SF291

Vehicle miles traveled project assessment criteria requirements amendment provision and electric vehicle and zero-emission bus technology as mitigation activities authorization
Legislative Session 94 (2025-2026)

Bill text

Introduction

ReadChanges
PDF
(underlined = new law, struck through = current law the bill removes)
1.1A bill for an act
1.2relating to transportation; amending project assessment criteria for vehicle miles
1.3traveled requirements; authorizing electric vehicle and zero-emission bus
1.4technology as mitigation activities; amending Minnesota Statutes 2024, section
1.5161.178, subdivisions 2, 4, 6, 7.
1.6BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.7Section 1. Minnesota Statutes 2024, section 161.178, subdivision 2, is amended to read:
1.8Subd. 2. Project or portfolio assessment. (a) Prior to inclusion of a project or portfolio
1.9in the state transportation improvement program or in a metropolitan transportation
1.10improvement program, the applicable entity must perform an impact assessment of the
1.11project or portfolio new text begin and evaluate the project under, if applicable, both the state transportation new text end
1.12 new text begin improvement plan and the metropolitan transportation improvement plan new text end . Following the
1.13assessment, the applicable entity must determine if the project or portfolio is proportionally
1.14in conformance new text begin , either under an individual program or in combination, where applicable, new text end
1.15with:
1.16(1) the greenhouse gas emissions reduction targets under section 174.01, subdivision 3;
1.17and
1.18(2) the vehicle miles traveled reduction targets established in the statewide multimodal
1.19transportation plan under section 174.03, subdivision 1a.
1.20(b) If the applicable entity determines that the project or portfolio is not in conformance
1.21with paragraph (a), the applicable entity must:
2.1(1) alter the scope or design of the project or any number of projects, add or remove one
2.2or more projects from the portfolio, or undertake a combination, and subsequently perform
2.3a revised assessment that meets the requirements under this section;
2.4(2) interlink sufficient impact mitigation as provided in subdivision 4; or
2.5(3) halt project development and disallow inclusion of the project or portfolio in the
2.6appropriate transportation improvement program.
2.7 new text begin EFFECTIVE DATE. This section is effective July 1, 2025, and applies to projects new text end
2.8 new text begin assessed on or after that date. new text end
2.9Sec. 2. Minnesota Statutes 2024, section 161.178, subdivision 4, is amended to read:
2.10Subd. 4. Impact mitigation; interlinking. (a) To provide for impact mitigation, the
2.11applicable entity must interlink the project or portfolio as provided in this subdivision.
2.12(b) Impact mitigation is sufficient under subdivision 2, paragraph (b), if the project or
2.13portfolio is interlinked to offset actions such that the total greenhouse gas emissions reduction
2.14from the offset actions, after accounting for the greenhouse gas emissions otherwise resulting
2.15from the project or portfolio, is consistent with meeting the targets specified under subdivision
2.162, paragraph (a) new text begin , clause (1) new text end . Each comparison under this paragraph must be performed over
2.17equal comparison periods.
2.18(c) An offset action consists of a project, program, operations modification, or mitigation
2.19plan in one or more of the following areas:
2.20(1) transit expansion, including but not limited to regular route bus, arterial bus rapid
2.21transit, highway bus rapid transit, rail transit, and intercity passenger rail;
2.22(2) transit service improvements, including but not limited to increased service level,
2.23transit fare reduction, and transit priority treatments;
2.24(3) active transportation infrastructure;
2.25(4) micromobility infrastructure and service, including but not limited to shared vehicle
2.26services;
2.27(5) transportation demand management, including but not limited to vanpool and shared
2.28vehicle programs, remote work, and broadband access expansion;
2.29(6) parking management, including but not limited to parking requirements reduction
2.30or elimination and parking cost adjustments;
3.1(7) land use, including but not limited to residential and other density increases, mixed-use
3.2development, and transit-oriented development;
3.3(8) infrastructure improvements related to traffic operations, including but not limited
3.4to roundabouts and reduced conflict intersections;
