparation of an environmental
12.32impact statement.
13.1(i) The responsible governmental unit deleted text begin shall deleted text end new text begin must new text end , to the extent practicable, avoid
13.2duplication and ensure coordination between state and federal environmental review and
13.3between environmental review and environmental permitting. Whenever practical,
13.4information needed by a governmental unit for making final decisions on permits or other
13.5actions required for a proposed project must be developed in conjunction with the preparation
13.6of an environmental impact statement. When an environmental impact statement is prepared
13.7for a project requiring multiple permits for which two or more agencies' decision processes
13.8include either mandatory or discretionary hearings before a hearing officer before the
13.9agencies' decision on the permit, the agencies may, notwithstanding any law or rule to the
13.10contrary, conduct the hearings in a single consolidated hearing process if requested by the
13.11proposer. All agencies having jurisdiction over a permit that is included in the consolidated
13.12hearing deleted text begin shall deleted text end new text begin must new text end participate. The responsible governmental unit deleted text begin shall deleted text end new text begin must new text end establish
13.13appropriate procedures for the consolidated hearing process, including procedures to ensure
13.14that the consolidated hearing process is consistent with the applicable requirements for each
13.15permit regarding the rights and duties of parties to the hearing, and deleted text begin shall deleted text end new text begin must new text end use the earliest
13.16applicable hearing procedure to initiate the hearing. All agencies having jurisdiction over
13.17a permit identified in the draft environmental assessment worksheet scoping document must
13.18begin reviewing any permit application upon publication of the notice of preparation of the
13.19environmental impact statement.
13.20(j) An environmental impact statement must be prepared and its adequacy determined
13.21within 280 days after notice of its preparation unless the time is extended by consent of the
13.22parties or by the governor for good cause. The responsible governmental unit deleted text begin shall deleted text end new text begin must new text end
13.23determine the adequacy of an environmental impact statement, unless within 60 days after
13.24notice is published that an environmental impact statement will be prepared, the board
13.25chooses to determine the adequacy of an environmental impact statement. If an environmental
13.26impact statement is found to be inadequate, the responsible governmental unit has 60 days
13.27to prepare an adequate environmental impact statement.
13.28(k) The proposer of a specific action may include in the information submitted to the
13.29responsible governmental unit a preliminary draft environmental impact statement under
13.30this section on that action for review, modification, and determination of completeness and
13.31adequacy by the responsible governmental unit. A preliminary draft environmental impact
13.32statement prepared by the project proposer and submitted to the responsible governmental
13.33unit must identify or include as an appendix all studies and other sources of information
13.34used to substantiate the analysis contained in the preliminary draft environmental impact
13.35statement. The responsible governmental unit deleted text begin shall deleted text end new text begin must new text end require additional studies, if needed,
14.1and obtain from the project proposer all additional studies and information necessary for
14.2the responsible governmental unit to perform its responsibility to review, modify, and
14.3determine the completeness and adequacy of the environmental impact statement.
14.4Sec. 6. Minnesota Statutes 2024, section 116J.035, is amended by adding a subdivision
14.5to read:
14.6 new text begin Subd. 9. Ombudsman for business permitting. (a) The commissioner of employment new text end
14.7 new text begin and economic development must appoint an ombudsman for business permitting to assist new text end
14.8 new text begin businesses of all sizes with obtaining permits necessary to operate in the state. The new text end
14.9 new text begin ombudsman's duties include but are not limited to: new text end
14.10 new text begin (1) conducting independent evaluations of all aspects of permitting processes that affect new text end
14.11 new text begin businesses in the state; new text end
14.12 new text begin (2) monitoring, reviewing, and providing comments and recommendations to federal, new text end
14.13 new text begin state, and local authorities on laws and regulations that impact businesses in the state; new text end
14.14 new text begin (3) facilitating and promoting participation of businesses in developing laws and new text end
14.15 new text begin regulations that affect businesses; new text end
14.16 new text begin (4) providing reports to federal, state, and local authorities and the public on the new text end
14.17 new text begin requirements of permitting laws and the laws' impact on businesses; new text end
14.18 new text begin (5) disseminating information about proposed regulations and other information to new text end
14.19 new text begin businesses and other interested parties; new text end
14.20 new text begin (6) participating in and sponsoring meetings and conferences about business permitting new text end
14.21 new text begin with state and local regulatory officials, industry groups, and business representatives; new text end
14.22 new text begin (7) investigating and assisting in resolving complaints and disputes from businesses new text end
14.23 new text begin against state or local authorities; new text end
14.24 new text begin (8) operating a toll-free telephone line to provide free confidential help on new text end
14.25 new text begin permitting-related problems and grievances; new text end
