SF2393
Omnibus, Energy, Utilities, Environment and Climate policy and appropriations
Legislative Session 94 (2025-2026)
Related bill: HF2442
Bill text
(underlined = new law, struck through = current law the bill removes)
Versions
Showing the most recent of the bill's 2 versions. Log in to read earlier versions and see what changed between them.
1.1A bill for an act
1.2relating to energy; establishing a budget for energy, transmission, petroleum, and
1.3renewable energy purposes; adding and modifying provisions governing geothermal
1.4energy, solar energy, and other energy policy; authorizing natural gas utilities to
1.5sell extraordinary event bonds under certain circumstances; sunsetting the renewable
1.6development account; establishing an account; appropriating money; amending
1.7Minnesota Statutes 2024, sections 116C.7792; 116D.04, subdivision 4a; 116J.55,
1.8subdivision 5; 216B.02, by adding subdivisions; 216B.16, subdivisions 14, 15, by
1.9adding a subdivision; 216B.164, subdivisions 2a, 3, 4a; 216B.1641, by adding a
1.10subdivision; 216B.1645, subdivision 1; 216B.1691, subdivisions 1, 2g; 216B.2402,
1.11subdivision 16; 216B.2421, subdivision 2; 216B.243, subdivision 8; 216B.62,
1.12subdivision 3, by adding a subdivision; 216C.09; 216C.10; 216C.11; 216C.12;
1.13216C.377, subdivision 3; 216C.391, subdivisions 1, 3; 216C.417, subdivision 2,
1.14by adding a subdivision; 216C.47, subdivision 1; 216I.02, by adding a subdivision;
1.15216I.07, subdivisions 2, 3; proposing coding for new law in Minnesota Statutes,
1.16chapter 216B; repealing Minnesota Statutes 2024, sections 116C.779, subdivisions
1.171, 2; 116C.7791; 216C.41.
1.18BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.19ARTICLE 1
1.20CLIMATE AND ENERGY FINANCE
1.21Section 1. new text begin APPROPRIATIONS. new text end
1.22 new text begin The sums shown in the columns marked "Appropriations" are appropriated to the agencies new text end
1.23 new text begin and for the purposes specified in this article. The appropriations are from the general fund, new text end
1.24 new text begin or another named fund, and are available for the fiscal years indicated for each purpose. new text end
1.25 new text begin The figures "2026" and "2027" used in this article mean that the appropriations listed under new text end
1.26 new text begin them are available for the fiscal year ending June 30, 2026, or June 30, 2027, respectively. new text end
1.27 new text begin "The first year" is fiscal year 2026. "The second year" is fiscal year 2027. "The biennium" new text end
1.28 new text begin is fiscal years 2026 and 2027. If an appropriation in this article is enacted more than once new text end
2.1 new text begin in the 2025 regular or a special legislative session, the appropriation must be given effect new text end
2.2 new text begin only once. new text end
2.3 new text begin APPROPRIATIONS new text end
2.4 new text begin Available for the Year new text end
2.5 new text begin Ending June 30 new text end
2.6 new text begin 2026 2027 new text end
2.7Sec. 2. new text begin DEPARTMENT OF COMMERCE new text end
2.8 new text begin Subdivision 1. Total Appropriation $ 12,644,000 $ 12,644,000 new text end
2.9 new text begin Appropriations by Fund new text end
2.10 new text begin 2026 2027 new text end
2.11 new text begin General 11,047,000 11,047,000 new text end
2.12 new text begin Petroleum Tank 1,597,000 1,597,000 new text end
2.13 new text begin The amounts that may be spent for each new text end
2.14 new text begin purpose are specified in the following new text end
2.15 new text begin subdivisions. new text end
2.16 new text begin Subd. 2. Energy Resources 11,047,000 11,047,000 new text end
2.17 new text begin (a) $150,000 the first year and $150,000 the new text end
2.18 new text begin second year are to remediate vermiculite new text end
2.19 new text begin insulation from households that are eligible new text end
2.20 new text begin for weatherization assistance under new text end
2.21 new text begin Minnesota's weatherization assistance program new text end
2.22 new text begin state plan under Minnesota Statutes, section new text end
2.23 new text begin 216C.264. Remediation must be performed in new text end
2.24 new text begin conjunction with federal weatherization new text end
2.25 new text begin assistance program services. new text end
2.26 new text begin (b) $189,000 each year is for activities new text end
2.27 new text begin associated with a utility's implementation of new text end
2.28 new text begin a natural gas innovation plan under Minnesota new text end
2.29 new text begin Statutes, section 216B.2427. new text end
2.30 new text begin (c) $500,000 each year is for a grant to the new text end
2.31 new text begin clean energy resource teams under Minnesota new text end
2.32 new text begin Statutes, section 216C.385, subdivision 2, to new text end
2.33 new text begin provide additional capacity to perform the new text end
2.34 new text begin duties specified under Minnesota Statutes, new text end
2.35 new text begin section 216C.385, subdivision 3. This new text end
3.1 new text begin appropriation may be used to reimburse the new text end
3.2 new text begin reasonable costs incurred by the Department new text end
3.3 new text begin of Commerce to administer the grant. new text end
3.4 new text begin (d) $301,000 each year is to implement energy new text end
3.5 new text begin benchmarking under Minnesota Statutes, new text end
3.6 new text begin section 216C.331. new text end
3.7 new text begin (e) $164,000 each year is for activities new text end
3.8 new text begin associated with a public utility's transportation new text end
3.9 new text begin electrification plan filing under Minnesota new text end
3.10 new text begin Statutes, section 216B.1615. new text end
3.11 new text begin (f) $77,000 each year is for activities new text end
3.12 new text begin associated with appeals of consumer new text end
3.13 new text begin complaints to the commission under new text end
3.14 new text begin Minnesota Statutes, section 216B.172. new text end
3.15 new text begin (g) $961,000 each year is for activities new text end
3.16 new text begin required under Minnesota Statutes, section new text end
3.17 new text begin 216B.1641, for community solar gardens. This new text end
3.18 new text begin appropriation must be assessed directly to the new text end
3.19 new text begin public utility subject to Minnesota Statutes, new text end
3.20 new text begin section 116C.779. new text end
3.21 new text begin (h) $46,000 each year is for work to align new text end
3.22 new text begin energy transmission and distribution planning new text end
3.23 new text begin activities with opportunities along trunk new text end
3.24 new text begin highway rights-of-way. new text end
3.25 new text begin (i) $265,000 each year is to (1) participate in new text end
3.26 new text begin a Public Utilities Commission proceeding to new text end
3.27 new text begin review electric transmission line owners' plans new text end
3.28 new text begin to deploy grid-enhancing technologies, and new text end
3.29 new text begin (2) issue an order to implement the plans. The new text end
3.30 new text begin base in fiscal year 2028 is $0. new text end
3.31 new text begin The general fund base is $10,782,000 in fiscal new text end
3.32 new text begin year 2028 and $10,782,000 in fiscal year 2029. new text end
4.1 new text begin Subd. 3. Petroleum Tank Release Compensation new text end
4.2 new text begin Board 1,597,000 1,597,000 new text end
4.3 new text begin This appropriation is from the petroleum tank new text end
4.4 new text begin fund. new text end
4.5Sec. 3. new text begin PUBLIC UTILITIES COMMISSION $ 13,330,000 $ 13,417,000 new text end
4.6 new text begin The general fund base is $13,183,000 in fiscal new text end
4.7 new text begin year 2028 and later. new text end
4.8Sec. 4. new text begin TRANSFERS. new text end
4.9 new text begin $1,199,000 in fiscal year 2026 and $1,199,000 in fiscal year 2027 are transferred from new text end
4.10 new text begin the general fund to the preweatherization account in the special revenue fund under Minnesota new text end
4.11 new text begin Statutes, section 216C.264, subdivision 1c. For fiscal years 2028 through 2031, the new text end
4.12 new text begin commissioner of management and budget must include a transfer of $1,199,000 each year new text end
4.13 new text begin from the general fund to the preweatherization account in the special revenue fund when new text end
4.14 new text begin preparing each forecast from the effective date of this section through the February 2027 new text end
4.15 new text begin forecast, under Minnesota Statutes, section 16A.103. new text end
4.16Sec. 5. new text begin APPROPRIATION EXTENSION. new text end
4.17 new text begin The availability of the appropriation for the Tribal Advocacy Council on Energy in Laws new text end
4.18 new text begin 2023, chapter 60, article 10, section 2, subdivision 2, paragraph (i), is extended to June 30, new text end
4.19 new text begin 2026. new text end
4.20 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
4.21ARTICLE 2
4.22RENEWABLE DEVELOPMENT ACCOUNT APPROPRIATIONS
4.23Section 1. new text begin RENEWABLE DEVELOPMENT FINANCE. new text end
4.24 new text begin The sums shown in the columns marked "Appropriations" are appropriated to the agencies new text end
4.25 new text begin and for the purposes specified in this article. Notwithstanding Minnesota Statutes, section new text end
4.26 new text begin 116C.779, subdivision 1, paragraph (j), the appropriations are from the renewable new text end
4.27 new text begin development account in the special revenue fund established in Minnesota Statutes, section new text end
4.28 new text begin 116C.779, subdivision 1, and are available for the fiscal years indicated for each purpose. new text end
4.29 new text begin The figures "2026" and "2027" used in this article mean that the appropriations listed under new text end
4.30 new text begin them are available for the fiscal year ending June 30, 2026, or June 30, 2027, respectively. new text end
4.31 new text begin "The first year" is fiscal year 2026. "The second year" is fiscal year 2027. "The biennium" new text end
4.32 new text begin is fiscal years 2026 and 2027. If an appropriation in this article is enacted more than once new text end
5.1 new text begin in the 2025 regular or special legislative session, the appropriation must be given effect new text end
5.2 new text begin only once. new text end
5.3 new text begin APPROPRIATIONS new text end
5.4 new text begin Available for the Year new text end
5.5 new text begin Ending June 30 new text end
5.6 new text begin 2026 2027 new text end
5.7Sec. 2. new text begin DEPARTMENT OF COMMERCE new text end
5.8 new text begin Subdivision 1. Total Appropriation $ 10,500,000 $ 100,000 new text end
5.9 new text begin The amounts that may be spent for each new text end
5.10 new text begin purpose are specified in the following new text end
5.11 new text begin subdivisions. new text end
5.12 new text begin Subd. 2. "Made in Minnesota" Administration new text end
5.13 new text begin $100,000 each year is to administer the "Made new text end
5.14 new text begin in Minnesota" solar energy production new text end
5.15 new text begin incentive program under Minnesota Statutes, new text end
5.16 new text begin section 216C.417. Any unobligated amount new text end
5.17 new text begin remaining on June 30, 2027, cancels to the new text end
5.18 new text begin renewable development account. new text end
5.19 new text begin Subd. 3. Microgrid Research and Application new text end
5.20 new text begin $1,200,000 the first year is for a grant to the new text end
5.21 new text begin University of St. Thomas Center for Microgrid new text end
5.22 new text begin Research, which must be used to: new text end
5.23 new text begin (1) increase the center's capacity to provide new text end
5.24 new text begin industry partners opportunities to test new text end
5.25 new text begin near-commercial microgrid products on a new text end
5.26 new text begin real-world scale and to multiply opportunities new text end
5.27 new text begin for innovative research; new text end
5.28 new text begin (2) procure advanced equipment and controls new text end
5.29 new text begin to enable the extension of the university's new text end
5.30 new text begin microgrid to additional buildings; and new text end
5.31 new text begin (3) expand (i) hands-on educational new text end
5.32 new text begin opportunities for undergraduate and graduate new text end
5.33 new text begin electrical engineering students to increase new text end
6.1 new text begin understanding of microgrid operations, and new text end
6.2 new text begin (ii) partnerships with community colleges. new text end
6.3 new text begin This is a onetime appropriation and is new text end
6.4 new text begin available until June 30, 2028. new text end
6.5 new text begin Subd. 4. Green Hydrogen Project new text end
6.6 new text begin $2,000,000 the first year is for a grant to the new text end
6.7 new text begin city of St. Cloud for the Green Hydrogen new text end
6.8 new text begin Project to incorporate a battery and renewable new text end
6.9 new text begin energy system. This is a onetime appropriation new text end
6.10 new text begin and is available until June 30, 2028. new text end
6.11 new text begin Subd. 5. Anaerobic Digester Energy System new text end
6.12 new text begin $4,000,000 the first year is for a grant to new text end
6.13 new text begin Ramsey/Washington Recycling and Energy, new text end
6.14 new text begin in partnership with Dem-Con HZI Bioenergy, new text end
6.15 new text begin LLC, to construct an anaerobic digester energy new text end
6.16 new text begin system in Louisville Township. For the new text end
6.17 new text begin purposes of this subdivision, "anaerobic new text end
6.18 new text begin digester energy system" means a facility that new text end
6.19 new text begin uses diverted food and organic waste to create new text end
6.20 new text begin renewable natural gas and biochar. This is a new text end
6.21 new text begin onetime appropriation and is available until new text end
6.22 new text begin June 30, 2028. new text end
6.23 new text begin Subd. 6. Como Zoo Geothermal Energy System new text end
6.24 new text begin $2,200,000 the first year is for a grant to Como new text end
6.25 new text begin Zoo in the city of St. Paul to construct a new text end
6.26 new text begin geothermal energy system that provides space new text end
6.27 new text begin heating and cooling to the large cats building. new text end
6.28 new text begin For the purposes of this subdivision, new text end
6.29 new text begin "geothermal energy system" means a system new text end
6.30 new text begin composed of a heat pump that moves a new text end
6.31 new text begin heat-transferring fluid through piping new text end
6.32 new text begin embedded in the earth and absorbs the earth's new text end
6.33 new text begin constant temperature, a heat exchanger, and new text end
6.34 new text begin ductwork to distribute heated and cooled air new text end
7.1 new text begin to a building. This is a onetime appropriation new text end
7.2 new text begin and is available until June 30, 2028. new text end
7.3 new text begin Subd. 7. Minnesota Energy Alley new text end
7.4 new text begin (a) $1,000,000 the first year for a grant to new text end
7.5 new text begin Clean Energy Economy Minnesota for the new text end
7.6 new text begin Minnesota Energy Alley initiative. The new text end
7.7 new text begin initiative is designed to promote energy new text end
7.8 new text begin innovation through supporting energy new text end
7.9 new text begin entrepreneurs and emerging businesses to new text end
7.10 new text begin commercialize energy solutions by matching new text end
7.11 new text begin promising innovators with established and new text end
7.12 new text begin trustworthy Minnesota-based public and new text end
7.13 new text begin private partners to demonstrate emerging new text end
7.14 new text begin technologies in real-world applications. The new text end
7.15 new text begin grant may be used to provide seed funding for new text end
7.16 new text begin businesses, develop a training and new text end
7.17 new text begin development program, support recruitment of new text end
7.18 new text begin entrepreneurs to Minnesota, and secure new text end
7.19 new text begin funding from federal programs and corporate new text end
7.20 new text begin partners to establish a self-sustaining, new text end
7.21 new text begin long-term revenue model. This is a onetime new text end
7.22 new text begin appropriation and is available until June 30, new text end
7.23 new text begin 2027. new text end
7.24 new text begin (b) By January 15, 2027, the commissioner of new text end
7.25 new text begin commerce must submit a written report to the new text end
7.26 new text begin chairs and ranking minority members of the new text end
7.27 new text begin house of representatives and senate new text end
7.28 new text begin committees with jurisdiction over energy new text end
7.29 new text begin finance and policy on the activities and new text end
7.30 new text begin accomplishments of the Minnesota Energy new text end
7.31 new text begin Alley initiative during the previous fiscal year new text end
7.32 new text begin and the disposition of this appropriation, new text end
7.33 new text begin including a separate statement of the amount new text end
7.34 new text begin of administrative costs. new text end
8.1 new text begin Subd. 8. Grant Administration new text end
8.2 new text begin Notwithstanding Minnesota Statutes, section new text end
8.3 new text begin 16B.98, subdivision 14, the commissioner may new text end
8.4 new text begin use up to $100,000 of the amount in this new text end
8.5 new text begin section for the administrative costs of the new text end
8.6 new text begin grants in this section. new text end
8.7Sec. 3. new text begin DEPARTMENT OF new text end
8.8 new text begin ADMINISTRATION $ 92,000 $ 92,000 new text end
8.9 new text begin $92,000 each year is for software and new text end
8.10 new text begin administrative costs associated with the state new text end
8.11 new text begin building energy conservation improvement new text end
8.12 new text begin revolving loan program under Minnesota new text end
8.13 new text begin Statutes, section 16B.87. new text end
8.14Sec. 4. new text begin UNIVERSITY OF MINNESOTA $ 5,000,000 $ -0- new text end
8.15 new text begin $5,000,000 the first year is for research, new text end
8.16 new text begin development, outreach, and demonstration of new text end
8.17 new text begin energy systems that use hydrogen and new text end
8.18 new text begin ammonia production from renewable energy new text end
8.19 new text begin resources and other sources of clean energy new text end
8.20 new text begin as a means of storing and generating new text end
8.21 new text begin electricity. This is a onetime appropriation and new text end
8.22 new text begin is available until June 30, 2028. new text end
8.23Sec. 5. new text begin POLLUTION CONTROL AGENCY $ 3,000,000 $ -0- new text end
8.24 new text begin $3,000,000 the first year is for a grant to the new text end
8.25 new text begin owner of a biomass energy generation plant new text end
8.26 new text begin in Shakopee that uses waste heat from the new text end
8.27 new text begin generation of electricity in the malting process new text end
8.28 new text begin to purchase equipment to facilitate the disposal new text end
8.29 new text begin of wood that is infested by emerald ash borer. new text end
8.30 new text begin This is a onetime appropriation and is new text end
8.31 new text begin available until June 30, 2028. Notwithstanding new text end
8.32 new text begin Minnesota Statutes, section 16B.98, new text end
8.33 new text begin subdivision 14, the commissioner of the new text end
8.34 new text begin Pollution Control Agency may use up to new text end
9.1 new text begin $25,000 of the amount in this section for the new text end
9.2 new text begin administrative costs of this grant. new text end
9.3Sec. 6. new text begin TRANSFER. new text end
9.4 new text begin $2,000,000 in fiscal year 2026 is transferred from the renewable development account new text end
9.5 new text begin in the special revenue fund to the geothermal planning grant account under Minnesota new text end
9.6 new text begin Statutes, section 216C.47, subdivision 3. new text end
9.7Sec. 7. new text begin APPROPRIATION EXTENSION. new text end
9.8 new text begin Notwithstanding Minnesota Statutes, section 16A.28, and Laws 2023, chapter 60, article new text end
9.9 new text begin 11, section 2, subdivision 3, paragraph (c), the availability of the fiscal year 2024 and fiscal new text end
9.10 new text begin year 2025 appropriations for grants to the University of St. Thomas Center for Microgrid new text end
9.11 new text begin Research in Laws 2023, chapter 60, article 11, section 2, subdivision 3, are extended to June new text end
9.12 new text begin 30, 2028. new text end
9.13 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
9.14ARTICLE 3
9.15ENERGY POLICY
9.16Section 1. Minnesota Statutes 2024, section 116D.04, subdivision 4a, is amended to read:
9.17Subd. 4a. Alternative review. new text begin (a) new text end The board shall by rule identify alternative forms of
9.18environmental review which will address the same issues and utilize similar procedures as
9.19an environmental impact statement in a more timely or more efficient manner to be utilized
9.20in lieu of an environmental impact statement.
