1.1A bill for an act
1.2relating to environment; modifying permitting efficiency reporting requirements;
1.3improving the efficiency of the environmental and resource management permit
1.4application process; requiring the Pollution Control Agency to issue separate
1.5permits for the construction and operation of certain facilities; modifying the
1.6expedited permitting process of the Pollution Control Agency; requiring petitioners
1.7for environmental assessment worksheets to reside in the affected or adjoining
1.8counties; authorizing local governments to begin reviewing feedlot permit
1.9applications before environmental review is complete; eliminating scoping
1.10environmental assessment worksheet requirements for projects requiring an
1.11environmental impact statement; requiring modification of the state implementation
1.12plan; requiring reports; appropriating money; amending Minnesota Statutes 2024,
1.13sections 116.03, subdivision 2b; 116.07, subdivisions 4a, 4d; 116D.04, subdivisions
1.142a, 2b.
1.15BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.16Section 1. Minnesota Statutes 2024, section 116.03, subdivision 2b, is amended to read:
1.17Subd. 2b. Permitting efficiency. (a) It is the goal of the state that environmental and
1.18resource management permits be issued or denied within 90 days for tier 1 permits or 150
1.19days for tier 2 permits following submission of a permit application. The commissioner of
1.20the Pollution Control Agency deleted text begin shall deleted text end new text begin must new text end establish management systems designed to achieve
1.21the goal. For the purposes of this section, "tier 1 permits" are permits that do not require
1.22individualized actions or public comment periods, and "tier 2 permits" are permits that
1.23require individualized actions or public comment periods. new text begin Goals established in this paragraph new text end
1.24 new text begin do not apply to permit applications required due to agency enforcement actions. new text end
1.25(b) The commissioner deleted text begin shall deleted text end new text begin must new text end prepare an annual permitting efficiency report that
1.26includes statistics on meeting the new text begin tier 2 new text end goal in paragraph (a) and the criteria for tier 2 by
1.27permit categories. The report deleted text begin is due deleted text end new text begin must be submitted to the governor and to the chairs and new text end
2.1 new text begin ranking minority members of the house of representatives and senate committees having new text end
2.2 new text begin jurisdiction over environment policy and finance by October 1 new text end deleted text begin August 1 deleted text end each year new text begin and must new text end
2.3 new text begin be posted on the agency's website new text end . new text begin The report must include: new text end
2.4 new text begin (1) new text end for new text begin each new text end permit deleted text begin applications deleted text end new text begin application new text end that deleted text begin have deleted text end new text begin has new text end not met the goal, deleted text begin the report deleted text end
2.5 deleted text begin must state the reasons for not meeting the goal. In stating the reasons for not meeting the deleted text end
2.6 deleted text begin goal, the commissioner shall separately identify delays deleted text end new text begin an explanation of whether the delay new text end
2.7 new text begin was new text end caused by the responsiveness of the proposer, lack of staff, scientific or technical
2.8disagreements, or the level of public engagement deleted text begin . The report must specify deleted text end new text begin ; new text end
2.9 new text begin (2) for each permit that has not met the goal, new text end the number of days from initial submission
2.10of the application to the day of determination that the application is complete deleted text begin . The report deleted text end
2.11 deleted text begin must aggregate deleted text end new text begin ; new text end
2.12 new text begin (3) a summary of new text end the data for the deleted text begin year deleted text end new text begin reporting period new text end and deleted text begin assess deleted text end new text begin an assessment of new text end
2.13whether program or system changes are necessary to achieve the new text begin tier 2 new text end goal deleted text begin . The report deleted text end
2.14 deleted text begin must be posted on the agency's website and submitted to the governor and the chairs and deleted text end
2.15 deleted text begin ranking minority members of the house of representatives and senate committees having deleted text end
2.16 deleted text begin jurisdiction over environment policy and finance. deleted text end new text begin in paragraph (a); new text end
2.17 new text begin (4) a statement of the number of tier 2 permits completed within the reporting period new text end
2.18 new text begin and, immediately following in parentheses, a statement of the percentage of total applications new text end
2.19 new text begin received for that tier 2 permit category that the number represents, stated separately for new text end
2.20 new text begin industrial and municipal permits; and new text end
2.21 new text begin (5) for permits that did not meet the goal due to lack of staff, a combined estimate of new text end
2.22 new text begin the aggregate staff resources that would have been necessary for all affected permits to meet new text end
2.23 new text begin the goal. new text end
2.24(c) The commissioner deleted text begin shall deleted text end new text begin must new text end allow electronic submission of environmental review
2.25and permit documents to the agency.