14.26 new text begin (9) establishing cooperative programs with trade associations and small businesses to new text end
14.27 new text begin promote and achieve voluntary compliance with applicable laws and regulations; new text end
14.28 new text begin (10) establishing cooperative programs with federal, state, and local governmental entities new text end
14.29 new text begin and the private sector to assist businesses in securing sources of funding to comply with new text end
14.30 new text begin federal, state, and local permitting laws and regulations; new text end
15.1 new text begin (11) conducting studies to evaluate the impacts of federal and state permitting laws and new text end
15.2 new text begin regulations on the state's economy, local economies, and businesses; new text end
15.3 new text begin (12) coordinating with Minnesota Business First Stop, the ombudsman for small business new text end
15.4 new text begin air-quality compliance assistance, and other relevant state officials; and new text end
15.5 new text begin (13) investigating the cause of permit applications being deemed incomplete when the new text end
15.6 new text begin ombudsman receives a Pollution Control Agency permitting report under section 116.03, new text end
15.7 new text begin subdivision 2b, paragraph (b). new text end
15.8 new text begin (b) In carrying out the duties imposed by this subdivision, the ombudsman may act new text end
15.9 new text begin independently of any agency in providing testimony to the legislature, contacting and making new text end
15.10 new text begin periodic reports to federal and state officials as necessary to carry out the duties imposed new text end
15.11 new text begin by this subdivision, and addressing problems or concerns related to business permitting. new text end
15.12 new text begin (c) The ombudsman must be knowledgeable about federal and state business permitting new text end
15.13 new text begin laws and regulations and federal and state legislative and regulatory processes. The new text end
15.14 new text begin ombudsman must be experienced in dealing with both private enterprise and governmental new text end
15.15 new text begin entities, arbitration and negotiation, interpretation of laws and regulations, investigation, new text end
15.16 new text begin record keeping, report writing, public speaking, and management. new text end
15.17 new text begin (d) The commissioner of employment and economic development must provide the new text end
15.18 new text begin ombudsman with the necessary office space, supplies, equipment, and clerical support to new text end
15.19 new text begin effectively perform the duties imposed by this subdivision. new text end
15.20Sec. 7. new text begin SCOPING ENVIRONMENTAL ASSESSMENT WORKSHEET NOT new text end
15.21 new text begin REQUIRED FOR PROJECTS THAT REQUIRE A MANDATORY new text end
15.22 new text begin ENVIRONMENTAL IMPACT STATEMENT. new text end
15.23 new text begin (a) The Environmental Quality Board must amend Minnesota Rules, part 4410.2100, as new text end
15.24 new text begin follows: new text end
15.25 new text begin (1) to provide that neither an environmental assessment worksheet nor any other scoping new text end
15.26 new text begin document needs to be prepared for a project that falls within a mandatory environmental new text end
15.27 new text begin impact statement category under Minnesota Rules, part 4410.4400, or other applicable law; new text end
15.28 new text begin and new text end
15.29 new text begin (2) to provide that a scoping process undertaken under Minnesota Rules, part 4410.2100, new text end
15.30 new text begin must be completed no later than 280 days after the process begins. new text end
16.1 new text begin (b) The board may use the good-cause exemption under Minnesota Statutes, section new text end
16.2 new text begin 14.388, subdivision 1, clause (3), to adopt rules under this section, and Minnesota Statutes, new text end
16.3 new text begin section 14.386, does not apply except as provided under Minnesota Statutes, section 14.388. new text end
16.4Sec. 8. new text begin STATE IMPLEMENTATION PLAN REVISIONS. new text end
16.5 new text begin (a) The commissioner of the Pollution Control Agency must seek approval from the new text end
16.6 new text begin federal Environmental Protection Agency for revisions to the state's federal Clean Air Act new text end
16.7 new text begin state implementation plan to reflect the requirements of Minnesota Statutes, section 116.07, new text end
16.8 new text begin subdivision 4a, as amended by this act. new text end
16.9 new text begin (b) The commissioner of the Pollution Control Agency must report quarterly to the chairs new text end
16.10 new text begin and ranking minority members of the house of representatives and senate committees and new text end
16.11 new text begin divisions with jurisdiction over environment and natural resources policy on the status of new text end
16.12 new text begin efforts to implement paragraph (a) until the revisions required by paragraph (a) have been new text end
16.13 new text begin either approved or denied. new text end
16.14Sec. 9. new text begin INTENT. new text end
16.15 new text begin The legislature recognizes the need to retain and grow the state's economy and vital new text end
16.16 new text begin infrastructure to keep Minnesota competitive on a national and global level. This growth new text end
16.17 new text begin requires innovation and creativity, which will be achieved while protecting our environment new text end
16.18 new text begin and natural resources as prescribed under current law. It is therefore the intent of the new text end
16.19 new text begin legislature in enacting this bill that the state will meet or exceed efficiency goals, modernize new text end
16.20 new text begin existing regulatory systems, and communicate clearly to permit applicants and stakeholders new text end
16.21 new text begin to ensure a predictable, transparent, and fair permitting and environmental review process. new text end

Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.