9.21 new text begin (b) Upon adoption by the responsible governmental unit of the environmental document new text end
9.22 new text begin and plan for mitigation under an alternative urban areawide review process, and new text end
9.23 new text begin notwithstanding any additional environmental review that may otherwise be required for a new text end
9.24 new text begin phased action or connected action, or project component that was not evaluated in the new text end
9.25 new text begin alternative urban areawide review process, environmental review is complete and the new text end
9.26 new text begin prerequisites under subdivision 2b are satisfied with regards to the anticipated residential, new text end
9.27 new text begin commercial, warehousing, and light industrial development projects that are consistent with new text end
9.28 new text begin development assumptions within the established boundaries of the geographic area to which new text end
9.29 new text begin the alternative urban areawide review applies. new text end
9.30 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
10.1Sec. 2. Minnesota Statutes 2024, section 216B.02, is amended by adding a subdivision to
10.2read:
10.3 new text begin Subd. 11. Emergency backup generator. "Emergency backup generator" means a new text end
10.4 new text begin stationary compressed ignition or spark ignition engine described under Code of Federal new text end
10.5 new text begin Regulations, title 40, parts 60.4211(f) and 60.4243(d), respectively, that is installed with new text end
10.6 new text begin equipment that prevents the flow of electricity to the electric grid. new text end
10.7 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
10.8Sec. 3. Minnesota Statutes 2024, section 216B.02, is amended by adding a subdivision to
10.9read:
10.10 new text begin Subd. 12. Data center. "Data center" means a freestanding structure that primarily new text end
10.11 new text begin contains electronic equipment used to process, store, and transmit digital information. new text end
10.12Sec. 4. Minnesota Statutes 2024, section 216B.16, is amended by adding a subdivision to
10.13read:
10.14 new text begin Subd. 1b. Definitions. For the purposes of this section, "low-income" means a household: new text end
10.15 new text begin (1) who is approved as qualified for energy assistance from the low-income home energy new text end
10.16 new text begin assistance program; new text end
10.17 new text begin (2) whose household income is 50 percent or less of the state median income; or new text end
10.18 new text begin (3) who meets another qualification established by the commission. new text end
10.19Sec. 5. Minnesota Statutes 2024, section 216B.16, subdivision 14, is amended to read:
10.20Subd. 14. Low-income electric rate discount. A public utility shall fund an affordability
10.21program for low-income customers at a base annual funding level of $8,000,000. The annual
10.22funding level shall increase in the calendar years subsequent to each commission approval
10.23of a rate increase for the public utility's residential customers by the same percentage as the
10.24approved residential rate increase. Costs for the program shall be included in the utility's
10.25base rate. deleted text begin For the purposes of this subdivision, "low-income" describes a customer who is deleted text end
10.26 deleted text begin receiving assistance from the federal low-income home energy assistance program. deleted text end The
10.27affordability program must be designed to target participating customers with the lowest
10.28incomes and highest energy costs in order to lower the percentage of income they devote
10.29to energy bills, increase their payments, lower utility service disconnections, and decrease
10.30costs associated with collection activities on their accounts. For low-income customers who
10.31are 62 years of age or older or disabled, the program must include a $15 discount in each
11.1billing period. For the purposes of this subdivision, "public utility" includes only those
11.2public utilities with more than 200,000 residential electric service customers. The commission
11.3may issue orders necessary to implement, administer, and recover the costs of the program
11.4on a timely basis.
11.5Sec. 6. Minnesota Statutes 2024, section 216B.16, subdivision 15, is amended to read:
11.6Subd. 15. Low-income affordability programs. (a) The commission must consider
11.7ability to pay as a factor in setting utility rates and may establish affordability programs for
11.8low-income residential ratepayers in order to ensure affordable, reliable, and continuous
11.9service to low-income utility customers. A public utility serving low-income residential
11.10ratepayers who use natural gas for heating must file an affordability program with the
11.11commission. deleted text begin For purposes of this subdivision, "low-income residential ratepayers" means deleted text end
11.12 deleted text begin ratepayers who receive energy assistance from the low-income home energy assistance deleted text end
11.13 deleted text begin program (LIHEAP). deleted text end
11.14(b) Any affordability program the commission orders a utility to implement must:
11.15(1) lower the percentage of income that participating low-income households devote to
11.16energy bills;
11.17(2) increase participating customer payments over time by increasing the frequency of
11.18payments;
11.19(3) decrease or eliminate participating customer arrears;
11.20(4) lower the utility costs associated with customer account collection activities; and
11.21(5) coordinate the program with other available low-income bill payment assistance and
11.22conservation resources.
11.23(c) In ordering affordability programs, the commission may require public utilities to
11.24file program evaluations that measure the effect of the affordability program on:
11.25(1) the percentage of income that participating households devote to energy bills;
11.26(2) service disconnections; and
11.27(3) frequency of customer payments, utility collection costs, arrearages, and bad debt.
11.28(d) The commission must issue orders necessary to implement, administer, and evaluate
11.29affordability programs, and to allow a utility to recover program costs, including
11.30administrative costs, on a timely basis. The commission may not allow a utility to recover
11.31administrative costs, excluding start-up costs, in excess of five percent of total program
12.1costs, or program evaluation costs in excess of two percent of total program costs. The
12.2commission must permit deferred accounting, with carrying costs, for recovery of program
12.3costs incurred during the period between general rate cases.
12.4(e) Public utilities may use information collected or created for the purpose of
12.5administering energy assistance to administer affordability programs.
12.6Sec. 7. Minnesota Statutes 2024, section 216B.164, subdivision 2a, is amended to read:
12.7Subd. 2a. Definitions. (a) For the purposes of this section, the following terms have the
12.8meanings given them.
12.9(b) "Aggregated meter" means a meter located on the premises of a customer's owned
12.10or leased property that is contiguous with property containing the customer's designated
12.11meter.
12.12(c) "Capacity" means the number of megawatts alternating current deleted text begin (AC) at the point of deleted text end
12.13 deleted text begin interconnection between a distributed generation facility and a utility's electric system deleted text end new text begin that new text end
12.14 new text begin a qualifying facility is capable of producing new text end .
12.15(d) "Cogeneration" means a combined process whereby electrical and useful thermal
12.16energy are produced simultaneously.
12.17(e) "Contiguous property" means property owned or leased by the customer sharing a
12.18common border, without regard to interruptions in contiguity caused by easements, public
12.19thoroughfares, transportation rights-of-way, or utility rights-of-way.
12.20(f) "Customer" means the person who is named on the utility electric bill for the premises.
12.21(g) "Designated meter" means a meter that is physically attached to the customer's facility
12.22that the customer-generator designates as the first meter to which net metered credits are
12.23to be applied as the primary meter for billing purposes when the customer is serviced by
12.24more than one meter.
12.25(h) "Distributed generation" means a facility that:
12.26(1) has a capacity of ten megawatts or less;
12.27(2) is interconnected with a utility's distribution system, over which the commission has
12.28jurisdiction; and
12.29(3) generates electricity from natural gas, renewable fuel, or a similarly clean fuel, and
12.30may include waste heat, cogeneration, or fuel cell technology.
13.1(i) "High-efficiency distributed generation" means a distributed energy facility that has
13.2a minimum efficiency of 40 percent, as calculated under section 272.0211, subdivision 1.
13.3(j) "Net metered facility" means an electric generation facility constructed for the purpose
13.4of offsetting energy use through the use of renewable energy or high-efficiency distributed
13.5generation sources.
13.6(k) "Renewable energy" has the meaning given in section 216B.2411, subdivision 2.
13.7(l) "Standby charge" means a charge imposed by an electric utility upon a distributed
13.8generation facility for the recovery of costs for the provision of standby services, as provided
13.9for in a utility's tariffs approved by the commission, necessary to make electricity service
13.10available to the distributed generation facility.
13.11Sec. 8. Minnesota Statutes 2024, section 216B.164, subdivision 3, is amended to read:
13.12Subd. 3. Purchases; small facilities. (a) This paragraph applies to cooperative electric
13.13associations and municipal utilities. For a qualifying facility having less than 40-kilowatt
13.14capacity, the customer shall be billed for the net energy supplied by the utility according to
13.15the applicable rate schedule for sales to that class of customer. A cooperative electric
13.16association or municipal utility may charge an additional fee to recover the fixed costs not
13.17already paid for by the customer through the customer's existing billing arrangement. Any
13.18additional charge by the utility must be reasonable and appropriate for that class of customer
13.19based on the most recent cost of service study. The cost of service study must be made
13.20available for review by a customer of the utility upon request. In the case of net input into
13.21the utility system by a qualifying facility having less than 40-kilowatt capacity, compensation
13.22to the customer shall be at a per kilowatt-hour rate determined under paragraph (c) deleted text begin , (d), deleted text end or
13.23(f).
13.24(b) This paragraph applies to public utilities. For a qualifying facility having less than
13.251,000-kilowatt capacity, the customer shall be billed for the net energy supplied by the
13.26utility according to the applicable rate schedule for sales to that class of customer. In the
13.27case of net input into the utility system by a qualifying facility having: (1) more than
13.2840-kilowatt but less than 1,000-kilowatt capacity, compensation to the customer shall be at
13.29a per kilowatt-hour rate determined under paragraph (c); or (2) less than 40-kilowatt capacity,
13.30compensation to the customer shall be at a per-kilowatt rate determined under paragraph
13.31(c) or (d).
13.32(c) In setting rates, the commission shall consider the fixed distribution costs to the
13.33utility not otherwise accounted for in the basic monthly charge and shall ensure that the
14.1costs charged to the qualifying facility are not discriminatory in relation to the costs charged
14.2to other customers of the utility. The commission shall set the rates for net input into the
14.3utility system based on avoided costs as defined in the Code of Federal Regulations, title
14.418, section 292.101, paragraph (b)(6), the factors listed in Code of Federal Regulations,
14.5title 18, section 292.304, and all other relevant factors.
14.6(d) Notwithstanding any provision in this chapter to the contrary, a qualifying facility
14.7 deleted text begin having deleted text end new text begin that is interconnected to a public utility and has new text end less than 40-kilowatt capacity may
14.8elect that the compensation for net input by the qualifying facility into the utility system
14.9 deleted text begin shall be deleted text end new text begin is new text end at the average retail utility energy rate. "Average retail utility energy rate" is
14.10defined as the average of the retail energy rates, exclusive of special rates based on income,
14.11age, or energy conservation, according to the applicable rate schedule of the utility for sales
14.12to that class of customer.
14.13(e) If the qualifying facility or net metered facility is interconnected with a nongenerating
14.14utility which has a sole source contract with a municipal power agency or a generation and
14.15transmission utility, the nongenerating utility may elect to treat its purchase of any net input
14.16under this subdivision as being made on behalf of its supplier and shall be reimbursed by
14.17its supplier for any additional costs incurred in making the purchase. Qualifying facilities
14.18or net metered facilities having less than 1,000-kilowatt capacity if interconnected to a
14.19public utility, or less than 40-kilowatt capacity if interconnected to a cooperative electric
14.20association or municipal utility may, at the customer's option, elect to be governed by the
14.21provisions of subdivision 4.
14.22(f) A customer with a qualifying facility or net metered facility having a capacity below
14.2340 kilowatts that is interconnected to a cooperative electric association or a municipal utility
14.24may elect to be compensated for the customer's net input into the utility system in the form
14.25of a kilowatt-hour credit on the customer's energy bill carried forward and applied to
14.26subsequent energy bills. Any kilowatt-hour credits carried forward by the customer cancel
14.27at the end of the calendar year deleted text begin with no additional compensation deleted text end . new text begin A customer must be new text end
14.28 new text begin compensated for a canceled credit at the per kilowatt-hour rate determined under paragraph new text end
14.29 new text begin (c). new text end
14.30 new text begin (g) This section applies only to qualifying facilities that have submitted interconnection new text end
14.31 new text begin applications after December 31, 2026. Qualifying facilities with interconnection applications new text end
14.32 new text begin submitted on or before that date are subject to Minnesota Statutes 2024, section 216B.164. new text end
14.33 new text begin EFFECTIVE DATE. This section is effective July 1, 2025. new text end
15.1Sec. 9. Minnesota Statutes 2024, section 216B.164, subdivision 4a, is amended to read:
15.2Subd. 4a. Aggregation of meters. (a) For the purpose of measuring electricity under
15.3subdivisions 3 and 3a, a public utility must aggregate for billing purposes a customer's
15.4designated meter with one or more aggregated meters if a customer requests that it do so.