2.26(d) Within 30 business days of application for a permit subject to paragraph (a), the
2.27commissioner of the Pollution Control Agency deleted text begin shall deleted text end new text begin must new text end notify the permit applicant, in
2.28writing, deleted text begin whether the application is complete or incomplete. If the commissioner determines deleted text end
2.29 deleted text begin that an application is incomplete, the notice to the applicant must enumerate deleted text end new text begin of new text end all
2.30deficiencies deleted text begin , deleted text end new text begin while new text end citing specific provisions of the applicable rules and statutes, and new text begin must new text end
2.31advise the applicant on how the deficiencies can be remedied. new text begin The applicant shall have five new text end
2.32 new text begin business days to remedy all identified deficiencies before the commissioner determines that new text end
2.33 new text begin the application is complete or incomplete. new text end If the commissioner determines that the application
2.34is complete, the deleted text begin notice deleted text end new text begin commissioner new text end must confirm the application's tier 1 or tier 2 permit
3.1status. If the commissioner believes that a complete application for a tier 2 construction
3.2permit cannot be issued within the 150-day goal, the commissioner must provide notice to
3.3the applicant with the commissioner's notice that the application is complete and, upon
3.4request of the applicant, provide the permit applicant with a schedule estimating when the
3.5agency will begin drafting the permit and issue the public notice of the draft permit. This
3.6paragraph does not apply to an application for a permit that is subject to a grant or loan
3.7agreement under chapter 446A.
3.8(e) For purposes of this subdivision, "permit professional" means an individual not
3.9employed by the Pollution Control Agency who:
3.10(1) has a professional license issued by the state of Minnesota in the subject area of the
3.11permit;
3.12(2) has at least ten years of experience in the subject area of the permit; and
3.13(3) abides by the duty of candor applicable to employees of the Pollution Control Agency
3.14under agency rules and complies with all applicable requirements under chapter 326.
3.15(f) Upon the agency's request, an applicant relying on a permit professional must
3.16participate in a meeting with the agency before submitting an application:
3.17(1) at least two weeks prior to the preapplication meeting, the applicant must submit at
3.18least the following:
3.19(i) project description, including, but not limited to, scope of work, primary emissions
3.20points, discharge outfalls, and water intake points;
3.21(ii) location of the project, including county, municipality, and location on the site;
3.22(iii) business schedule for project completion; and
3.23(iv) other information requested by the agency at least four weeks prior to the scheduled
3.24meeting; and
3.25(2) during the preapplication meeting, the agency deleted text begin shall deleted text end new text begin must new text end provide for the applicant
3.26at least the following:
3.27(i) an overview of the permit review program;
3.28(ii) a determination of which specific application or applications will be necessary to
3.29complete the project;
3.30(iii) a statement notifying the applicant if the specific permit being sought requires a
3.31mandatory public hearing or comment period;
4.1(iv) a review of the timetable established in the permit review program for the specific
4.2permit being sought; and
4.3(v) a determination of what information must be included in the application, including
4.4a description of any required modeling or testing.
4.5(g) The applicant may select a permit professional to undertake the preparation of the
4.6permit application and draft permit.
4.7(h) If a preapplication meeting was held, the agency deleted text begin shall deleted text end new text begin must new text end , within seven business
4.8days of receipt of an application, notify the applicant and submitting permit professional
4.9that the application is complete or is denied, specifying the deficiencies of the application.
4.10(i) Upon receipt of notice that the application is complete, the permit professional deleted text begin shall deleted text end
4.11 new text begin must new text end submit to the agency a timetable for submitting a draft permit. The permit professional
4.12 deleted text begin shall deleted text end new text begin must new text end submit a draft permit on or before the date provided in the timetable. Within 60
4.13days after the close of the public comment period, the commissioner deleted text begin shall deleted text end new text begin must new text end notify the
4.14applicant whether the permit can be issued.