3.5(9) natural systems, including but not limited to prairie restoration, reforestation, and
3.6urban green space; deleted text begin and deleted text end
3.7(10) new text begin accelerated electric vehicle and other zero-emission vehicle adoption, including new text end
3.8 new text begin but not limited to electric vehicle infrastructure and zero-emission transit bus procurement new text end
3.9 new text begin under the requirements specified in law; and new text end
3.10 new text begin (11) new text end as specified by the commissioner in the manner provided under paragraph (e).
3.11(d) An offset action may be identified as interlinked to the project or portfolio if:
3.12(1) there is a specified project, program, modification, or mitigation plan;
3.13(2) the necessary funding sources are identified and sufficient amounts are committed;
3.14(3) the mitigation is localized as provided in subdivision 5; and
3.15(4) procedures are established to ensure that the mitigation action remains in substantially
3.16the same form or a revised form that continues to meet the calculation under paragraph (b).
3.17(e) The commissioner may authorize additional offset actions under paragraph (c) if:
3.18(1) the offset action is reviewed and recommended by the technical advisory committee
3.19under section 161.1782; and
3.20(2) the commissioner determines that the offset action is directly related to reduction in
3.21the transportation sector of greenhouse gas emissions or vehicle miles traveled.
3.22 new text begin EFFECTIVE DATE. This section is effective July 1, 2025, and applies to projects new text end
3.23 new text begin assessed on or after that date. new text end
3.24Sec. 3. Minnesota Statutes 2024, section 161.178, subdivision 6, is amended to read:
3.25Subd. 6. Public information. The commissioner must publish information regarding
3.26impact assessments on the department's website. The information must include:
3.27(1) for each project evaluated separately under this section, identification of the project;
3.28(2) for each project evaluated separately, a summary that includes an overview of the
3.29assessment, the impact determination by the commissioner, and project disposition, including
3.30a review of any offset actions;
4.1(3) for each portfolio of projects, an overview of the projects, the impact determination
4.2by the commissioner, and a summary of any offset actions;
4.3(4) a review of any interpretation of or additions to offset actions under subdivision 4;
4.4(5) identification of the date established by the commissioner under subdivision 2a,
4.5paragraph (b); deleted text begin and deleted text end
4.6(6) new text begin identification of any exemptions provided under subdivision 7, paragraph (b); and new text end
4.7 new text begin (7) new text end a summary of the activities of the technical advisory committee under section
4.8161.1782, including but not limited to any findings or recommendations made by the advisory
4.9committee.
4.10 new text begin EFFECTIVE DATE. This section is effective July 1, 2025, and applies to projects new text end
4.11 new text begin assessed on or after that date. new text end
4.12Sec. 4. Minnesota Statutes 2024, section 161.178, subdivision 7, is amended to read:
4.13Subd. 7. Safety and well-being. new text begin (a) new text end The requirements of this section are in addition to
4.14and must not supplant the safety and well-being goals established under section 174.01,
4.15subdivision 2, clauses (1) and (2).
4.16 new text begin (b) The commissioner may exempt a project from the requirements under this section new text end
4.17 new text begin if the commissioner: new text end
4.18 new text begin (1) identifies a priority for urgent traffic safety response to traffic fatalities or serious new text end
4.19 new text begin injuries; and new text end
4.20 new text begin (2) determines that the project reasonably addresses the traffic safety priority identified new text end
4.21 new text begin under clause (1). new text end
4.22 new text begin (c) If the commissioner exempts a project under the conditions specified in paragraph new text end
4.23 new text begin (b), the reasons for the exemption must be submitted for review by the chairs and ranking new text end
4.24 new text begin minority members of the legislative committees with jurisdiction over transportation within new text end
4.25 new text begin 90 days of the commissioner's exemption. new text end
4.26 new text begin EFFECTIVE DATE. This section is effective July 1, 2025, and applies to projects new text end
4.27 new text begin assessed on or after that date. new text end

Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.