15.5To qualify for aggregation under this subdivision, a meter must be owned by the customer
15.6requesting the aggregation, must be located on contiguous property owned by the customer
15.7requesting the aggregation, and the total of all aggregated meters must be subject to the size
15.8limitation in this section. new text begin A cooperative electric association or a municipal utility must new text end
15.9 new text begin aggregate for billing purposes one or more aggregated meters if a customer requests that it new text end
15.10 new text begin do so. new text end
15.11(b) A deleted text begin public deleted text end utility must comply with a request by a customer-generator to aggregate
15.12additional meters within 90 days. The specific meters must be identified at the time of the
15.13request. In the event that more than one meter is identified, the customer must designate
15.14the rank order for the aggregated meters to which the net metered credits are to be applied.
15.15At least 60 days prior to the beginning of the next annual billing period, a customer may
15.16amend the rank order of the aggregated meters, subject to this subdivision.
15.17(c) The aggregation of meters applies only to charges that use kilowatt-hours as the
15.18billing determinant. All other charges applicable to each meter account shall be billed to
15.19the customer.
15.20(d) A deleted text begin public deleted text end utility will first apply the kilowatt-hour credit to the charges for the
15.21designated meter and then to the charges for the aggregated meters in the rank order specified
15.22by the customer. If the deleted text begin net metered deleted text end facility supplies more electricity to the public utility
15.23than the energy usage recorded by the customer-generator's designated and aggregated
15.24meters during a monthly billing period, the public utility shall apply credits to the customer's
15.25next monthly bill for the excess kilowatt-hours.
15.26(e) With the commission's prior approval, a deleted text begin public deleted text end utility may charge the
15.27customer-generator requesting to aggregate meters a reasonable fee to cover the
15.28administrative costs incurred in implementing the costs of this subdivision, pursuant to a
15.29tariff approved by the commission for a deleted text begin public deleted text end utility.
15.30Sec. 10. Minnesota Statutes 2024, section 216B.1641, is amended by adding a subdivision
15.31to read:
15.32 new text begin Subd. 15. Sunset. This section expires July 31, 2028. new text end
16.1Sec. 11. Minnesota Statutes 2024, section 216B.1691, subdivision 1, is amended to read:
16.2Subdivision 1. Definitions. (a) For purposes of this section, the following terms have
16.3the deleted text begin meaning deleted text end new text begin meanings new text end given deleted text begin them deleted text end .
16.4(b) "Carbon-free" means a technology that generates electricity without emitting carbon
16.5dioxide. new text begin Carbon-free includes a technology that, as of the effective date of this act and new text end
16.6 new text begin thereafter, is used by a utility to generate electricity for retail sale in Minnesota by combusting new text end
16.7 new text begin wood chips derived from: new text end
16.8 new text begin (1) limbs, branches, and other by-products of timber harvesting operations conducted new text end
16.9 new text begin to obtain wood for nonenergy purposes; or new text end
16.10 new text begin (2) discarded wood products. new text end
16.11(c) Unless otherwise specified in law, "eligible energy technology" means an energy
16.12technology that generates electricity from the following renewable energy sources:
16.13(1) solar;
16.14(2) wind;
16.15(3) hydroelectric deleted text begin with a capacity of: (i) less than 100 megawatts; or (ii) 100 megawatts deleted text end
16.16 deleted text begin or more, provided that the facility is in operation as of February 8, 2023 deleted text end ;
16.17(4) hydrogen generated from the resources listed in this paragraph; or
16.18(5) biomass, which includes, without limitation, landfill gas; an anaerobic digester
16.19system; the predominantly organic components of wastewater effluent, sludge, or related
16.20by-products from publicly owned treatment works, but not including incineration of
16.21wastewater sludge to produce electricity; and, except as provided in subdivision 1a, an
16.22energy recovery facility used to capture the heat value of mixed municipal solid waste or
16.23refuse-derived fuel from mixed municipal solid waste as a primary fuel.
16.24(d) "Electric utility" means: (1) a public utility providing electric service; (2) a generation
16.25and transmission cooperative electric association; (3) a municipal power agency; (4) a power
16.26district; or (5) a cooperative electric association or municipal utility providing electric service
16.27that is not a member of an entity in clauses (2) to (4).
16.28(e) "Environmental justice area" means an area in Minnesota that, based on the most
16.29recent data published by the United States Census Bureau, meets one or more of the following
16.30criteria:
16.31(1) 40 percent or more of the area's total population is nonwhite;
17.1(2) 35 percent or more of households in the area have an income that is at or below 200
17.2percent of the federal poverty level;
17.3(3) 40 percent or more of the area's residents over the age of five have limited English
17.4proficiency; or
17.5(4) the area is located within Indian country, as defined in United State Code, title 18,
17.6section 1151.
17.7(f) "Total retail electric sales" means the kilowatt-hours of electricity sold in a year by
17.8an electric utility to retail customers of the electric utility or to a distribution utility for
17.9distribution to the retail customers of the distribution utility.
17.10 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
17.11Sec. 12. Minnesota Statutes 2024, section 216B.1691, subdivision 2g, is amended to read:
17.12Subd. 2g. Carbon-free standard. new text begin (a) new text end In addition to the requirements under subdivisions
17.132a and 2f, each electric utility must generate or procure sufficient electricity generated from
17.14a carbon-free energy technology to provide the electric utility's retail customers in Minnesota,
17.15or the retail customers of a distribution utility to which the electric utility provides wholesale
17.16electric service, so that the electric utility generates or procures an amount of electricity
17.17from carbon-free energy technologies that is equivalent to at least the following standard
17.18percentages of the electric utility's total retail electric sales to retail customers in Minnesota
17.19by the end of the year indicated:
17.20(1) 2030 80 percent for public utilities; 60 percent for
17.21other electric utilities
17.22(2) 2035 90 percent for all electric utilities
17.23(3) 2040 100 percent for all electric utilities.
17.24 new text begin (b) For purposes of this section, electricity generated from a carbon-free technology new text end
17.25 new text begin includes electricity generated by a peaking facility that uses only biodiesel fuel, as defined new text end
17.26 new text begin in section 239.77, subdivision 1, paragraph (b), for the first 400 hours each year in which new text end
17.27 new text begin the peaking facility uses only biodiesel fuel. new text end
17.28 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
17.29Sec. 13. Minnesota Statutes 2024, section 216B.2402, subdivision 16, is amended to read:
17.30Subd. 16. Low-income household. "Low-income household" means a household whose
17.31household income:
18.1(1) is 80 percent or less of the area median household income for the geographic area
18.2in which the low-income household is located, as calculated by deleted text begin the United States Department deleted text end
18.3 deleted text begin of Housing and Urban Development deleted text end new text begin a body of the state or federal government new text end ; or
18.4(2) meets the income eligibility standards, as determined by the commissioner, required
18.5for a household to receive financial assistance from a federal, state, municipal, or utility
18.6program administered or approved by the department.
18.7Sec. 14. Minnesota Statutes 2024, section 216B.2421, subdivision 2, is amended to read:
18.8Subd. 2. Large energy facility. "Large energy facility" means:
18.9(1) any electric power generating plant or combination of plants at a single site with a
18.10combined capacity of 50,000 kilowatts or more and transmission lines directly associated
18.11with the plant that are necessary to interconnect the plant to the transmission system;
18.12(2) any high-voltage transmission line with a capacity of 300 kilovolts or more and
18.13greater than one mile in length in Minnesota;
18.14(3) any high-voltage transmission line with a capacity of 100 kilovolts or more with
18.15more than ten miles of its length in Minnesota;
18.16(4) any pipeline greater than six inches in diameter and having more than 50 miles of
18.17its length in Minnesota used for the transportation of coal, crude petroleum or petroleum
18.18fuels or oil, or their derivatives;
18.19(5) any pipeline for transporting natural or synthetic gas at pressures in excess of 200
18.20pounds per square inch with more than 50 miles of its length in Minnesota;
18.21(6) any facility designed for or capable of storing on a single site more than deleted text begin 100,000 deleted text end
18.22 new text begin 1,000,000 new text end gallons of liquefied natural gas or synthetic gas;
18.23(7) any underground gas storage facility requiring a permit pursuant to section 103I.681;
18.24(8) any nuclear fuel processing or nuclear waste storage or disposal facility; and
18.25(9) any facility intended to convert any material into any other combustible fuel and
18.26having the capacity to process in excess of 75 tons of the material per hour.
18.27Sec. 15. Minnesota Statutes 2024, section 216B.243, subdivision 8, is amended to read:
18.28Subd. 8. Exemptions. (a) This section does not apply to:
18.29(1) cogeneration or small power production facilities as defined in the Federal Power
18.30Act, United States Code, title 16, section 796, paragraph (17), subparagraph (A), and
19.1paragraph (18), subparagraph (A), and having a combined capacity at a single site of less
19.2than 80,000 kilowatts; plants or facilities for the production of ethanol or fuel alcohol; or
19.3any case where the commission has determined after being advised by the attorney general
19.4that its application has been preempted by federal law;
19.5(2) a high-voltage transmission line proposed primarily to distribute electricity to serve
19.6the demand of a single customer at a single location, unless the applicant opts to request
19.7that the commission determine need under this section or section 216B.2425;
19.8(3) the upgrade to a higher voltage of an existing transmission line that serves the demand
19.9of a single customer that primarily uses existing rights-of-way, unless the applicant opts to
19.10request that the commission determine need under this section or section 216B.2425;
19.11(4) a high-voltage transmission line of one mile or less required to connect a new or
19.12upgraded substation to an existing, new, or upgraded high-voltage transmission line;
19.13(5) conversion of the fuel source of an existing electric generating plant to using natural
19.14gas;
19.15(6) the modification of an existing electric generating plant to increase efficiency, as
19.16long as the capacity of the plant is not increased more than ten percent or more than 100
19.17megawatts, whichever is greater;
19.18(7) a large wind energy conversion system, as defined in section 216I.02, subdivision
19.1912, or a solar energy generating system, as defined in section 216I.02, subdivision 18, for
19.20which a site permit application is submitted by an independent power producer under chapter
19.21216I;
19.22(8) a large wind energy conversion system, as defined in section 216I.02, subdivision
19.2312, or a solar energy generating system, as defined in section 216I.02, subdivision 18,
19.24engaging in a repowering project that:
19.25(i) will not result in the system exceeding the nameplate capacity under its most recent
19.26interconnection agreement; or
19.27(ii) will result in the system exceeding the nameplate capacity under its most recent
19.28interconnection agreement, provided that the Midcontinent Independent System Operator
19.29has provided a signed generator interconnection agreement that reflects the expected net
19.30power increase;
19.31(9) energy storage systems, as defined in section 216I.02, subdivision 6;
20.1(10) transmission lines that directly interconnect large wind energy conversion systems,
20.2solar energy generating systems, or energy storage systems to the transmission system; deleted text begin or deleted text end
20.3(11) relocation of an existing high voltage transmission line to new right-of-way, provided
20.4that any new structures that are installed are not designed for and capable of operation at
20.5higher voltage deleted text begin . deleted text end new text begin ; or new text end
20.6 new text begin (12) a combination of emergency backup generators at a single site with a combined new text end
20.7 new text begin capacity of 50,000 kilowatts or more that provides power to a data center and is eligible for new text end
20.8 new text begin permitting as a single stationary source under Minnesota Rules, part 7007.0200, 7007.0250, new text end
20.9 new text begin 7007.1100, or 7007.1110 to 7007.1141. new text end
20.10(b) For the purpose of this subdivision, "repowering project" means:
20.11(1) modifying a large wind energy conversion system or a solar energy generating system
20.12that is a large energy facility to increase its efficiency without increasing its nameplate
20.13capacity;
20.14(2) replacing turbines in a large wind energy conversion system without increasing the
20.15nameplate capacity of the system; or
20.16(3) increasing the nameplate capacity of a large wind energy conversion system.
20.17 new text begin EFFECTIVE DATE; APPLICATION. This section is effective the day following new text end
20.18 new text begin final enactment and applies to applications under Minnesota Statutes, section 216B.243, new text end
20.19 new text begin that are pending before or submitted to the Public Utilities Commission on or after that date. new text end
20.20Sec. 16. Minnesota Statutes 2024, section 216C.09, is amended to read:
20.21216C.09 COMMISSIONER DUTIES.
20.22(a) The commissioner shall:
20.23(1) manage the department as the central repository within the state government for the
20.24collection of data on energy;
20.25(2) prepare and adopt an emergency allocation plan specifying actions to be taken in the
20.26event of an impending serious shortage of energy, or a threat to public health, safety, or
20.27welfare;
20.28(3) undertake a continuing assessment of trends in the consumption of all forms of energy
20.29and analyze the social, economic, and environmental consequences of these trends;
20.30(4) carry out energy new text begin conservation and efficiency new text end measures as specified by the legislature
20.31and recommend to the governor and the legislature additional energy policies and new text begin energy new text end
21.1conservation deleted text begin measures deleted text end new text begin and efficiency programming new text end as required to meet the objectives of
21.2this chapter;
21.3(5) collect and analyze data relating to present and future demands and resources for all
21.4sources of energy;
21.5(6) evaluate policies governing the establishment of rates and prices for energy as related
21.6to energy conservation new text begin and energy efficiency new text end , and other goals and policies of this chapter,
21.7and make recommendations for changes in energy pricing policies and rate schedules;
21.8(7) study the impact and relationship of the state energy policies to international, national,
21.9and regional energy policies;
21.10(8) design and implement a state program for deleted text begin the deleted text end new text begin energy new text end conservation deleted text begin of energy deleted text end new text begin and new text end
21.11 new text begin efficiency new text end ; deleted text begin this deleted text end new text begin the new text end program deleted text begin shall deleted text end new text begin must new text end include but new text begin is new text end not deleted text begin be deleted text end limited to deleted text begin , deleted text end general commercial,
21.12industrial, deleted text begin and deleted text end residential, and transportation areas; deleted text begin such deleted text end new text begin the new text end program deleted text begin shall deleted text end new text begin must new text end also provide
21.13for the evaluation of energy systems as they relate to lighting, heating, refrigeration, air
21.14conditioning, building design and operation, and appliance manufacturing and operation;
21.15(9) inform and educate the public about the sources and uses of energy and the ways in
21.16which deleted text begin persons deleted text end new text begin Minnesotans new text end can new text begin transition to a clean energy future, new text end conserve energy new text begin , and new text end
21.17 new text begin save money new text end ;
21.18(10) dispense funds made available for the purpose of research studies and projects deleted text begin of deleted text end
21.19 deleted text begin professional and civic orientation deleted text end , which are related to either energy conservation, resource
21.20recovery, or the development of alternative energy technologies which conserve
21.21nonrenewable energy resources while creating minimum environmental impact;
21.22(11) charge other governmental departments and agencies involved in energy-related
21.23activities with specific information gathering goals and require that those goals be met;
21.24(12) design a comprehensive program for the development of deleted text begin indigenous deleted text end energy
21.25resources. The program shall include deleted text begin , deleted text end but not be limited to deleted text begin , deleted text end providing technical,
21.26informational, educational, and financial services and materials to persons, businesses,
21.27municipalities, and organizations involved in the development of new text begin primary and emerging new text end
21.28 new text begin energy sources, including but not limited to new text end solar, wind, hydropower, peat, fiber fuels,
21.29biomass, and other alternative energy resources. The program shall be evaluated by the
21.30alternative energy technical activity; and
21.31(13) dispense loans, grants, or other financial deleted text begin aid deleted text end new text begin resources new text end from money received from
21.32litigation or new text begin a new text end settlement deleted text begin of alleged violations of federal petroleum-pricing regulations deleted text end made
21.33available to the department for that purpose.
22.1(b) Further, the commissioner may participate fully in hearings before the Public Utilities
22.2Commission on matters pertaining to rate design, cost allocation, efficient resource utilization,
22.3utility conservation investments, small power production, cogeneration, and other rate issues.
22.4The commissioner shall support the policies stated in section 216C.05 and shall prepare
22.5and defend testimony proposed to encourage energy conservation improvements as defined
22.6in section 216B.241.