4.15(j) Nothing in this section shall be construed to modify:
4.16(1) any requirement of law that is necessary to retain federal delegation to or assumption
4.17by the state; or
4.18(2) the authority to implement a federal law or program.
4.19(k) The permit application and draft permit deleted text begin shall deleted text end new text begin must new text end identify or include as an appendix
4.20all studies and other sources of information used to substantiate the analysis contained in
4.21the permit application and draft permit. The commissioner deleted text begin shall deleted text end new text begin must new text end request additional
4.22studies, if needed, and the permit applicant deleted text begin shall deleted text end new text begin must new text end submit all additional studies and
4.23information necessary for the commissioner to perform the commissioner's responsibility
4.24to review, modify, and determine the completeness of the application and approve the draft
4.25permit.
4.26Sec. 2. Minnesota Statutes 2024, section 116.07, subdivision 4a, is amended to read:
4.27Subd. 4a. Permits. (a) The Pollution Control Agency may issue, continue in effect or
4.28deny permits, under such conditions as it may prescribe for the prevention of pollution, for
4.29the emission of air contaminants, or for the installation or operation of any emission facility,
4.30air contaminant treatment facility, treatment facility, potential air contaminant storage
4.31facility, or storage facility, or any part thereof, or for the sources or emissions of noise
4.32pollution. new text begin The Pollution Control Agency may issue separate permits for constructing a new text end
5.1 new text begin facility described in this paragraph and for its operation, except for a facility required to new text end
5.2 new text begin complete a mandatory environmental impact statement under Minnesota Rules, part new text end
5.3 new text begin 4410.4400. The Pollution Control Agency must prioritize these permits in a manner that new text end
5.4 new text begin minimizes the time required to construct and begin operation of the permitted facility while new text end
5.5 new text begin complying with state and federal requirements. new text end
5.6(b) The Pollution Control Agency may also issue, continue in effect or deny permits,
5.7under such conditions as it may prescribe for the prevention of pollution, for the storage,
5.8collection, transportation, processing, or disposal of waste, or for the installation or operation
5.9of any system or facility, or any part thereof, related to the storage, collection, transportation,
5.10processing, or disposal of waste.
5.11(c) The agency may not issue a permit to a facility without analyzing and considering
5.12the cumulative levels and effects of past and current environmental pollution from all sources
5.13on the environment and residents of the geographic area within which the facility's emissions
5.14are likely to be deposited, provided that the facility is located in a community in a city of
5.15the first class in Hennepin County that meets all of the following conditions:
5.16(1) is within a half mile of a site designated by the federal government as an EPA
5.17superfund site due to residential arsenic contamination;
5.18(2) a majority of the population are low-income persons of color and American Indians;
5.19(3) a disproportionate percent of the children have childhood lead poisoning, asthma,
5.20or other environmentally related health problems;
5.21(4) is located in a city that has experienced numerous air quality alert days of dangerous
5.22air quality for sensitive populations between February 2007 and February 2008; and
5.23(5) is located near the junctions of several heavily trafficked state and county highways
5.24and two one-way streets which carry both truck and auto traffic.
5.25(d) The Pollution Control Agency may revoke or modify any permit issued under this
5.26subdivision and section 116.081 whenever it is necessary, in the opinion of the agency, to
5.27prevent or abate pollution.
5.28(e) The Pollution Control Agency has the authority for approval over the siting, expansion,
5.29or operation of a solid waste facility with regard to environmental issues. However, the
5.30agency's issuance of a permit does not release the permittee from any liability, penalty, or
5.31duty imposed by any applicable county ordinances. Nothing in this chapter precludes, or
5.32shall be construed to preclude, a county from enforcing land use controls, regulations, and
5.33ordinances existing at the time of the permit application and adopted pursuant to Minnesota
6.1Statutes 2020, sections 366.10 to 366.181, or sections 394.21 to 394.37, or 462.351 to
6.2462.365, with regard to the siting, expansion, or operation of a solid waste facility.
6.3(f) Except as prohibited by federal law, a person may commence construction,
6.4reconstruction, replacement, or modification of any facility prior to the issuance of a
6.5construction permit by the agency.
