SF372

Earlier appropriation for flood hazard mitigation amendment
Legislative Session 94 (2025-2026)

Related bill: HF605

Bill text

Introduction

ReadChanges
PDF
(underlined = new law, struck through = current law the bill removes)
1.1A bill for an act
1.2relating to capital investment; amending an earlier appropriation for flood hazard
1.3mitigation; amending Laws 2023, chapter 72, article 1, section 7, subdivision 8,
1.4as amended.
1.5BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.6Section 1. Laws 2023, chapter 72, article 1, section 7, subdivision 8, as amended by Laws
1.72024, chapter 88, article 2, section 15, is amended to read:
1.8Subd. 8. Flood Hazard Mitigation 40,300,000
1.9(a) For the state share of flood hazard
1.10mitigation grants for publicly owned capital
1.11improvements to prevent or alleviate flood
1.12damage under Minnesota Statutes, section
1.13103F.161. To the extent practical, levee
1.14projects shall meet the state standard of three
1.15feet above the 100-year flood elevation.
1.16(b) Project priorities shall be determined by
1.17the commissioner as appropriate, based on
1.18need and consideration of available leveraging
1.19of federal, state, and local funds.
1.20(c) Notwithstanding paragraph (b), $3,300,000
1.21of this appropriation is for a grant to the city
1.22of Browns Valley for Phase II of the Toelle
1.23Coulee project to mitigate flood risks posed
2.1to the city, including construction of an East
2.2Levee, County State-Aid Highway 2 culvert
2.3replacement, and marked Trunk Highway 28
2.4culvert replacement.
2.5(d) Notwithstanding paragraph (b), $5,000,000
2.6of this appropriation is for grants to watershed
2.7districts that are members of the Red River
2.8Watershed Management Board for flood
2.9mitigation projects and is not for projects in
2.10the city of Moorhead.
2.11(e) Notwithstanding paragraph (b),
2.12$11,000,000 is for a grant to the city of
2.13Moorhead to design, construct, and equip
2.14flood mitigation infrastructure. This
2.15appropriation includes money for Phase 2 of
2.16the North Moorhead levee project, the
2.17relocation of sanitary lift station #2, and a
2.18levee project along First Avenue North.
2.19(f) Notwithstanding paragraph (b), $6,000,000
2.20is from the general fund for a grant to the city
2.21of Carver for capital improvements to restore
2.22the Carver levee protecting an important
2.23historic district in Minnesota from flood
2.24waters of the Minnesota River. This levee
2.25restoration must meet the requirements for
2.26FEMA certification. The project includes
2.27predesign, design, engineering, land
2.28acquisition, and construction of capital
2.29improvements, including raising the height of
2.30the Carver levee, constructing internal
2.31drainage, establishing maintainable setbacks
2.32to adjacent structures, and certification by
2.33FEMA.
2.34 new text begin (g) Notwithstanding paragraph (b), $175,000 new text end
2.35 new text begin is for a grant to the Chisago Lakes Lake new text end
3.1 new text begin Improvement District to repair the Lofton new text end
3.2 new text begin Avenue weir and the Lake Ellen weir in the new text end
3.3 new text begin Chisago Lakes Lake Improvement District. new text end
3.4 deleted text begin (g) deleted text end new text begin (h) new text end To the extent practicable and consistent
3.5with the project, recipients of appropriations
3.6for flood control projects in this subdivision
3.7shall create wetlands that are eligible for
3.8wetland replacement credit to replace wetlands
3.9drained or filled as the result of repair,
3.10reconstruction, replacement, or rehabilitation
3.11of an existing public road under Minnesota
3.12Statutes, section 103G.222, subdivision 1,
3.13paragraphs (l) and (m).
3.14 deleted text begin (h) deleted text end new text begin (i) new text end To the extent that the cost of a
3.15municipal project exceeds two percent of the
3.16median household income in the municipality
3.17multiplied by the number of households in the
3.18municipality, this appropriation is also for the
3.19local share of the project.
3.20 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end

Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.

Progress through the legislative process

17%
In Committee
Loading…