22.7Sec. 17. Minnesota Statutes 2024, section 216C.10, is amended to read:
22.8216C.10 COMMISSIONER POWERS.
22.9(a) The commissioner may:
22.10(1) adopt rules under chapter 14 as necessary to carry out the purposes of this chapter;
22.11(2) make all contracts under this chapter and do all things necessary to cooperate with
22.12the United States government, and to qualify for, accept, and disburse any grant intended
22.13to administer this chapter;
22.14(3) provide on-site technical assistance to units of local government in order to enhance
22.15local capabilities deleted text begin for dealing with energy problems deleted text end new text begin to provide energy-related financial new text end
22.16 new text begin resources, planning, outreach, and engagement new text end ;
22.17(4) administer for the state, energy programs under federal law, regulations, or guidelines,
22.18and coordinate the programs and activities with other state agencies, units of local
22.19government, and educational institutions;
22.20(5) develop a state energy investment plan with yearly energy conservation and alternative
22.21energy development goals, investment targets, and marketing strategies;
22.22(6) perform market analysis studies relating to conservation, alternative and renewable
22.23energy resources, and energy recovery;
22.24(7) assist with the preparation of proposals for innovative conservation, renewable,
22.25alternative, or energy recovery projects;
22.26(8) manage and disburse funds made available for the purpose of research studies or
22.27demonstration projects related to energy conservation or other activities deemed appropriate
22.28by the commissioner;
22.29(9) intervene in certificate of need proceedings before the Public Utilities Commission;
22.30(10) collect fees from recipients of loans, grants, or other financial aid from money
22.31received from litigation or settlement of alleged violations of federal petroleum-pricing
23.1regulations, which fees must be used to pay the department's costs in administering those
23.2financial aids; and
23.3(11) collect fees from proposers and operators of conservation and other energy-related
23.4programs that are reviewed, evaluated, or approved by the department, other than proposers
23.5that are political subdivisions or community or nonprofit organizations, to cover the
23.6department's cost in making the reviewal, evaluation, or approval and in developing additional
23.7programs for others to operate.
23.8(b) Notwithstanding any other law, the commissioner is designated the state agent to
23.9apply for, receive, and accept federal or other funds made available to the state for the
23.10purposes of this chapter.
23.11Sec. 18. Minnesota Statutes 2024, section 216C.11, is amended to read:
23.12216C.11 ENERGY CONSERVATION INFORMATION CENTER.
23.13 new text begin (a) new text end The commissioner deleted text begin shall deleted text end new text begin must new text end establish an Energy Information Center in the
23.14 deleted text begin department's offices in St. Paul deleted text end new text begin department new text end . The information center deleted text begin shall deleted text end new text begin must new text end maintain a
23.15 deleted text begin toll-free telephone information service and disseminate printed materials on energy deleted text end
23.16 deleted text begin conservation topics, including but not limited to, availability of loans and other public and deleted text end
23.17 deleted text begin private financing methods for energy conservation physical improvements, the techniques deleted text end
23.18 deleted text begin and materials used to conserve energy in buildings, including retrofitting or upgrading deleted text end
23.19 deleted text begin insulation and installing weatherstripping, the projected prices and availability of different deleted text end
23.20 deleted text begin sources of energy, and alternative sources of energy deleted text end new text begin physical, virtual, and mobile information new text end
23.21 new text begin service that collects, analyzes, and disseminates energy resources, data, technical assistance new text end
23.22 new text begin and expertise, financial assistance, connections, and information on a variety of energy new text end
23.23 new text begin topics relevant to Minnesota consumers, businesses, Tribal and local governments, and new text end
23.24 new text begin community organizations. The information center must be accessible and responsive to new text end
23.25 new text begin public inquiries and must conduct proactive outreach new text end .
23.26 deleted text begin The Energy Information Center shall serve as the official Minnesota Alcohol Fuels deleted text end
23.27 deleted text begin Information Center and shall disseminate information, printed, by the toll-free telephone deleted text end
23.28 deleted text begin information service, or otherwise on the applicability and technology of alcohol fuels. deleted text end
23.29 deleted text begin The information center shall include information on the potential hazards of energy deleted text end
23.30 deleted text begin conservation techniques and improvements in the printed materials disseminated. The deleted text end
23.31 deleted text begin commissioner shall not be liable for damages arising from the installation or operation of deleted text end
23.32 deleted text begin equipment or materials recommended by the information center. deleted text end
24.1 new text begin (b) new text end The information center deleted text begin shall deleted text end new text begin must new text end use the information collected under section
24.2216C.02, subdivision 1, to maintain a central source of information on new text begin energy new text end conservation new text begin , new text end
24.3 new text begin energy efficiency, new text end and other energy-related programs, including deleted text begin both deleted text end programs required by
24.4law or rule and programs developed and carried on voluntarily.
24.5Sec. 19. Minnesota Statutes 2024, section 216C.12, is amended to read:
24.6216C.12 ENERGY deleted text begin CONSERVATION PUBLICITY deleted text end new text begin LITERACY new text end .
24.7 new text begin (a) new text end The commissioner new text begin , new text end in consultation with other affected agencies or departments deleted text begin shall deleted text end new text begin , new text end
24.8 new text begin must new text end develop informational materials deleted text begin , pamphlets and radio and television messages deleted text end new text begin and new text end
24.9 new text begin messaging new text end on energy conservation and deleted text begin housing deleted text end new text begin energy efficiency new text end programs available in
24.10Minnesota deleted text begin , renewable energy resources, and energy supply and demand. The printed materials deleted text end
24.11 deleted text begin shall include information on available tax credits for residential energy conservation deleted text end
24.12 deleted text begin measures, residential retrofitting loan and grant programs, and data on the economics of deleted text end
24.13 deleted text begin energy conservation and renewable resource measures. Copies of printed materials shall be deleted text end
24.14 deleted text begin distributed to members of the appropriate standing committees of the legislature deleted text end . new text begin The new text end
24.15 new text begin commissioner must use modern and current outreach strategies and media to distribute the new text end
24.16 new text begin informational materials and messaging to the widest possible audience. new text end
24.17 new text begin (b) The informational materials must promote energy literacy for individuals and new text end
24.18 new text begin communities to help individuals and communities make informed decisions on topics ranging new text end
24.19 new text begin from smart energy use at home and consumer choices to national and international energy new text end
24.20 new text begin policy. The informational materials must include but are not limited to information on energy new text end
24.21 new text begin sources, energy generation, energy use, energy conservation strategies, the energy workforce new text end
24.22 new text begin sector, and state and federal energy-related programs administered by the department. new text end
24.23Sec. 20. Minnesota Statutes 2024, section 216C.391, subdivision 1, is amended to read:
24.24Subdivision 1. Definitions. (a) For the purposes of this section, the following terms have
24.25the meanings given.
24.26(b) "Competitive funds" means federal funds awarded to selected applicants based on
24.27the grantor's evaluation of the strength of an application measured against all other
24.28applications.
24.29(c) "Disadvantaged community" has the meaning given by the federal agency disbursing
24.30federal funds.
25.1(d) "Eligible entity" means an entity located in Minnesota that is eligible to receive
25.2federal funds, tax credits, loans, or an entity that has at least one Minnesota-based partner,
25.3as determined by the grantor of the federal funds, tax credits, or loans.
25.4(e) "Federal funds" means federal formula or competitive funds available for award to
25.5applicants for energy projects under the Infrastructure Investment and Jobs Act, Public Law
25.6117-58, or the Inflation Reduction Act of 2022, Public Law 117-169.
25.7(f) "Formula funds" means federal funds awarded to all eligible applicants on a
25.8noncompetitive basis.
25.9(g) "Loans" means federal loans from loan funds authorized or funded in the Inflation
25.10Reduction Act of 2022, Public Law 117-169.
25.11(h) "Match" means the amount of deleted text begin state deleted text end new text begin nonfederal new text end money a successful grantee in
25.12Minnesota is required to contribute to a project as a condition of receiving federal funds.
25.13(i) "Political subdivision" has the meaning given in section 331A.01, subdivision 3.
25.14(j) "Project" means the activities proposed to be undertaken by an eligible entity awarded
25.15federal funds and are located in Minnesota or will directly benefit Minnesotans.
25.16(k) "Tax credits" means federal tax credits authorized in the Inflation Reduction Act of
25.172022, Public Law 117-169.
25.18(l) "Tribal government" has the meaning given in section 116J.64, subdivision 4.
25.19Sec. 21. Minnesota Statutes 2024, section 216C.391, subdivision 3, is amended to read:
25.20Subd. 3. Grant awards; eligible entities; priorities. (a) Grants may be awarded under
25.21this section to eligible entities in accordance with the following order of priorities:
25.22(1) federal formula funds directed to the state that require a match;
25.23(2) federal funds directed to a political subdivision or a Tribal government that require
25.24a match;
25.25(3) federal funds directed to an institution of higher education, a consumer-owned utility,
25.26a business, or a nonprofit organization that require a match;
25.27(4) federal funds directed to investor-owned utilities that require a match;
25.28(5) federal funds directed to an eligible entity not included in clauses (1) to (4) that
25.29require a match; and
26.1(6) all other grant opportunities directed to eligible entities that do not require a match
26.2but for which the commissioner determines that a grant made under this section is likely to
26.3enhance the likelihood of an applicant receiving federal funds, or to increase the potential
26.4amount of federal funds received.
26.5(b) By November 15, 2023, the commissioner must develop and publicly post, and report
26.6to the chairs and ranking minority members of the legislative committees with jurisdiction
26.7over energy finance, the federal energy grant funds that are eligible for state matching funds
26.8under this section.
26.9 new text begin (c) Notwithstanding section 16B.98, subdivision 5, paragraph (b), a grant made under new text end
26.10 new text begin this section may exceed five years. new text end
26.11Sec. 22. Minnesota Statutes 2024, section 216C.47, subdivision 1, is amended to read:
26.12Subdivision 1. Definitions. (a) For the purposes of this section, the following terms have
26.13the meanings given.
26.14(b) "Eligible applicant" means a county, city, town, new text begin Tribal government, new text end or the
26.15Metropolitan Council.
26.16(c) "Geothermal energy system" means a system that heats and cools one or more
26.17buildings by using the constant temperature of the earth as both a heat source and heat sink,
26.18and a heat exchanger consisting of an underground closed loop system of piping containing
26.19a liquid to absorb and relinquish heat within the earth. Geothermal energy system includes:
26.20(1) a bored geothermal heat exchanger, as defined in section 103I.005;
26.21(2) a groundwater thermal exchange device, as defined in section 103I.005; and
26.22(3) a submerged closed loop heat exchanger, as defined in section 103I.005.
26.23 new text begin (d) "Tribal government" means the elected government of a federally recognized Indian new text end
26.24 new text begin Tribe located in Minnesota. new text end
26.25 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
26.26Sec. 23. Minnesota Statutes 2024, section 216I.02, is amended by adding a subdivision
26.27to read:
26.28 new text begin Subd. 5a. Emergency backup generator. "Emergency backup generator" has the new text end
26.29 new text begin meaning given in section 216B.02, subdivision 11. new text end
26.30 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
27.1Sec. 24. Minnesota Statutes 2024, section 216I.07, subdivision 2, is amended to read:
27.2Subd. 2. Applicable projects. The requirements and procedures under this section apply
27.3to projects for which the applicant's proposal is:
27.4(1) large electric power generating plants with a capacity of less than 80 megawatts;
27.5 new text begin (2) a combination of emergency backup generators designed to serve one person and new text end
27.6 new text begin located on property owned or controlled by the person; new text end
27.7 deleted text begin (2) deleted text end new text begin (3) new text end large electric power generating plants that are fueled by natural gas;
27.8 deleted text begin (3) deleted text end new text begin (4) new text end high-voltage transmission lines with a capacity between 100 and 300 kilovolts;
27.9 deleted text begin (4) deleted text end new text begin (5) new text end high-voltage transmission lines with a capacity in excess of 300 kilovolts and
27.10less than 30 miles in length in Minnesota;
27.11 deleted text begin (5) deleted text end new text begin (6) new text end high-voltage transmission lines with a capacity in excess of 300 kilovolts, if at
27.12least 80 percent of the distance of the line in Minnesota, as proposed by the applicant, is
27.13located along existing high-voltage transmission line right-of-way;
27.14 deleted text begin (6) deleted text end new text begin (7) new text end solar energy systems;
27.15 deleted text begin (7) deleted text end new text begin (8) new text end energy storage systems; and
27.16 deleted text begin (8) deleted text end new text begin (9) new text end large wind energy conversion systems.
27.17 new text begin EFFECTIVE DATE; APPLICATION. This section is effective July 1, 2025, and new text end
27.18 new text begin applies to applications under Minnesota Statutes, section 216I.07, that are pending before new text end
27.19 new text begin or submitted to the Public Utilities Commission on or after that date. new text end
27.20Sec. 25. Minnesota Statutes 2024, section 216I.07, subdivision 3, is amended to read:
27.21Subd. 3. Environmental review. (a) For the projects identified in subdivision 2 and
27.22following the procedures under this section, the applicant must prepare and submit an
27.23environmental assessment with the application. A draft of the environmental assessment
27.24must also be provided to commission staff as part of the preapplication review under section
27.25216I.05, subdivision 6. The environmental assessment must (1) contain information regarding
27.26the proposed project's human and environmental impacts, and (2) address mitigating measures
27.27for identified impacts. new text begin The environmental assessment for projects identified in subdivision new text end
27.28 new text begin 2, clause (2), must also include a discussion of reasonable alternatives to the proposed new text end
27.29 new text begin project considering: (i) the appropriateness of the size and type of the proposed generation new text end
27.30 new text begin method compared to reasonable alternatives; (ii) the cost to the proposer of energy to be new text end
27.31 new text begin supplied by the project compared to the cost of energy that would be supplied by reasonable new text end
28.1 new text begin alternatives; (iii) the effects of the proposed project on the natural and socioeconomic new text end
28.2 new text begin environments compared to the effects of reasonable alternatives; and (iv) the expected new text end
28.3 new text begin reliability of the proposed facility compared to the expected reliability of reasonable new text end
28.4 new text begin alternatives. new text end The environmental assessment is the only state environmental review document
28.5that must be prepared for the proposed project.
28.6(b) If after the public meeting the commission identifies other sites or routes or potential
28.7impacts for review, the commission must prepare an addendum to the environmental
28.8assessment that evaluates (1) the human and environmental impacts of the alternative site
28.9or route, and (2) any additional mitigating measures related to the identified impacts
28.10consistent with the scoping decision made pursuant to section 216I.06, subdivision 10,
28.11clause (2). The public may provide comments on the environmental assessment and any
28.12addendum to the environmental assessment at the public hearing and comment period under
28.13subdivision 4. When making the commission's final decision, the commission must consider
28.14the environmental assessment, the environmental assessment addendum, if any, and the
28.15entirety of the record related to human and environmental impacts.