6.6Sec. 3. Minnesota Statutes 2024, section 116.07, subdivision 4d, is amended to read:
6.7Subd. 4d. Permit fees. (a) The agency may collect permit fees in amounts not greater
6.8than those necessary to cover the reasonable costs of developing, reviewing, and acting
6.9upon applications for agency permits and implementing and enforcing the conditions of the
6.10permits pursuant to agency rules. Permit fees shall not include the costs of litigation. The
6.11fee schedule must reflect reasonable and routine direct and indirect costs associated with
6.12permitting, implementation, and enforcement. The agency may impose an additional
6.13enforcement fee to be collected for a period of up to two years to cover the reasonable costs
6.14of implementing and enforcing the conditions of a permit under the rules of the agency.
6.15Any money collected under this paragraph shall be deposited in the environmental fund.
6.16(b) Notwithstanding paragraph (a), the agency shall collect an annual fee from the owner
6.17or operator of all stationary sources, emission facilities, emissions units, air contaminant
6.18treatment facilities, treatment facilities, potential air contaminant storage facilities, or storage
6.19facilities subject to a notification, permit, or license requirement under this chapter,
6.20subchapters I and V of the federal Clean Air Act, United States Code, title 42, section 7401
6.21et seq., or rules adopted thereunder. The annual fee shall be used to pay for all direct and
6.22indirect reasonable costs, including legal costs, required to develop and administer the
6.23notification, permit, or license program requirements of this chapter, subchapters I and V
6.24of the federal Clean Air Act, United States Code, title 42, section 7401 et seq., or rules
6.25adopted thereunder. Those costs include the reasonable costs of reviewing and acting upon
6.26an application for a permit; implementing and enforcing statutes, rules, and the terms and
6.27conditions of a permit; emissions, ambient, and deposition monitoring; preparing generally
6.28applicable regulations; responding to federal guidance; modeling, analyses, and
6.29demonstrations; preparing inventories and tracking emissions; and providing information
6.30to the public about these activities.
6.31(c) The agency shall set fees that:
6.32(1) will result in the collection, in the aggregate, from the sources listed in paragraph
6.33(b), of an amount not less than $25 per ton of each volatile organic compound; pollutant
6.34regulated under United States Code, title 42, section 7411 or 7412 (section 111 or 112 of
7.1the federal Clean Air Act); and each pollutant, except carbon monoxide, for which a national
7.2primary ambient air quality standard has been promulgated;
7.3(2) may result in the collection, in the aggregate, from the sources listed in paragraph
7.4(b), of an amount not less than $25 per ton of each pollutant not listed in clause (1) that is
7.5regulated under this chapter or air quality rules adopted under this chapter; and
7.6(3) shall collect, in the aggregate, from the sources listed in paragraph (b), the amount
7.7needed to match grant funds received by the state under United States Code, title 42, section
7.87405 (section 105 of the federal Clean Air Act).
7.9The agency must not include in the calculation of the aggregate amount to be collected
7.10under clauses (1) and (2) any amount in excess of 4,000 tons per year of each air pollutant
7.11from a source. The increase in air permit fees to match federal grant funds shall be a surcharge
7.12on existing fees. The commissioner may not collect the surcharge after the grant funds
7.13become unavailable. In addition, the commissioner shall use nonfee funds to the extent
7.14practical to match the grant funds so that the fee surcharge is minimized.
7.15(d) To cover the reasonable costs described in paragraph (b), the agency shall provide
7.16in the rules promulgated under paragraph (c) for an increase in the fee collected in each
7.17year by the percentage, if any, by which the Consumer Price Index for the most recent
7.18calendar year ending before the beginning of the year the fee is collected exceeds the
7.19Consumer Price Index for the calendar year 1989. For purposes of this paragraph the
7.20Consumer Price Index for any calendar year is the average of the Consumer Price Index for
7.21all-urban consumers published by the United States Department of Labor, as of the close
7.22of the 12-month period ending on August 31 of each calendar year. The revision of the
7.23Consumer Price Index that is most consistent with the Consumer Price Index for calendar
7.24year 1989 shall be used.
7.25(e) Any money collected under paragraphs (b) to (d) must be deposited in the
7.26environmental fund and must be used solely for the activities listed in paragraph (b).
