SF2583

Department of Transportation publishing of certain notices and information for road easement projects requirement
Legislative Session 94 (2025-2026)

Related bill: HF2405

Bill text

Introduction

ReadChanges
PDF
(underlined = new law, struck through = current law the bill removes)
1.1A bill for an act
1.2relating to transportation; requiring Department of Transportation to publish certain
1.3notices and information for road easement projects; proposing coding for new law
1.4in Minnesota Statutes, chapter 160.
1.5BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.6Section 1. new text begin [160.086] ROAD EASEMENT INFORMATION REQUIRED. new text end
1.7 new text begin Subdivision 1. Definitions. (a) For purposes of this section, the following terms have new text end
1.8 new text begin the meanings given. new text end
1.9 new text begin (b) "Easement" means the acquisition or designation of private or public land for the new text end
1.10 new text begin purpose of constructing, maintaining, or improving public roads or related infrastructure. new text end
1.11 new text begin (c) "Minimum standards" means the minimum design standards specified for rural and new text end
1.12 new text begin suburban undivided roadways specified in Minnesota Rules, parts 8820.9920 and 8820.9926. new text end
1.13 new text begin (d) "Public report" means a publicly available written report outlining the justification new text end
1.14 new text begin and details for an easement. new text end
1.15 new text begin (e) "Road authority" means the commissioner for roads and highways under state new text end
1.16 new text begin jurisdiction and a county for roads and highways under a county's jurisdiction. new text end
1.17 new text begin Subd. 2. Justification required for certain projects. Before a relevant road authority new text end
1.18 new text begin proceeds with acquiring an easement for a road construction, reconstruction, or reconditioning new text end
1.19 new text begin project for a rural or suburban undivided roadway, the road authority must determine whether new text end
1.20 new text begin the project meets the commissioner's minimum standards. If the easement is used for the new text end
1.21 new text begin construction, reconstruction, or reconditioning of a roadway at a greater road width than new text end
1.22 new text begin specified in the minimum standards, the relevant road authority may only acquire the land new text end
2.1 new text begin for drainage or road safety reasons. Before acquiring the easement and proceeding with the new text end
2.2 new text begin road construction, reconstruction, or reconditioning project, the road authority must: new text end
2.3 new text begin (1) publish a public report that meets the requirements of subdivision 3; and new text end
2.4 new text begin (2) provide justification for the easement at a public or county board hearing detailing new text end
2.5 new text begin where the easement is proposed to be acquired. new text end
2.6 new text begin Subd. 3. Public report requirements; format and accessibility; public comment. (a) new text end
2.7 new text begin The road authority's public report must include the following information: new text end
2.8 new text begin (1) a clear description of the proposed easement, project scope, location, dimensions, new text end
2.9 new text begin and purpose; and new text end
2.10 new text begin (2) a detailed description of the necessity of the proposed easement, including: new text end
2.11 new text begin (i) safety concerns, including but not limited to the mitigation of traffic hazards, visibility new text end
2.12 new text begin issues, or any other motivation for the easement; new text end
2.13 new text begin (ii) drainage concerns, such as alleviating flooding, improving water runoff or quality, new text end
2.14 new text begin or ensuring compliance with environmental standards; or new text end
2.15 new text begin (iii) a statement explicitly declaring that no safety or drainage reasons exist for the new text end
2.16 new text begin easement. new text end
2.17 new text begin (b) The road authority must prepare the public report free of excessive technical jargon, new text end
2.18 new text begin format the report for ease of public understanding, and publish the report on the road new text end
2.19 new text begin authority's website and project website where applicable. The public must be provided an new text end
2.20 new text begin opportunity to submit written comments on the proposed easement. A minimum of 30 days new text end
2.21 new text begin must be provided for public review and comment on the public report before any action is new text end
2.22 new text begin taken on the proposed easement. new text end
2.23 new text begin EFFECTIVE DATE. This section is effective August 1, 2025, and applies to road new text end
2.24 new text begin construction projects on or after that date. new text end

Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.