28.16ARTICLE 4
28.17SECURITIZATION
28.18Section 1. new text begin [216B.491] DEFINITIONS. new text end
28.19 new text begin Subdivision 1. Scope. For the purposes of sections 216B.491 to 216B.499, the terms new text end
28.20 new text begin defined in this section have the meanings given. new text end
28.21 new text begin Subd. 2. Ancillary agreement. "Ancillary agreement" means a bond, insurance policy, new text end
28.22 new text begin letter of credit, reserve account, surety bond, interest rate lock or swap arrangement, liquidity new text end
28.23 new text begin or credit support arrangement, or other financial arrangement entered into in connection new text end
28.24 new text begin with extraordinary event bonds that is designed to promote the credit quality and new text end
28.25 new text begin marketability of extraordinary event bonds or to mitigate the risk of an increase in interest new text end
28.26 new text begin rates. new text end
28.27 new text begin Subd. 3. Assignee. "Assignee" means a person to which an interest in extraordinary new text end
28.28 new text begin event property is sold, assigned, transferred, or conveyed, other than as security, and any new text end
28.29 new text begin successor to or subsequent assignee of the person. new text end
28.30 new text begin Subd. 4. Bondholder. "Bondholder" means a holder or owner of extraordinary event new text end
28.31 new text begin bonds. new text end
29.1 new text begin Subd. 5. Customer. "Customer" means a person who purchases natural gas or natural new text end
29.2 new text begin gas transportation services from a utility in Minnesota. Customer does not include a person new text end
29.3 new text begin who: new text end
29.4 new text begin (1) purchases natural gas transportation services from a utility in Minnesota that serves new text end
29.5 new text begin fewer than 350,000 natural gas customers in Minnesota; and new text end
29.6 new text begin (2) does not purchase natural gas from a utility in Minnesota. new text end
29.7 new text begin Subd. 6. Extraordinary event. (a) "Extraordinary event" means an event arising from new text end
29.8 new text begin unforeseen circumstances of sufficient magnitude, as determined by the commission: new text end
29.9 new text begin (1) to impose significant costs on customers; and new text end
29.10 new text begin (2) for which the issuance of extraordinary event bonds in response to the event meets new text end
29.11 new text begin the conditions of section 216B.492, subdivision 2. new text end
29.12 new text begin (b) Extraordinary event includes but is not limited to a storm event or other natural new text end
29.13 new text begin disaster, an act of God, war, terrorism, sabotage, vandalism, a cybersecurity attack, or a new text end
29.14 new text begin temporary significant increase in the wholesale price of natural gas. new text end
29.15 new text begin Subd. 7. Extraordinary event activity. "Extraordinary event activity" means an activity new text end
29.16 new text begin undertaken by or on behalf of a utility to restore or maintain the utility's ability to provide new text end
29.17 new text begin natural gas service following one or more extraordinary events, including but not limited new text end
29.18 new text begin to activities related to mobilizing, staging, constructing, reconstructing, replacing, or repairing new text end
29.19 new text begin natural gas transmission, distribution, storage, or general facilities. new text end
29.20 new text begin Subd. 8. Extraordinary event bonds. "Extraordinary event bonds" means debt securities, new text end
29.21 new text begin including but not limited to senior secured bonds, debentures, notes, certificates of new text end
29.22 new text begin participation, certificates of beneficial interest, certificates of ownership, or other evidences new text end
29.23 new text begin of indebtedness or ownership, that: (1) have a scheduled maturity of no longer than 30 years new text end
29.24 new text begin and a final legal maturity date that is not later than 32 years from the issue date; (2) are rated new text end
29.25 new text begin AA, Aa2, or higher by a major independent credit rating agency at the time of issuance; new text end
29.26 new text begin and (3) are issued by a utility or an assignee under a financing order. new text end
29.27 new text begin Subd. 9. Extraordinary event charge. "Extraordinary event charge" means a new text end
29.28 new text begin nonbypassable charge that: new text end
29.29 new text begin (1) a utility that is the subject of a financing order or the utility's successor or assignee new text end
29.30 new text begin imposes on all of the utility's customers; new text end
29.31 new text begin (2) is separate from the utility's base rates; and new text end
30.1 new text begin (3) provides a source of revenue used only to repay, finance, or refinance extraordinary new text end
30.2 new text begin event costs. new text end
30.3 new text begin Subd. 10. Extraordinary event costs. "Extraordinary event costs": new text end
30.4 new text begin (1) means all incremental costs of extraordinary event activities that are approved by new text end
30.5 new text begin the commission in a financing order issued under section 216B.492 as being: new text end
30.6 new text begin (i) necessary to enable the utility to restore or maintain natural gas service to customers new text end
30.7 new text begin after the utility experiences an extraordinary event; and new text end
30.8 new text begin (ii) prudent and reasonable; new text end
30.9 new text begin (2) includes costs to repurchase equity or retire any indebtedness relating to extraordinary new text end
30.10 new text begin event activities; new text end
30.11 new text begin (3) are net of applicable insurance proceeds, tax benefits, and any other amounts intended new text end
30.12 new text begin to reimburse the utility for extraordinary event activities, including government grants or new text end
30.13 new text begin aid of any kind; new text end
30.14 new text begin (4) do not include any monetary penalty, fine, or forfeiture assessed against a utility by new text end
30.15 new text begin a government agency or court under a federal or state environmental statute, rule, or new text end
30.16 new text begin regulation; and new text end
30.17 new text begin (5) must be adjusted to reflect: new text end
30.18 new text begin (i) the difference, as determined by the commission, between extraordinary event costs new text end
30.19 new text begin that the utility expects to incur and actual, reasonable, and prudent costs incurred; or new text end
30.20 new text begin (ii) a more fair or reasonable allocation of extraordinary event costs to customers over new text end
30.21 new text begin time, as expressed in a commission order, provided that after the issuance of extraordinary new text end
30.22 new text begin event bonds relating to the extraordinary event costs, the adjustment must not (A) reduce new text end
30.23 new text begin or impair the extraordinary event property relating to the extraordinary event bonds, or (B) new text end
30.24 new text begin reduce, impair, postpone, or terminate extraordinary event charges relating to the new text end
30.25 new text begin extraordinary event bonds until all principal, interest, and redemption premium, if any, new text end
30.26 new text begin payable on the extraordinary event bonds, all financing costs for the extraordinary event new text end
30.27 new text begin bonds, and all amounts that must be paid to an assignee or financing party under an ancillary new text end
30.28 new text begin agreement relating to the extraordinary event bonds are paid in full. new text end
30.29 new text begin Subd. 11. Extraordinary event property. "Extraordinary event property" means: new text end
30.30 new text begin (1) all rights and interests that a utility or the utility's successor or assignee possess under new text end
30.31 new text begin a financing order to impose, bill, collect, receive, and obtain periodic adjustments to new text end
31.1 new text begin extraordinary event charges authorized under a financing order issued by the commission; new text end
31.2 new text begin and new text end
31.3 new text begin (2) all revenue, collections, claims, rights to payments, payments, money, or proceeds new text end
31.4 new text begin arising from the rights and interests specified in clause (1), regardless of whether any are new text end
31.5 new text begin commingled with other revenue, collections, rights to payment, payments, money, or new text end
31.6 new text begin proceeds. new text end
31.7 new text begin Subd. 12. Extraordinary event revenue. "Extraordinary event revenue" means revenue, new text end
31.8 new text begin receipts, collections, payments, money, claims, or other proceeds arising from extraordinary new text end
31.9 new text begin event property. new text end
31.10 new text begin Subd. 13. Financing costs. "Financing costs" means: new text end
31.11 new text begin (1) principal, interest, and redemption premiums, if any, that are payable on extraordinary new text end
31.12 new text begin event bonds; new text end
31.13 new text begin (2) payments required under an ancillary agreement and amounts required to fund or new text end
31.14 new text begin replenish a reserve account or other accounts established under the terms of any indenture, new text end
31.15 new text begin ancillary agreement, or other financing document pertaining to extraordinary event bonds; new text end
31.16 new text begin (3) other demonstrable costs related to issuing, supporting, repaying, refunding, and new text end
31.17 new text begin servicing extraordinary event bonds, including but not limited to servicing fees, accounting new text end
31.18 new text begin and auditing fees, trustee fees, legal fees, consulting fees, financial adviser fees, new text end
31.19 new text begin administrative fees, placement and underwriting fees, capitalized interest, rating agency new text end
31.20 new text begin fees, stock exchange listing and compliance fees, security registration fees, filing fees, new text end
31.21 new text begin information technology programming costs, and any other demonstrable costs necessary to new text end
31.22 new text begin otherwise ensure and guarantee the timely payment of extraordinary event bonds, other new text end
31.23 new text begin amounts payable in connection with extraordinary event bonds, or other extraordinary event new text end
31.24 new text begin charges payable in connection with extraordinary event bonds; new text end
31.25 new text begin (4) taxes and license fees imposed on the revenue generated from collecting an new text end
31.26 new text begin extraordinary event charge; new text end
31.27 new text begin (5) state and local taxes, including franchise, sales and use, and other taxes or similar new text end
31.28 new text begin charges, including but not limited to regulatory assessment fees, whether paid, payable, or new text end
31.29 new text begin accrued; and new text end
31.30 new text begin (6) costs incurred by the commission to (i) hire and compensate additional temporary new text end
31.31 new text begin staff needed to perform the commission's responsibilities under this section, and (ii) engage new text end
31.32 new text begin specialized counsel and expert consultants experienced in securitized utility ratepayer-backed new text end
32.1 new text begin bond financings similar to extraordinary event bonds financings, as provided under section new text end
32.2 new text begin 216B.494. new text end
32.3 new text begin Subd. 14. Financing order. "Financing order" means an order issued by the commission new text end
32.4 new text begin under section 216B.492 that authorizes an applicant to: new text end
32.5 new text begin (1) issue extraordinary event bonds in one or more series; new text end
32.6 new text begin (2) impose, charge, and collect extraordinary event charges; and new text end
32.7 new text begin (3) create extraordinary event property. new text end
32.8 new text begin Subd. 15. Financing party. "Financing party" means a holder of extraordinary event new text end
32.9 new text begin bonds and a trustee, a collateral agent, a party under an ancillary agreement, or any other new text end
32.10 new text begin person acting for the benefit of extraordinary event bondholders. new text end
32.11 new text begin Subd. 16. Natural gas facility. "Natural gas facility" means natural gas pipelines, new text end
32.12 new text begin including distribution lines, underground storage areas, liquefied natural gas facilities, new text end
32.13 new text begin propane storage tanks, and other facilities the commission determines are used and useful new text end
32.14 new text begin to provide natural gas service to retail and transportation customers in Minnesota. new text end
32.15 new text begin Subd. 17. Nonbypassable. "Nonbypassable" means an extraordinary event charge that new text end
32.16 new text begin a retail customer located within a utility service area cannot avoid and must pay. new text end
32.17 new text begin Subd. 18. Pretax costs. "Pretax costs" means costs incurred by a utility and approved new text end
32.18 new text begin by the commission, including but not limited to: new text end
32.19 new text begin (1) unrecovered capitalized costs of replaced natural gas facilities damaged or destroyed new text end
32.20 new text begin by an extraordinary event; new text end
32.21 new text begin (2) costs to decommission and restore the site of a natural gas facility damaged or new text end
32.22 new text begin destroyed by an extraordinary event; new text end
32.23 new text begin (3) other applicable capital and operating costs, accrued carrying charges, deferred new text end
32.24 new text begin expenses, reductions for applicable insurance, and salvage proceeds; and new text end
32.25 new text begin (4) costs to retire any existing indebtedness, fees, costs, and expenses to modify existing new text end
32.26 new text begin debt agreements, or for waivers or consents related to existing debt agreements. new text end
32.27 new text begin Subd. 19. Storm event. "Storm event" means a tornado, derecho, ice or snow storm, new text end
32.28 new text begin wildfire, flood, earthquake, or other significant weather or natural disaster that causes new text end
32.29 new text begin substantial damage to a utility's infrastructure. new text end
32.30 new text begin Subd. 20. Successor. "Successor" means a legal entity that succeeds by operation of law new text end
32.31 new text begin to the rights and obligations of another legal entity as a result of bankruptcy, reorganization, new text end
33.1 new text begin restructuring, other insolvency proceeding, merger, acquisition, consolidation, or sale or new text end
33.2 new text begin transfer of assets. new text end
33.3 new text begin Subd. 21. Utility. "Utility" means a public utility, as defined in section 216B.02, new text end
33.4 new text begin subdivision 4, that provides natural gas service to Minnesota customers. Utility includes new text end
33.5 new text begin the utility's successors or assignees. new text end
33.6Sec. 2. new text begin [216B.492] FINANCING ORDER. new text end
33.7 new text begin Subdivision 1. Application. (a) A utility may file an application with the commission new text end
33.8 new text begin requesting a financing order to enable the utility to recover extraordinary event costs by new text end
33.9 new text begin issuing extraordinary event bonds under this section. new text end
33.10 new text begin (b) The application must include the following information, as applicable: new text end
33.11 new text begin (1) a description of each natural gas facility to be repaired or replaced; new text end
33.12 new text begin (2) the undepreciated value remaining in each natural gas facility under clause (1) that new text end
33.13 new text begin the utility proposes to repair or replace using financing obtained by issuing extraordinary new text end
33.14 new text begin event bonds under sections 216B.491 to 216B.499, and the method used to calculate the new text end
33.15 new text begin undepreciated value remaining; new text end
33.16 new text begin (3) the estimated costs imposed on customers resulting from an extraordinary event that new text end
33.17 new text begin involves no physical damage to natural gas facilities; new text end
33.18 new text begin (4) the estimated savings or estimated mitigation of rate impacts to utility customers if new text end
33.19 new text begin the financing order is issued as requested in the application, calculated by comparing the new text end
33.20 new text begin costs to customers that are expected to result from implementing the financing order and new text end
33.21 new text begin the estimated costs associated with implementing traditional utility financing mechanisms new text end
33.22 new text begin with respect to the same undepreciated balance, expressed in net present value terms; new text end
33.23 new text begin (5) a description of (i) the nonbypassable extraordinary event charge utility customers new text end
33.24 new text begin must pay in order to fully recover financing costs, and (ii) the method and assumptions used new text end
33.25 new text begin to calculate the nonbypassable extraordinary event charge; new text end
33.26 new text begin (6) a proposed methodology to allocate the revenue requirement for the extraordinary new text end
33.27 new text begin event charge among the utility's customer classes; new text end
33.28 new text begin (7) a description of a proposed adjustment mechanism that is implemented when necessary new text end
33.29 new text begin to correct any overcollection or undercollection of extraordinary event charges, in order to new text end
33.30 new text begin complete payment of scheduled principal and interest on extraordinary event bonds and new text end
33.31 new text begin other financing costs in a timely fashion; new text end
34.1 new text begin (8) a memorandum with supporting exhibits, developed by a securities firm that is new text end
34.2 new text begin experienced in the marketing of securitized utility ratepayer-backed bonds, indicating the new text end
34.3 new text begin proposed issuance satisfies: (i) the current published AA, Aa2, or higher rating; or (ii) new text end
34.4 new text begin equivalent rating criteria of at least one nationally recognized securities rating organization new text end
34.5 new text begin for issuances similar to the proposed extraordinary event bonds; new text end
34.6 new text begin (9) an estimate of: (i) the timing of the extraordinary event bonds issuance; and (ii) the new text end
34.7 new text begin term of the extraordinary event bonds or series of bonds, provided that the scheduled final new text end
34.8 new text begin maturity for each bond issuance does not exceed 30 years; new text end
34.9 new text begin (10) identification of plans to sell, assign, transfer, or convey, other than as a security, new text end
34.10 new text begin interest in extraordinary event property, including identification of an assignee and new text end
34.11 new text begin demonstration that the assignee is a financing entity that is wholly owned, directly or new text end
34.12 new text begin indirectly, by the utility; new text end
34.13 new text begin (11) identification of ancillary agreements that may be necessary or appropriate; new text end
34.14 new text begin (12) one or more alternative financing scenarios in addition to the preferred scenario new text end
34.15 new text begin contained in the application; new text end
34.16 new text begin (13) the extent of damage to the utility's natural gas facility caused by an extraordinary new text end
34.17 new text begin event and the estimated costs to repair or replace the damaged natural gas facility; new text end
34.18 new text begin (14) a schedule of the proposed repairs to and replacement of the damaged natural gas new text end
34.19 new text begin facility; new text end
34.20 new text begin (15) a description of the steps taken to provide customers interim natural gas service new text end
34.21 new text begin while the damaged natural gas facility is being repaired or replaced; and new text end
34.22 new text begin (16) a description of the impacts on the utility's current workforce resulting from new text end
34.23 new text begin implementing a repair or replacement plan following an extraordinary event. new text end