7.27(f) Permit applicants who wish to construct, reconstruct, or modify a project may deleted text begin offer deleted text end
7.28 new text begin request expedited permitting under this paragraph. An applicant requesting expedited new text end
7.29 new text begin permitting under this paragraph must agree new text end to reimburse the agency for the costs of staff
7.30time or consultant services needed to expedite the preapplication process and permit
7.31development process through the final decision on the permit, including the analysis of
7.32environmental review documents. The reimbursement deleted text begin shall be deleted text end new text begin is new text end in addition to permit
7.33application fees imposed by law. deleted text begin When the agency determines that it needs additional deleted text end
7.34 deleted text begin resources to develop the permit application in an expedited manner, and that expediting the deleted text end
8.1 deleted text begin development is consistent with permitting program priorities, the agency may accept the deleted text end
8.2 deleted text begin reimbursement. deleted text end The commissioner must give the applicant an estimate of new text begin the timeline and new text end
8.3costs to be incurred by the commissioner. The estimate must include a brief description of
8.4the tasks to be performed, a schedule for completing the tasks, and the estimated cost for
8.5each task. new text begin If the applicant agrees to the estimated timeline and costs negotiated with the new text end
8.6 new text begin commissioner, new text end the applicant and the commissioner must enter into a written agreement
8.7 deleted text begin detailing the estimated costs for the expedited permit decision-making process to be incurred deleted text end
8.8 deleted text begin by the agency deleted text end new text begin to proceed accordingly new text end . The agreement must deleted text begin also deleted text end identify staff anticipated
8.9to be assigned to the project. new text begin The agreement may provide that, if permitting is completed new text end
8.10 new text begin ahead of the schedule set forth in the written agreement, the commissioner may retain any new text end
8.11 new text begin fees that would have been due if the permitting had taken the time contemplated in the new text end
8.12 new text begin written agreement. Fees retained by the commissioner under this paragraph are appropriated new text end
8.13 new text begin to the commissioner for administering the commissioner's permitting duties. new text end The
8.14commissioner must not issue a permit until the applicant has paid all fees in full. The
8.15commissioner must refund any unobligated balance of fees paid. Reimbursements accepted
8.16by the agency are appropriated to the agency for the purpose of developing the permit or
8.17analyzing environmental review documents. Reimbursement by a permit applicant shall
8.18precede and not be contingent upon issuance of a permit; shall not affect the agency's decision
8.19on whether to issue or deny a permit, what conditions are included in a permit, or the
8.20application of state and federal statutes and rules governing permit determinations; and shall
8.21not affect final decisions regarding environmental review.
8.22(g) The fees under this subdivision are exempt from section 16A.1285.
8.23Sec. 4. Minnesota Statutes 2024, section 116D.04, subdivision 2a, is amended to read:
8.24Subd. 2a. When prepared. (a) Where there is potential for significant environmental
8.25effects resulting from any major governmental action, the action must be preceded by a
8.26detailed environmental impact statement prepared by the responsible governmental unit.
8.27The environmental impact statement must be an analytical rather than an encyclopedic
8.28document that describes the proposed action in detail, analyzes its significant environmental
8.29impacts, discusses appropriate alternatives to the proposed action and their impacts, and
8.30explores methods by which adverse environmental impacts of an action could be mitigated.
8.31The environmental impact statement must also analyze those economic, employment, and
8.32sociological effects that cannot be avoided should the action be implemented. To ensure its
8.33use in the decision-making process, the environmental impact statement must be prepared
8.34as early as practical in the formulation of an action.
9.1(b) The board deleted text begin shall deleted text end new text begin must new text end by rule establish categories of actions for which environmental
9.2impact statements and for which environmental assessment worksheets must be prepared
9.3as well as categories of actions for which no environmental review is required under this
9.4section. A mandatory environmental assessment worksheet is not required for the expansion
9.5of an ethanol plant, as defined in section 41A.09, subdivision 2a, paragraph (b), or the
9.6conversion of an ethanol plant to a biobutanol facility or the expansion of a biobutanol
9.7facility as defined in section 41A.15, subdivision 2d, based on the capacity of the expanded
9.8or converted facility to produce alcohol fuel, but must be required if the ethanol plant or
9.9biobutanol facility meets or exceeds thresholds of other categories of actions for which
9.10environmental assessment worksheets must be prepared. The responsible governmental unit
9.11for an ethanol plant or biobutanol facility project for which an environmental assessment
9.12worksheet is prepared is the state agency with the greatest responsibility for supervising or
9.13approving the project as a whole.