34.24 new text begin Subd. 2. Findings. After providing notice and holding a public hearing on an application new text end
34.25 new text begin filed under subdivision 1, the commission may issue a financing order if the commission new text end
34.26 new text begin finds that: new text end
34.27 new text begin (1) the extraordinary event costs described in the application are reasonable; new text end
34.28 new text begin (2) the proposed issuance of extraordinary event bonds and the imposition and collection new text end
34.29 new text begin of extraordinary event charges: new text end
34.30 new text begin (i) are just and reasonable; new text end
34.31 new text begin (ii) are consistent with the public interest; new text end
35.1 new text begin (iii) constitute a prudent and reasonable mechanism to finance the extraordinary event new text end
35.2 new text begin costs; and new text end
35.3 new text begin (iv) provide tangible and quantifiable benefits to customers, either by providing lower new text end
35.4 new text begin overall costs or mitigating rate impacts relative to traditional methods of financing, that new text end
35.5 new text begin exceed the benefits achieved absent the issuance of extraordinary event bonds; and new text end
35.6 new text begin (3) the proposed structuring, marketing, and pricing of the extraordinary event bonds: new text end
35.7 new text begin (i) lower overall costs to customers or mitigate rate impacts to customers relative to new text end
35.8 new text begin traditional methods of financing; and new text end
35.9 new text begin (ii) achieve customer savings or mitigate rate impacts to customers, as determined by new text end
35.10 new text begin the commission in a financing order, consistent with market conditions at the time of sale new text end
35.11 new text begin and the terms of the financing order. new text end
35.12 new text begin Subd. 3. Contents. (a) A financing order issued under this section must: new text end
35.13 new text begin (1) determine the maximum amount of extraordinary event costs that may be financed new text end
35.14 new text begin from proceeds of extraordinary event bonds issued pursuant to the financing order; new text end
35.15 new text begin (2) describe the proposed customer billing mechanism for extraordinary event charges new text end
35.16 new text begin and include a finding that the mechanism is just and reasonable; new text end
35.17 new text begin (3) describe the financing costs that may be recovered through extraordinary event new text end
35.18 new text begin charges and the period over which the costs may be recovered, which must end no earlier new text end
35.19 new text begin than the date of final legal maturity of the extraordinary event bonds; new text end
35.20 new text begin (4) describe the extraordinary event property that is created and that may be used to pay, new text end
35.21 new text begin and secure the payment of, principal and interest on the extraordinary event bonds and other new text end
35.22 new text begin financing costs authorized in the financing order; new text end
35.23 new text begin (5) authorize the utility to finance extraordinary event costs by issuing one or more series new text end
35.24 new text begin of extraordinary event bonds. A utility is not required to secure a separate financing order new text end
35.25 new text begin for each extraordinary event bonds issuance or for each scheduled phase to replace natural new text end
35.26 new text begin gas facilities approved in the financing order; new text end
35.27 new text begin (6) include a formula-based mechanism that must be used to make expeditious periodic new text end
35.28 new text begin adjustments to the extraordinary event charges authorized by the financing order that are new text end
35.29 new text begin necessary to (i) correct for any overcollection or undercollection, or (ii) otherwise provide new text end
35.30 new text begin for the timely payment of extraordinary event bonds, other financing costs, and other required new text end
35.31 new text begin amounts and charges payable in connection with extraordinary event bonds; new text end
36.1 new text begin (7) specify the degree of flexibility afforded to the utility to establish the terms and new text end
36.2 new text begin conditions of the extraordinary event bonds, including but not limited to repayment schedules, new text end
36.3 new text begin expected interest rates, and other financing costs; new text end
36.4 new text begin (8) specify that the extraordinary event bonds must be issued, subject to market conditions new text end
36.5 new text begin and the financing order's terms, as soon as feasible following the financing order's issuance; new text end
36.6 new text begin (9) require the utility, at the same time extraordinary event charges are initially collected new text end
36.7 new text begin and independent of the schedule to close and decommission any natural gas facility replaced new text end
36.8 new text begin as the result of an extraordinary event, if any, to remove the natural gas facility from the new text end
36.9 new text begin utility's rate base and commensurately reduce the utility's base rates; new text end
36.10 new text begin (10) specify a future ratemaking process to reconcile any difference between the projected new text end
36.11 new text begin pretax costs included in the amount financed by extraordinary event bonds and the final new text end
36.12 new text begin actual pretax costs incurred by the utility to retire or replace the natural gas facility, if any; new text end
36.13 new text begin (11) specify information regarding extraordinary event bonds issuance and repayments, new text end
36.14 new text begin financing costs, energy transaction charges, extraordinary event property, and related matters new text end
36.15 new text begin that the natural gas utility is required to provide to the commission on a schedule determined new text end
36.16 new text begin by the commission; new text end
36.17 new text begin (12) allow or require the creation of a utility's extraordinary event property to be new text end
36.18 new text begin conditioned on, and occur simultaneously with, the sale or other transfer of the extraordinary new text end
36.19 new text begin event property to an assignee and the pledge of the extraordinary event property to secure new text end
36.20 new text begin the extraordinary event bonds; new text end
36.21 new text begin (13) ensure that the structuring, marketing, and pricing of extraordinary event bonds new text end
36.22 new text begin result in reasonable extraordinary event charges and customer savings or rate impact new text end
36.23 new text begin mitigation, consistent with market conditions and the financing order's terms; and new text end
36.24 new text begin (14) specify that a utility that finances the replacement of one or more natural gas facilities new text end
36.25 new text begin after the natural gas facilities that are subject to the finance order are removed from the new text end
36.26 new text begin utility's rate base is prohibited from: new text end
36.27 new text begin (i) operating the natural gas facilities; or new text end
36.28 new text begin (ii) selling the natural gas facilities to another entity to operate as natural gas facilities. new text end
36.29 new text begin (b) A financing order issued under this section may: new text end
36.30 new text begin (1) include conditions different from those requested in the application that the new text end
36.31 new text begin commission determines are necessary to: new text end
36.32 new text begin (i) promote the public interest; and new text end
37.1 new text begin (ii) maximize the financial benefits or minimize the financial risks of the transaction to new text end
37.2 new text begin customers and to directly impacted Minnesota workers and communities; and new text end
37.3 new text begin (2) select one or more underwriters for the extraordinary event bonds. new text end
37.4 new text begin Subd. 4. Duration; irrevocability; subsequent order. (a) A financing order remains new text end
37.5 new text begin effective until the extraordinary event bonds issued under the financing order and all new text end
37.6 new text begin financing costs related to the extraordinary event bonds have been paid in full. new text end
37.7 new text begin (b) A financing order remains effective and unabated notwithstanding the bankruptcy, new text end
37.8 new text begin reorganization, or insolvency of the utility to which the financing order applies or any new text end
37.9 new text begin affiliate, successor, or assignee of the utility to which the financing order applies. new text end
37.10 new text begin (c) Subject to judicial review under section 216B.52, a financing order is irrevocable new text end
37.11 new text begin and is not reviewable by a future commission. The commission must not: (1) reduce, impair, new text end
37.12 new text begin postpone, or terminate extraordinary event charges approved in a financing order; (2) reduce new text end
37.13 new text begin or impair the extraordinary event property approved in a financing order or impair the new text end
37.14 new text begin collection or recovery of extraordinary event charges and extraordinary event revenue; or new text end
37.15 new text begin (3) change the customers required to pay extraordinary event charges. new text end
37.16 new text begin (d) Notwithstanding paragraph (c), the commission may, on the commission's own new text end
37.17 new text begin motion or at the request of a utility or any other person, commence a proceeding and issue new text end
37.18 new text begin a subsequent financing order that provides for refinancing, retiring, or refunding extraordinary new text end
37.19 new text begin event bonds issued under the original financing order if: new text end
37.20 new text begin (1) the commission makes all of the findings specified in subdivision 2 with respect to new text end
37.21 new text begin the subsequent financing order; and new text end
37.22 new text begin (2) the modification contained in the subsequent financing order does not in any way new text end
37.23 new text begin impair the covenants and terms of the extraordinary event bonds being refinanced, retired, new text end
37.24 new text begin or refunded. new text end
37.25 new text begin Subd. 5. Effect on commission jurisdiction. (a) Except as provided in paragraph (b), new text end
37.26 new text begin the commission, in exercising the powers and carrying out the duties under this section, is new text end
37.27 new text begin prohibited from: new text end
37.28 new text begin (1) considering extraordinary event bonds issued under this section to be debt of the new text end
37.29 new text begin utility other than for income tax purposes, unless considering the extraordinary event bonds new text end
37.30 new text begin to be debt is necessary to achieve consistency with prevailing utility debt rating new text end
37.31 new text begin methodologies; new text end
37.32 new text begin (2) considering the extraordinary event charges paid under the financing order to be new text end
37.33 new text begin revenue of the utility; new text end
38.1 new text begin (3) considering the extraordinary event costs or financing costs specified in the financing new text end
38.2 new text begin order to be the regulated costs or assets of the utility; or new text end
38.3 new text begin (4) determining that any prudent action taken by a utility that is consistent with the new text end
38.4 new text begin financing order is unjust or unreasonable. new text end
38.5 new text begin (b) Nothing in this subdivision: new text end
38.6 new text begin (1) affects the authority of the commission to apply or modify a billing mechanism new text end
38.7 new text begin designed to recover extraordinary event charges; new text end
38.8 new text begin (2) prevents or precludes the commission from (i) investigating a utility's compliance new text end
38.9 new text begin with the financing order's terms and conditions, and (ii) requiring compliance with the new text end
38.10 new text begin financing order; or new text end
38.11 new text begin (3) prevents or precludes the commission from imposing regulatory sanctions against a new text end
38.12 new text begin utility for failure to comply with (i) the financing order's terms and conditions, or (ii) the new text end
38.13 new text begin requirements of this section. new text end
38.14 new text begin (c) The commission is prohibited from refusing to allow a utility to recover any costs new text end
38.15 new text begin associated with the replacement of natural gas facilities solely because the utility has elected new text end
38.16 new text begin to finance the natural gas facility replacement through a financing mechanism other than new text end
38.17 new text begin extraordinary event bonds. new text end
38.18Sec. 3. new text begin [216B.493] POSTORDER COMMISSION DUTIES. new text end
38.19 new text begin Subdivision 1. Financing costs review. Within 120 days after the date extraordinary new text end
38.20 new text begin event bonds are issued, a utility subject to a financing order must file with the commission new text end
38.21 new text begin the actual initial and ongoing financing costs, the final structure and pricing of the new text end
38.22 new text begin extraordinary event bonds, and the actual extraordinary event charge. The commission must new text end
38.23 new text begin review the prudence of the natural gas utility's actions to determine whether the actual new text end
38.24 new text begin financing costs were the lowest that could reasonably be achieved given the financing order's new text end
38.25 new text begin terms and market conditions prevailing at the time of the extraordinary event bond's issuance. new text end
38.26 new text begin Subd. 2. Enforcement. If the commission determines that a utility's actions under this new text end
38.27 new text begin section are not prudent or are inconsistent with the financing order, the commission may new text end
38.28 new text begin apply remedies deemed appropriate for utility actions, provided that any remedy applied new text end
38.29 new text begin must not directly or indirectly: (1) reduce or impair the extraordinary event property approved new text end
38.30 new text begin in the financing order or impair the collection or recovery of extraordinary event charges new text end
38.31 new text begin and extraordinary event revenue; (2) reduce, impair, postpone, or terminate extraordinary new text end
38.32 new text begin event charges approved in the financing order until all principal, interest, and redemption new text end
38.33 new text begin premium, if any, payable on the extraordinary event bonds, all financing costs, and all new text end
39.1 new text begin amounts to be paid to an assignee or financing party under an ancillary agreement are paid new text end
39.2 new text begin in full; or (3) change the customers required to pay extraordinary event charges. new text end
39.3Sec. 4. new text begin [216B.494] USE OF OUTSIDE EXPERTS. new text end
39.4 new text begin (a) To carry out the duties under this section, the commission may: new text end
39.5 new text begin (1) contract with outside consultants and counsel experienced in securitized utility new text end
39.6 new text begin customer-backed bond financing similar to extraordinary event bonds; and new text end
39.7 new text begin (2) hire and compensate additional temporary staff as needed. new text end
39.8 new text begin Expenses incurred by the commission under this paragraph must be treated as financing new text end
39.9 new text begin costs paid by the extraordinary event revenue. The costs incurred under clause (1) are not new text end
39.10 new text begin an obligation of the state and are assigned solely to the transaction. new text end
39.11 new text begin (b) A utility presented with a written request from the commission to reimburse the new text end
39.12 new text begin commission's expenses incurred under paragraph (a), accompanied by a detailed account new text end
39.13 new text begin of the subject expenses, must provide the issuer of the extraordinary event bonds and the new text end
39.14 new text begin indenture trustee for the extraordinary event bonds with such documentation. The indenture new text end
39.15 new text begin trustee must remit full payment of the expenses to the commission on the next interest new text end
39.16 new text begin payment date of the extraordinary event bonds after the payment of interest and scheduled new text end
39.17 new text begin principal of the extraordinary event bonds in accordance with the payment waterfall included new text end
39.18 new text begin in the indenture governing the extraordinary event bonds. new text end
39.19 new text begin (c) If a utility's application for a financing order is denied or withdrawn for any reason new text end
39.20 new text begin and extraordinary event bonds are not issued, the commission's costs to retain expert new text end
39.21 new text begin consultants under this section must be paid by the applicant utility and are deemed a prudent new text end
39.22 new text begin deferred expense eligible for recovery in the utility's future rates. new text end
39.23Sec. 5. new text begin [216B.495] EXTRAORDINARY EVENT CHARGE; BILLING TREATMENT. new text end
39.24 new text begin (a) A utility that obtains a financing order and issues extraordinary event bonds must: new text end
39.25 new text begin (1) include on each customer's monthly natural gas bill: new text end
39.26 new text begin (i) a statement that a portion of the charges represents extraordinary event charges new text end
39.27 new text begin approved in a financing order; new text end
39.28 new text begin (ii) the amount and rate of the extraordinary event charge as a separate line item titled new text end
39.29 new text begin "extraordinary event charge"; and new text end
40.1 new text begin (iii) if extraordinary event property has been transferred to an assignee, a statement that new text end
40.2 new text begin the assignee is the owner of the rights to extraordinary event charges and that the utility or new text end
40.3 new text begin other entity, if applicable, is acting as a collection agent or servicer for the assignee; and new text end
40.4 new text begin (2) file annually with the commission: new text end
40.5 new text begin (i) a calculation that identifies the impact financing the retirement or replacement of new text end
40.6 new text begin natural gas facilities has on customer rates, itemized by customer class; and new text end
40.7 new text begin (ii) evidence demonstrating that extraordinary event revenues are applied solely to pay new text end
40.8 new text begin (A) principal and interest on extraordinary event bonds, and (B) other financing costs. new text end
40.9 new text begin (b) Extraordinary event charges are nonbypassable and must be paid by all existing and new text end
40.10 new text begin future customers receiving service from the utility or the utility's successors or assignees new text end
40.11 new text begin under commission-approved rate schedules or special contracts. new text end
40.12 new text begin (c) A utility's failure to comply with this section does not invalidate, impair, or affect new text end
40.13 new text begin any financing order, extraordinary event property, extraordinary event charge, or new text end
40.14 new text begin extraordinary event bonds, but does subject the utility to penalties under applicable new text end
40.15 new text begin commission rules provided that any penalty applied must not directly or indirectly: (1) new text end
40.16 new text begin reduce or impair the extraordinary event property approved in the financing order or impair new text end
40.17 new text begin the collection or recovery of extraordinary event charges and extraordinary event revenue; new text end
40.18 new text begin (2) reduce, impair, postpone, or terminate extraordinary event charges approved in the new text end
40.19 new text begin financing order until all principal, interest, and redemption premium, if any, payable on the new text end
40.20 new text begin extraordinary event bonds, all financing costs, and all amounts to be paid to an assignee or new text end
40.21 new text begin financing party under an ancillary agreement are paid in full; or (3) change the customers new text end
40.22 new text begin required to pay extraordinary event charges. new text end