9.14(c) A mandatory environmental impact statement is not required for a facility or plant
9.15located outside the seven-county metropolitan area that produces less than 125,000,000
9.16gallons of ethanol, biobutanol, or cellulosic biofuel annually, or produces less than 400,000
9.17tons of chemicals annually, if the facility or plant is: an ethanol plant, as defined in section
9.1841A.09, subdivision 2a, paragraph (b); a biobutanol facility, as defined in section 41A.15,
9.19subdivision 2d; or a cellulosic biofuel facility. A facility or plant that only uses a cellulosic
9.20feedstock to produce chemical products for use by another facility as a feedstock is not
9.21considered a fuel conversion facility as used in rules adopted under this chapter.
9.22(d) The responsible governmental unit deleted text begin shall deleted text end new text begin must new text end promptly publish notice of the
9.23completion of an environmental assessment worksheet by publishing the notice in at least
9.24one newspaper of general circulation in the geographic area where the project is proposed,
9.25by posting the notice on a website that has been designated as the official publication site
9.26for publication of proceedings, public notices, and summaries of a political subdivision in
9.27which the project is proposed, or in any other manner determined by the board and deleted text begin shall deleted text end
9.28 new text begin must new text end provide copies of the environmental assessment worksheet to the board and its member
9.29agencies. Comments on the need for an environmental impact statement may be submitted
9.30to the responsible governmental unit during a 30-day period following publication of the
9.31notice that an environmental assessment worksheet has been completed. The responsible
9.32governmental unit may extend the 30-day comment period for an additional 30 days one
9.33time. Further extensions of the comment period may not be made unless approved by the
9.34project's proposer. The responsible governmental unit's decision on the need for an
9.35environmental impact statement must be based on the environmental assessment worksheet
10.1and the comments received during the comment period, and must be made within 15 days
10.2after the close of the comment period. The board's chair may extend the 15-day period by
10.3not more than 15 additional days upon the request of the responsible governmental unit.
10.4(e) An environmental assessment worksheet must also be prepared for a proposed action
10.5whenever material evidence accompanying a petition by not less than 100 individuals who
10.6reside or own property in deleted text begin the state deleted text end new text begin a Minnesota county where the proposed action will be new text end
10.7 new text begin undertaken or in one or more adjoining counties new text end , submitted before the proposed project has
10.8received final approval by the appropriate governmental units, demonstrates that, because
10.9of the nature or location of a proposed action, there may be potential for significant
10.10environmental effects. Petitions requesting the preparation of an environmental assessment
10.11worksheet must be submitted to the board. The chair of the board deleted text begin shall deleted text end new text begin must new text end determine the
10.12appropriate responsible governmental unit and forward the petition to it. A decision on the
10.13need for an environmental assessment worksheet must be made by the responsible
10.14governmental unit within 15 days after the petition is received by the responsible
10.15governmental unit. The board's chair may extend the 15-day period by not more than 15
10.16additional days upon request of the responsible governmental unit.
10.17(f) Except in an environmentally sensitive location where Minnesota Rules, part
10.184410.4300, subpart 29, item B, applies, the proposed action is exempt from environmental
10.19review under this chapter and rules of the board, if:
10.20(1) the proposed action is:
10.21(i) an animal feedlot facility with a capacity of less than 1,000 animal units; or
10.22(ii) an expansion of an existing animal feedlot facility with a total cumulative capacity
10.23of less than 1,000 animal units;
10.24(2) the application for the animal feedlot facility includes a written commitment by the
10.25proposer to design, construct, and operate the facility in full compliance with Pollution
10.26Control Agency feedlot rules; and
10.27(3) the county board holds a public meeting for citizen input at least ten business days
10.28before the Pollution Control Agency or county issuing a feedlot permit for the animal feedlot
10.29facility unless another public meeting for citizen input has been held with regard to the
10.30feedlot facility to be permitted. The exemption in this paragraph is in addition to other
10.31exemptions provided under other law and rules of the board.