40.23Sec. 6. new text begin [216B.496] EXTRAORDINARY EVENT PROPERTY. new text end
40.24 new text begin Subdivision 1. General. (a) Extraordinary event property is an existing present property new text end
40.25 new text begin right or interest in a property right, even though the imposition and collection of extraordinary new text end
40.26 new text begin event charges depend on the utility collecting extraordinary event charges and on future new text end
40.27 new text begin natural gas consumption. The property right or interest exists regardless of whether the new text end
40.28 new text begin revenues or proceeds arising from the extraordinary event property have been billed, have new text end
40.29 new text begin accrued, or have been collected. new text end
40.30 new text begin (b) Extraordinary event property exists until all extraordinary event bonds issued under new text end
40.31 new text begin a financing order are paid in full and all financing costs and other extraordinary event bonds new text end
40.32 new text begin costs have been recovered in full. new text end
41.1 new text begin (c) All or any portion of extraordinary event property described in a financing order new text end
41.2 new text begin issued to a utility may be transferred, sold, conveyed, or assigned to a successor or assignee new text end
41.3 new text begin that is wholly owned, directly or indirectly, by the utility and created for the limited purpose new text end
41.4 new text begin of acquiring, owning, or administering extraordinary event property or issuing extraordinary new text end
41.5 new text begin event bonds authorized by the financing order. All or any portion of extraordinary event new text end
41.6 new text begin property may be pledged to secure extraordinary event bonds issued under a financing order, new text end
41.7 new text begin amounts payable to financing parties and to counterparties under any ancillary agreements, new text end
41.8 new text begin and other financing costs. Each transfer, sale, conveyance, assignment, or pledge by a utility new text end
41.9 new text begin or an affiliate of extraordinary event property is a transaction in the ordinary course of new text end
41.10 new text begin business. new text end
41.11 new text begin (d) If a utility defaults on any required payment of charges arising from extraordinary new text end
41.12 new text begin event property described in a financing order, a court, upon petition by an interested party new text end
41.13 new text begin and without limiting any other remedies available to the petitioner, must order the new text end
41.14 new text begin sequestration and payment of the revenues arising from the extraordinary event property to new text end
41.15 new text begin the financing parties. new text end
41.16 new text begin (e) The interest of a transferee, purchaser, acquirer, assignee, or pledgee in extraordinary new text end
41.17 new text begin event property specified in a financing order issued to a utility, and in the revenue and new text end
41.18 new text begin collections arising from the property, is not subject to setoff, counterclaim, surcharge, or new text end
41.19 new text begin defense by the utility or any other person, or in connection with the reorganization, new text end
41.20 new text begin bankruptcy, or other insolvency of the utility or any other entity. new text end
41.21 new text begin (f) A successor to a utility, whether resulting from a reorganization, bankruptcy, or other new text end
41.22 new text begin insolvency proceeding, merger or acquisition, sale, other business combination, transfer by new text end
41.23 new text begin operation of law, utility restructuring, or otherwise: (1) must perform and satisfy all new text end
41.24 new text begin obligations of, and has the same duties and rights under, a financing order as the utility to new text end
41.25 new text begin which the financing order applies; and (2) must perform the duties and exercise the rights new text end
41.26 new text begin in the same manner and to the same extent as the utility, including (i) collecting extraordinary new text end
41.27 new text begin event bonds revenues, collections, payments, or proceeds, and (ii) paying a person entitled new text end
41.28 new text begin to receive extraordinary event bonds revenues, collections, payments, or proceeds. new text end
41.29 new text begin Subd. 2. Security interests in extraordinary event property. (a) The creation, new text end
41.30 new text begin perfection, and enforcement of any security interest in extraordinary event property to secure new text end
41.31 new text begin the repayment of the principal and interest on extraordinary event bonds, amounts payable new text end
41.32 new text begin under any ancillary agreement, and other financing costs are governed by this section only. new text end
41.33 new text begin (b) A security interest in extraordinary event property is created, valid, and binding new text end
41.34 new text begin when: new text end
42.1 new text begin (1) the financing order that describes the extraordinary event property is issued; new text end
42.2 new text begin (2) a security agreement is executed and delivered; and new text end
42.3 new text begin (3) value is received for the extraordinary event bonds. new text end
42.4 new text begin (c) Once a security interest in extraordinary event property is created, the security interest new text end
42.5 new text begin attaches without any physical delivery of collateral or any other act. The lien of the security new text end
42.6 new text begin interest is valid, binding, and perfected against all parties having claims of any kind in tort, new text end
42.7 new text begin in contract, or otherwise against the person granting the security interest, regardless of new text end
42.8 new text begin whether the parties have notice of the lien, upon the filing of a financing statement with the new text end
42.9 new text begin secretary of state. new text end
42.10 new text begin (d) The description or indication of extraordinary event property in a transfer or security new text end
42.11 new text begin agreement and a financing statement is sufficient only if the description or indication refers new text end
42.12 new text begin to this section and the financing order creating the extraordinary event property. new text end
42.13 new text begin (e) A security interest in extraordinary event property is a continuously perfected security new text end
42.14 new text begin interest and has priority over any other lien, created by operation of law or otherwise, that new text end
42.15 new text begin may subsequently attach to the extraordinary event property unless the person that holds new text end
42.16 new text begin the security interest has agreed otherwise in writing. new text end
42.17 new text begin (f) The priority of a security interest in extraordinary event property is not affected by new text end
42.18 new text begin the commingling of extraordinary event property or extraordinary event revenue with other new text end
42.19 new text begin money. An assignee, bondholder, or financing party has a perfected security interest in the new text end
42.20 new text begin amount of all extraordinary event property or extraordinary event revenue that is pledged new text end
42.21 new text begin to pay extraordinary event bonds even if the extraordinary event property or extraordinary new text end
42.22 new text begin event revenue is deposited in a cash or deposit account owned by the utility in which the new text end
42.23 new text begin extraordinary event revenue is commingled with other money. Any other security interest new text end
42.24 new text begin that applies to the other money does not apply to the extraordinary event revenue. new text end
42.25 new text begin (g) A subsequent commission order amending a financing order under section 216B.492, new text end
42.26 new text begin subdivision 4, or the application of an adjustment mechanism authorized by a financing new text end
42.27 new text begin order under section 216B.492, subdivision 3, does not affect the validity, perfection, or new text end
42.28 new text begin priority of a security interest in or transfer of extraordinary event property. new text end
42.29 new text begin Subd. 3. Sales of extraordinary event property. (a) A sale, assignment, or transfer of new text end
42.30 new text begin extraordinary event property is an absolute transfer and true sale of, and not a pledge of or new text end
42.31 new text begin secured transaction relating to, the seller's right, title, and interest in, to, and under the new text end
42.32 new text begin extraordinary event property if the documents governing the transaction expressly state that new text end
43.1 new text begin the transaction is a sale or other absolute transfer. A transfer of an interest in extraordinary new text end
43.2 new text begin event property may be created when: new text end
43.3 new text begin (1) the financing order creating and describing the extraordinary event property is new text end
43.4 new text begin effective; new text end
43.5 new text begin (2) the documents evidencing the transfer of the extraordinary event property are executed new text end
43.6 new text begin and delivered to the assignee; and new text end
43.7 new text begin (3) value is received. new text end
43.8 new text begin (b) The characterization of a sale, assignment, or transfer as an absolute transfer and new text end
43.9 new text begin true sale, and the corresponding characterization of the property interest of the assignee, is new text end
43.10 new text begin not affected or impaired by: new text end
43.11 new text begin (1) commingling extraordinary event revenue with other money; new text end
43.12 new text begin (2) the seller retaining: new text end
43.13 new text begin (i) a partial or residual interest, including an equity interest, in the extraordinary event new text end
43.14 new text begin property, whether (A) direct or indirect, or (B) subordinate or otherwise; or new text end
43.15 new text begin (ii) the right to recover costs associated with taxes, franchise fees, or license fees imposed new text end
43.16 new text begin on the collection of extraordinary event revenue; new text end
43.17 new text begin (3) any recourse that the extraordinary event property purchaser may have against the new text end
43.18 new text begin seller; new text end
43.19 new text begin (4) any indemnification rights, obligations, or repurchase rights made or provided by new text end
43.20 new text begin the extraordinary event property seller; new text end
43.21 new text begin (5) the extraordinary event property seller's obligation to collect extraordinary event new text end
43.22 new text begin revenues on behalf of an assignee; new text end
43.23 new text begin (6) the treatment of the sale, assignment, or transfer for tax, financial reporting, or other new text end
43.24 new text begin purposes; new text end
43.25 new text begin (7) any subsequent financing order amending a financing order under section 216B.492, new text end
43.26 new text begin subdivision 4, paragraph (d); or new text end
43.27 new text begin (8) any application of an adjustment mechanism under section 216B.492, subdivision new text end
43.28 new text begin 3, paragraph (a), clause (6). new text end
44.1Sec. 7. new text begin [216B.497] EXTRAORDINARY EVENT BONDS. new text end
44.2 new text begin (a) A bank, trust company, savings and loan association, insurance company, executor, new text end
44.3 new text begin administrator, guardian, trustee, or other fiduciary may legally invest any money within the new text end
44.4 new text begin individual's or entity's control in extraordinary event bonds. new text end
44.5 new text begin (b) Extraordinary event bonds issued under a financing order are not debt of or a pledge new text end
44.6 new text begin of the faith and credit or taxing power of the state, any agency of the state, or any political new text end
44.7 new text begin subdivision. An extraordinary event bonds holder does not possess the ability to compel new text end
44.8 new text begin taxes to be levied by the state or a political subdivision in order to pay the principal or new text end
44.9 new text begin interest on extraordinary event bonds. The issuance of extraordinary event bonds does not new text end
44.10 new text begin directly, indirectly, or contingently obligate the state or a political subdivision to levy any new text end
44.11 new text begin tax or make any appropriation to pay principal or interest on the extraordinary event bonds. new text end
44.12 new text begin (c) The state pledges to and agrees with an extraordinary event bonds holder, assignee, new text end
44.13 new text begin and financing party that the state and state agencies, including the commission, are prohibited new text end
44.14 new text begin from: new text end
44.15 new text begin (1) taking or permitting an action that reduces or impairs the extraordinary event property new text end
44.16 new text begin approved in the financing order or impairs the collection or recovery of extraordinary event new text end
44.17 new text begin charges or extraordinary event revenue; new text end
44.18 new text begin (2) reducing, impairing, postponing, or terminating extraordinary event charges approved new text end
44.19 new text begin in the financing order that are imposed, collected, and remitted for the benefit of an new text end
44.20 new text begin extraordinary event bonds holder, assignee, and financing party until all principal, interest, new text end
44.21 new text begin and redemption premium, if any, payable on extraordinary event bonds, all financing costs, new text end
44.22 new text begin and all amounts to be paid to an assignee or financing party under an ancillary agreement new text end
44.23 new text begin are paid in full; or new text end
44.24 new text begin (3) changing the customers required to pay the extraordinary event charges. new text end
44.25 new text begin (d) The commission may include a pledge in the financing order similar to the pledge new text end
44.26 new text begin included in paragraph (c). new text end
44.27 new text begin (e) A person who issues extraordinary event bonds may include the pledge specified in new text end
44.28 new text begin paragraphs (c) and (d) in the extraordinary event bonds, ancillary agreements, and new text end
44.29 new text begin documentation related to the issuance and marketing of the extraordinary event bonds. new text end
45.1Sec. 8. new text begin [216B.498] ASSIGNEE OF FINANCING PARTY NOT SUBJECT TO new text end
45.2 new text begin COMMISSION REGULATION. new text end
45.3 new text begin An assignee or financing party that is not already regulated by the commission does not new text end
45.4 new text begin become subject to commission regulation solely as a result of engaging in any transaction new text end
45.5 new text begin authorized by or described in sections 216B.491 to 216B.499. new text end
45.6Sec. 9. new text begin [216B.499] EFFECT ON OTHER LAWS. new text end
45.7 new text begin (a) If a provision of sections 216B.491 to 216B.499 conflicts with other law regarding new text end
45.8 new text begin the attachment, assignment, perfection, effect of perfection, or priority of a security interest new text end
45.9 new text begin in or transfer of extraordinary event property, sections 216B.491 to 216B.499 govern. new text end
45.10 new text begin (b) Nothing in this section precludes a utility for which the commission has initially new text end
45.11 new text begin issued a financing order from applying to the commission for: new text end
45.12 new text begin (1) a subsequent financing order amending the financing order under section 216B.492, new text end
45.13 new text begin subdivision 4, paragraph (d); or new text end
45.14 new text begin (2) approval to issue extraordinary event bonds to refund all or a portion of an outstanding new text end
45.15 new text begin series of extraordinary event bonds. new text end
45.16Sec. 10. Minnesota Statutes 2024, section 216B.62, subdivision 3, is amended to read:
45.17Subd. 3. Assessing all public utilities. The department and commission shall quarterly,
45.18at least 30 days before the start of each quarter, estimate the total of their expenditures in
45.19the performance of their duties relating to public utilities under sections 216B.01 to 216B.67,
45.20other than amounts chargeable to public utilities under subdivision 2, 6, 7, deleted text begin or deleted text end 8 new text begin , or 9 new text end . The
45.21remainder shall be assessed by the commission and department to the several public utilities
45.22in proportion to their respective gross operating revenues from retail sales of gas or electric
45.23service within the state during the last calendar year. The assessment shall be paid into the
45.24state treasury within 30 days after the bill has been transmitted via mail, personal delivery,
45.25or electronic service to the several public utilities, which shall constitute notice of the
45.26assessment and demand of payment thereof. The total amount which may be assessed to
45.27the public utilities, under authority of this subdivision, shall not exceed one-sixth of one
45.28percent of the total gross operating revenues of the public utilities during the calendar year
45.29from retail sales of gas or electric service within the state. The assessment for the third
45.30quarter of each fiscal year shall be adjusted to compensate for the amount by which actual
45.31expenditures by the commission and department for the preceding fiscal year were more or
45.32less than the estimated expenditures previously assessed.
46.1Sec. 11. Minnesota Statutes 2024, section 216B.62, is amended by adding a subdivision
46.2to read:
46.3 new text begin Subd. 9. Administrative costs for extraordinary event bonds. The commission and new text end
46.4 new text begin the department may assess gas utilities for the actual commission and department costs of new text end
46.5 new text begin administering extraordinary event bonds under sections 216B.491 to 216B.499. The money new text end
46.6 new text begin received from the assessment shall be deposited into an account in the special revenue fund new text end
46.7 new text begin and all funds deposited are appropriated to the commission or the department for the purposes new text end
46.8 new text begin of this subdivision. The commission and department may initially assess for estimated costs new text end
46.9 new text begin under sections 216B.491 to 216B.499, then must adjust subsequent assessments for actual new text end
46.10 new text begin costs incurred under sections 216B.491 to 216B.499. An assessment made under this new text end
46.11 new text begin subdivision is not subject to the cap on assessments provided in subdivision 3 or any other new text end
46.12 new text begin law. new text end
46.13ARTICLE 5
46.14RENEWABLE DEVELOPMENT ACCOUNT SUNSET
46.15Section 1. Minnesota Statutes 2024, section 116C.7792, is amended to read:
46.16116C.7792 SOLAR ENERGY PRODUCTION INCENTIVE PROGRAM.
46.17 new text begin Subdivision 1. Program operations. new text end (a) The utility subject to section deleted text begin 116C.779 deleted text end
46.18 new text begin 216B.1641 new text end shall operate a program to provide solar energy production incentives for solar
46.19energy systems of no more than a total aggregate nameplate capacity of 40 kilowatts
46.20alternating current per premise. The owner of a solar energy system installed before June
46.211, 2018, is eligible to receive a production incentive under this section for any additional
46.22solar energy systems constructed at the same customer location, provided that the aggregate
46.23capacity of all systems at the customer location does not exceed 40 kilowatts.
46.24(b) new text begin Through 2025, new text end the program is funded by money deleted text begin withheld from transfer to the deleted text end
46.25 deleted text begin renewable development account under section 116C.779, subdivision 1, paragraphs (b) and deleted text end
46.26 deleted text begin (e). Program funds must be placed deleted text end new text begin that the utility deposits new text end in a separate account for the
46.27purpose of the solar energy production incentive program operated by the utility and not
46.28for any other program or purpose.
46.29(c) Funds allocated to the solar energy production incentive program in 2019 and 2020
46.30remain available to the solar energy production incentive program.