10.32(g) The board may, before final approval of a proposed project, require preparation of
10.33an environmental assessment worksheet by a responsible governmental unit selected by the
11.1board for any action where environmental review under this section has not been specifically
11.2provided for by rule or otherwise initiated.
11.3(h) An early and open process must be used to limit the scope of the environmental
11.4impact statement to a discussion of those impacts that, because of the nature or location of
11.5the project, have the potential for significant environmental effects. The same process must
11.6be used to determine the form, content, and level of detail of the statement as well as the
11.7alternatives that are appropriate for consideration in the statement. In addition, the permits
11.8that will be required for the proposed action must be identified during the scoping process.
11.9Further, the process must identify those permits for which information will be developed
11.10concurrently with the environmental impact statement. The board deleted text begin shall deleted text end new text begin must new text end provide in its
11.11rules for the expeditious completion of the scoping process. The determinations reached in
11.12the process must be incorporated into the order requiring the preparation of an environmental
11.13impact statement.
11.14(i) The responsible governmental unit deleted text begin shall deleted text end new text begin must new text end , to the extent practicable, avoid
11.15duplication and ensure coordination between state and federal environmental review and
11.16between environmental review and environmental permitting. Whenever practical,
11.17information needed by a governmental unit for making final decisions on permits or other
11.18actions required for a proposed project must be developed in conjunction with the preparation
11.19of an environmental impact statement. When an environmental impact statement is prepared
11.20for a project requiring multiple permits for which two or more agencies' decision processes
11.21include either mandatory or discretionary hearings before a hearing officer before the
11.22agencies' decision on the permit, the agencies may, notwithstanding any law or rule to the
11.23contrary, conduct the hearings in a single consolidated hearing process if requested by the
11.24proposer. All agencies having jurisdiction over a permit that is included in the consolidated
11.25hearing deleted text begin shall deleted text end new text begin must new text end participate. The responsible governmental unit deleted text begin shall deleted text end new text begin must new text end establish
11.26appropriate procedures for the consolidated hearing process, including procedures to ensure
11.27that the consolidated hearing process is consistent with the applicable requirements for each
11.28permit regarding the rights and duties of parties to the hearing, and deleted text begin shall deleted text end new text begin must new text end use the earliest
11.29applicable hearing procedure to initiate the hearing. All agencies having jurisdiction over
11.30a permit identified in the draft environmental assessment worksheet scoping document must
11.31begin reviewing any permit application upon publication of the notice of preparation of the
11.32environmental impact statement.
11.33(j) An environmental impact statement must be prepared and its adequacy determined
11.34within 280 days after notice of its preparation unless the time is extended by consent of the
11.35parties or by the governor for good cause. The responsible governmental unit deleted text begin shall deleted text end new text begin must new text end
12.1determine the adequacy of an environmental impact statement, unless within 60 days after
12.2notice is published that an environmental impact statement will be prepared, the board
12.3chooses to determine the adequacy of an environmental impact statement. If an environmental
12.4impact statement is found to be inadequate, the responsible governmental unit has 60 days
12.5to prepare an adequate environmental impact statement.
12.6(k) The proposer of a specific action may include in the information submitted to the
12.7responsible governmental unit a preliminary draft environmental impact statement under
12.8this section on that action for review, modification, and determination of completeness and
12.9adequacy by the responsible governmental unit. A preliminary draft environmental impact
12.10statement prepared by the project proposer and submitted to the responsible governmental
12.11unit must identify or include as an appendix all studies and other sources of information
12.12used to substantiate the analysis contained in the preliminary draft environmental impact
12.13statement. The responsible governmental unit deleted text begin shall deleted text end new text begin must new text end require additional studies, if needed,
12.14and obtain from the project proposer all additional studies and information necessary for
12.15the responsible governmental unit to perform its responsibility to review, modify, and
12.16determine the completeness and adequacy of the environmental impact statement.
12.17Sec. 5. Minnesota Statutes 2024, section 116D.04, subdivision 2b, is amended to read:
12.18Subd. 2b. Project prerequisites. new text begin (a) new text end If an environmental assessment worksheet or an
12.19environmental impact statement is required for a governmental action under subdivision
12.202a, a project may not be started and a final governmental decision may not be made to grant
12.21a permit, approve a project, or begin a project, until:
12.22(1) a petition for an environmental assessment worksheet is dismissed;
12.23(2) a negative declaration has been issued on the need for an environmental impact
12.24statement;
12.25(3) the environmental impact statement has been determined adequate; or
12.26(4) a variance has been granted from making an environmental impact statement by the
12.27environmental quality board.
12.28 new text begin (b) Nothing in this subdivision precludes a local unit of government from beginning to new text end
12.29 new text begin review a feedlot permit application for a feedlot subject to environmental review under this new text end
12.30 new text begin chapter. new text end
13.1Sec. 6. new text begin SCOPING ENVIRONMENTAL ASSESSMENT WORKSHEET NOT new text end
13.2 new text begin REQUIRED FOR PROJECTS THAT REQUIRE A MANDATORY new text end
13.3 new text begin ENVIRONMENTAL IMPACT STATEMENT. new text end
13.4 new text begin (a) The Environmental Quality Board must amend Minnesota Rules, part 4410.2100, as new text end
13.5 new text begin follows: new text end
13.6 new text begin (1) to provide that an environmental assessment worksheet does not need to be prepared new text end
13.7 new text begin for a project that falls within a mandatory environmental impact statement category under new text end
13.8 new text begin Minnesota Rules, part 4410.4400, or other applicable law; and new text end
13.9 new text begin (2) to provide that a scoping process undertaken under Minnesota Rules, part 4410.2100, new text end
13.10 new text begin must be completed no later than 280 days after the process begins. new text end
13.11 new text begin (b) The board may use the good cause exemption under Minnesota Statutes, section new text end
13.12 new text begin 14.388, subdivision 1, clause (3), to adopt rules under this section, and Minnesota Statutes, new text end
13.13 new text begin section 14.386, does not apply except as provided under Minnesota Statutes, section 14.388. new text end
13.14Sec. 7. new text begin STATE IMPLEMENTATION PLAN REVISIONS. new text end
13.15 new text begin The commissioner of the Pollution Control Agency must seek approval from the federal new text end
13.16 new text begin Environmental Protection Agency for revisions to the state's federal Clean Air Act state new text end
13.17 new text begin implementation plan if changes are needed to reflect the requirements of Minnesota Statutes, new text end
13.18 new text begin section 116.07, subdivision 4a, as amended by this act. new text end
13.19Sec. 8. new text begin INTENT. new text end
13.20 new text begin The legislature recognizes the need to retain and grow the state's economy and vital new text end
13.21 new text begin infrastructure to keep Minnesota competitive on a national and global level. This growth new text end
13.22 new text begin requires innovation and creativity, which will be achieved while protecting our environment new text end
13.23 new text begin and natural resources as prescribed under current law. It is therefore the intent of the new text end
13.24 new text begin legislature in enacting this bill that the state will meet or exceed efficiency goals, modernize new text end
13.25 new text begin existing regulatory systems, and communicate clearly to permit applicants and stakeholders new text end
13.26 new text begin to ensure a predictable, transparent, and fair permitting and environmental review process. new text end
13.27Sec. 9. new text begin REPORT ON USE OF AUTHORITY TO EXTEND TIMELINE FOR new text end
13.28 new text begin CERTAIN AGENCY ACTIONS. new text end
13.29 new text begin By October 1, 2027, the Board of Water and Soil Resources must report to the chairs new text end
13.30 new text begin and ranking minority members of the legislative committees with jurisdiction over new text end
13.31 new text begin environment and natural resources policy on the number of extensions under Minnesota new text end
14.1 new text begin Statutes, section 15.99, subdivision 3, paragraph (f), that are made for any determination new text end
14.2 new text begin under Minnesota Statutes, sections 103G.221 to 103G.2375, between July 1, 2025, and June new text end
14.3 new text begin 30, 2027. A local government unit must supply the board with information necessary to new text end
14.4 new text begin prepare the report required by this section. new text end
14.5Sec. 10. new text begin APPROPRIATION; MINNESOTA BUSINESS FIRST STOP. new text end
14.6 new text begin $325,000 in fiscal year 2026 and $325,000 in fiscal year 2027 are appropriated from the new text end
14.7 new text begin general fund to the commissioner of employment and economic development for the new text end
14.8 new text begin Minnesota Business First Stop program. new text end
Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.