46.31(d) The following amounts are allocated to the solar energy production incentive program:
46.32(1) $10,000,000 in 2021;
47.1(2) $10,000,000 in 2022;
47.2(3) $5,000,000 in 2023;
47.3(4) $11,250,000 in 2024; new text begin and new text end
47.4(5) $6,250,000 in 2025 deleted text begin ; and deleted text end new text begin . new text end
47.5 deleted text begin (6) $5,000,000 each year, beginning in 2026 through 2035. deleted text end
47.6(e) Notwithstanding the Department of Commerce's November 14, 2018, decision in
47.7Docket No. E002/M-13-1015 regarding operation of the utility's solar energy production
47.8incentive program, half of the amounts allocated each year under paragraph (d), clauses (3),
47.9(4), and (5), must be reserved for solar energy systems whose installation meets the eligibility
47.10standards for the low-income program established in the November 14, 2018, decision or
47.11successor decisions of the department. All other program operations of the solar energy
47.12production incentive program are governed by the provisions of the November 14, 2018,
47.13decision or successor decisions of the department.
47.14(f) deleted text begin Funds deleted text end new text begin Money new text end allocated to the solar energy production incentive program that deleted text begin have deleted text end
47.15 new text begin has new text end not been committed to a specific project at the end of a program year deleted text begin remain deleted text end new text begin remains new text end
47.16available to the solar energy production incentive program new text begin , except that the utility's money new text end
47.17 new text begin that has not been obligated to a specific project by December 31, 2025, must be refunded new text end
47.18 new text begin to the utility's electric service customers in a manner and according to a schedule determined new text end
47.19 new text begin by the Public Utilities Commission new text end .
47.20 deleted text begin (g) Any unspent amount remaining on January 1, 2028, must be transferred to the deleted text end
47.21 deleted text begin renewable development account. deleted text end
47.22 deleted text begin (h) deleted text end new text begin (g) new text end A solar energy system receiving a production incentive under this section must
47.23be sized to less than 120 percent of the customer's on-site annual energy consumption when
47.24combined with other distributed generation resources and subscriptions provided under
47.25section 216B.1641 associated with the premise. The production incentive must be paid for
47.26ten years commencing with the commissioning of the system.
47.27 deleted text begin (i) deleted text end new text begin (h) new text end The utility must file a plan to operate the program with the commissioner of
47.28commerce. The utility may not operate the program until it is approved by the commissioner.
47.29A change to the program to include projects up to a nameplate capacity of 40 kilowatts or
47.30less does not require the utility to file a plan with the commissioner. Any plan approved by
47.31the commissioner of commerce must not provide an increased incentive scale over prior
47.32years unless the commissioner demonstrates that changes in the market for solar energy
47.33facilities require an increase.
48.1 new text begin (i) The utility must operate the program through December 31, 2025. Beginning on new text end
48.2 new text begin January 1, 2026, the commissioner of commerce must operate the program under this section new text end
48.3 new text begin in conformance with the orders issued by the Public Utilities Commission in Docket No. new text end
48.4 new text begin E002/M-13-1015, as applicable. new text end
48.5 new text begin (j) A payment must not be made under this section to an owner of a solar energy system new text end
48.6 new text begin who did not receive a payment under this section before January 1, 2027. new text end
48.7 new text begin Subd. 2. Establishment of account. (a) The solar energy production incentive account new text end
48.8 new text begin is established in the special revenue fund in the state treasury. Money received from the new text end
48.9 new text begin general fund must be transferred to the commissioner of commerce and credited to the new text end
48.10 new text begin account. The commissioner of commerce must manage the account. new text end
48.11 new text begin (b) Money in the account may be expended only from January 1, 2026, to December new text end
48.12 new text begin 31, 2036. Any money remaining in the account on December 31, 2036, cancels to the general new text end
48.13 new text begin fund. new text end
48.14 new text begin (c) The utility subject to this section must advise the commissioner of commerce, on a new text end
48.15 new text begin schedule determined by the commissioner of commerce, regarding: new text end
48.16 new text begin (1) the total amount required to be withdrawn from the account to pay for solar energy new text end
48.17 new text begin production incentives; and new text end
48.18 new text begin (2) the amount of payments to be made separately to each program participant due a new text end
48.19 new text begin payment under this section. new text end
48.20 new text begin (d) Beginning in fiscal year 2027, an amount sufficient is annually appropriated from new text end
48.21 new text begin the general fund to the commissioner to make the payments under paragraph (c) for projects new text end
48.22 new text begin that first received payments under this section no later than December 31, 2026. new text end
48.23 new text begin Subd. 3. Expiration. This section expires April 1, 2037. new text end
48.24 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
48.25Sec. 2. Minnesota Statutes 2024, section 116J.55, subdivision 5, is amended to read:
48.26Subd. 5. Grant awards; limitations. deleted text begin (a) deleted text end A grant awarded to an eligible community
48.27under this section must not exceed $1,000,000 in any calendar year. The commissioner may
48.28accept grant applications on an ongoing or rolling basis.
48.29 deleted text begin (b) Grants funded with revenues from the renewable development account established deleted text end
48.30 deleted text begin in section 116C.779 must be awarded to an eligible community located within the retail deleted text end
48.31 deleted text begin electric service territory of the public utility that is subject to section 116C.779 or to an deleted text end
49.1 deleted text begin eligible community in which an electric generating plant owned by that public utility is deleted text end
49.2 deleted text begin located. deleted text end
49.3 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
49.4Sec. 3. Minnesota Statutes 2024, section 216B.1645, subdivision 1, is amended to read:
49.5Subdivision 1. Commission authority. Upon the petition of a public utility, the Public
49.6Utilities Commission shall approve or disapprove power purchase contracts, investments,
49.7or expenditures entered into or made by the utility to satisfy the wind and biomass mandates
49.8contained in sections 216B.169, 216B.2423, and 216B.2424, and to satisfy the renewable
49.9energy objectives and standards set forth in section 216B.1691, including reasonable
49.10investments and expenditures made to:
49.11(1) transmit the electricity generated from sources developed under those sections that
49.12is ultimately used to provide service to the utility's retail customers, including studies
49.13necessary to identify new transmission facilities needed to transmit electricity to Minnesota
49.14retail customers from generating facilities constructed to satisfy the renewable energy
49.15objectives and standards, provided that the costs of the studies have not been recovered
49.16previously under existing tariffs and the utility has filed an application for a certificate of
49.17need or for certification as a priority project under section 216B.2425 for the new
49.18transmission facilities identified in the studies; new text begin or new text end
49.19(2) provide storage facilities for renewable energy generation facilities that contribute
49.20to the reliability, efficiency, or cost-effectiveness of the renewable facilities deleted text begin ; or deleted text end new text begin . new text end
49.21 deleted text begin (3) develop renewable energy sources from the account required in section 116C.779. deleted text end
49.22 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
49.23Sec. 4. Minnesota Statutes 2024, section 216C.377, subdivision 3, is amended to read:
49.24Subd. 3. Establishment of account. A solar on public buildings grant program account
49.25is established in the special revenue fund. Money received from the general fund deleted text begin and the deleted text end
49.26 deleted text begin renewable development account established in section 116C.779, subdivision 1, deleted text end must be
49.27transferred to the commissioner of commerce and credited to the account. Earnings, including
49.28interest, dividends, and any other earnings arising from the assets of the account, must be
49.29credited to the account. Earnings remaining in the account at the end of a fiscal year do not
49.30cancel to the general fund or renewable development account but remain in the account
49.31until expended. The commissioner must manage the account.
49.32 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
50.1Sec. 5. Minnesota Statutes 2024, section 216C.417, is amended by adding a subdivision
50.2to read:
50.3 new text begin Subd. 1a. Account established; account management; appropriation. A "Made in new text end
50.4 new text begin Minnesota" solar energy production incentive account is established as a separate account new text end
50.5 new text begin in the special revenue fund in the state treasury. Earnings, including interest, dividends, and new text end
50.6 new text begin any other earnings arising from account assets, must be credited to the account. Money new text end
50.7 new text begin remaining in the account at the end of a fiscal year cancels to the general fund. The new text end
50.8 new text begin commissioner of commerce must manage the account. new text end
50.9 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
50.10Sec. 6. Minnesota Statutes 2024, section 216C.417, subdivision 2, is amended to read:
50.11Subd. 2. Appropriation. deleted text begin (a) Unspent money remaining in the account established under deleted text end
50.12 deleted text begin Minnesota Statutes 2016, section 216C.412, on July 1, 2017, must be transferred to the deleted text end
50.13 deleted text begin renewable development account in the special revenue fund established under section deleted text end
50.14 deleted text begin 116C.779, subdivision 1. deleted text end
50.15 deleted text begin (b) deleted text end new text begin (a) new text end There is annually appropriated from the deleted text begin renewable development account in the deleted text end
50.16 deleted text begin special revenue fund established in section 116C.779 deleted text end new text begin general fund new text end to the commissioner of
50.17commerce money sufficient to make the incentive payments required under Minnesota
50.18Statutes 2016, section 216C.415. Any deleted text begin funds deleted text end new text begin money new text end appropriated under this paragraph that
50.19 deleted text begin are deleted text end new text begin is new text end unexpended at the end of a fiscal year deleted text begin cancel deleted text end new text begin cancels new text end to the deleted text begin renewable development deleted text end
50.20 deleted text begin account deleted text end new text begin general fund new text end .
50.21 deleted text begin (c) deleted text end new text begin (b) new text end Notwithstanding Minnesota Statutes 2016, section 216C.412, subdivision 1, none
50.22of this appropriation may be used for administrative costs.
50.23 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
50.24Sec. 7. new text begin DISPOSITION OF REMAINING FUNDS. new text end
50.25 new text begin Any money remaining in the renewable development account established under Minnesota new text end
50.26 new text begin Statutes, section 116C.779, as of the effective date of this act must be remitted to the utility new text end
50.27 new text begin subject to Minnesota Statutes, section 216B.1641, subdivision 1, to refund the utility's new text end
50.28 new text begin electric service customers in a manner and according to a schedule determined by the Public new text end
50.29 new text begin Utilities Commission. new text end
51.1Sec. 8. new text begin REVISOR INSTRUCTION. new text end
51.2 new text begin In each section of Minnesota Statutes referred to in column A, the revisor of statutes new text end
51.3 new text begin must delete the reference in column B and insert the reference in column C. The references new text end
51.4 new text begin in column C may be changed by the revisor of statutes to the section in Minnesota Statutes new text end
51.5 new text begin in which the bill sections are compiled. new text end
51.6 new text begin Column A Column B Column C new text end
51.7 new text begin 16B.87 116C.779 216B.1641, subdivision 1 new text end
51.8 new text begin 116C.776 116C.779 116C.778 new text end
51.10 new text begin 216B.1641 116C.779 new text end
51.9 new text begin 216B.1691, paragraph (a), clause (1) new text end
51.11 new text begin 216C.375 116C.779 216B.1641, subdivision 1 new text end
51.12 new text begin 216C.378 116C.779 216B.1641, subdivision 1 new text end
51.13 new text begin 216C.379 116C.779 216B.1641, subdivision 1 new text end
51.14 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
51.15Sec. 9. new text begin REPEALER. new text end
51.16 new text begin Minnesota Statutes 2024, sections 116C.779, subdivisions 1 and 2; 116C.7791; and new text end
51.17 new text begin 216C.41, are repealed. new text end
51.18 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end APPENDIX Repealed Minnesota Statutes: S2393-1 116C.779 FUNDING FOR RENEWABLE DEVELOPMENT. Subdivision 1. Renewable development account. (a) The renewable development account is established as a separate account in the special revenue fund in the state treasury. Appropriations and transfers to the account shall be credited to the account. Earnings, such as interest, dividends, and any other earnings arising from assets of the account, shall be credited to the account. Funds remaining in the account at the end of a fiscal year are not canceled to the general fund but remain in the account until expended. The account shall be administered by the commissioner of management and budget as provided under this section. (b) On July 1, 2017, the public utility that owns the Prairie Island nuclear generating plant must transfer all funds in the renewable development account previously established under this subdivision and managed by the public utility to the renewable development account established in paragraph (a). Funds awarded to grantees in previous grant cycles that have not yet been expended and unencumbered funds required to be paid in calendar year 2017 under paragraphs (f) and (g), and sections 116C.7792 and 216C.41, are not subject to transfer under this paragraph. (c) Except as provided in subdivision 1a, beginning January 15, 2018, and continuing each January 15 thereafter, the public utility that owns the Prairie Island nuclear generating plant must transfer to the renewable development account $500,000 each year for each dry cask containing spent fuel that is located at the Prairie Island power plant for each year the plant is in operation, and $7,500,000 each year the plant is not in operation if ordered by the commission pursuant to paragraph (i). The fund transfer must be made if nuclear waste is stored in a dry cask at the independent spent-fuel storage facility at Prairie Island for any part of a year. The total amount transferred annually under this paragraph must be reduced by $3,750,000. (d) Except as provided in subdivision 1a, beginning January 15, 2018, and continuing each January 15 thereafter, the public utility that owns the Monticello nuclear generating plant must transfer to the renewable development account $350,000 each year for each dry cask containing spent fuel that is located at the Monticello nuclear power plant for each year the plant is in operation, and $5,250,000 each year the plant is not in operation if ordered by the commission pursuant to paragraph (i). The fund transfer must be made if nuclear waste is stored in a dry cask at the independent spent-fuel storage facility at Monticello for any part of a year. (e) Each year, the public utility shall withhold from the funds transferred to the renewable development account under paragraphs (c) and (d) the amount necessary to pay its obligations under paragraphs (f) and (g), and sections 116C.7792 and 216C.41, for that calendar year. (f) If the commission approves a new or amended power purchase agreement, the termination of a power purchase agreement, or the purchase and closure of a facility under section 216B.2424, subdivision 9, with an entity that uses poultry litter to generate electricity, the public utility subject to this section shall enter into a contract with the city in which the poultry litter plant is located to provide grants to the city for the purposes of economic development on the following schedule: $4,000,000 in fiscal year 2018; $6,500,000 each fiscal year in 2019 and 2020; and $3,000,000 in fiscal year 2021. The grants shall be paid by the public utility from funds withheld from the transfer to the renewable development account, as provided in paragraphs (b) and (e). (g) If the commission approves a new or amended power purchase agreement, or the termination of a power purchase agreement under section 216B.2424, subdivision 9, with an entity owned or controlled, directly or indirectly, by two municipal utilities located north of Constitutional Route No. 8, that was previously used to meet the biomass mandate in section 216B.2424, the public utility that owns a nuclear generating plant shall enter into a grant contract with such entity to provide $6,800,000 per year for five years, commencing 30 days after the commission approves the new or amended power purchase agreement, or the termination of the power purchase agreement, and on each June 1 thereafter through 2021, to assist the transition required by the new, amended, or terminated power purchase agreement. The grant shall be paid by the public utility from funds withheld from the transfer to the renewable development account as provided in paragraphs (b) and (e). (h) The collective amount paid under the grant contracts awarded under paragraphs (f) and (g) is limited to the amount deposited into the renewable development account, and its predecessor, the renewable development account, established under this section, that was not required to be deposited into the account under Laws 1994, chapter 641, article 1, section 10. (i) After discontinuation of operation of the Prairie Island nuclear plant or the Monticello nuclear plant and each year spent nuclear fuel is stored in dry cask at the discontinued facility, the commission shall require the public utility to pay $7,500,000 for the discontinued Prairie Island facility and $5,250,000 for the discontinued Monticello facility for any year in which the commission finds, by the preponderance of the evidence, that the public utility did not make a good faith effort to remove the spent nuclear fuel stored at the facility to a permanent or interim storage site out of the state. This determination shall be made at least every two years. (j) Funds in the account may be expended only for any of the following purposes: (1) to stimulate research and development of renewable electric energy technologies; (2) to encourage grid modernization, including, but not limited to, projects that implement electricity storage, load control, and smart meter technology; and (3) to stimulate other innovative energy projects that reduce demand and increase system efficiency and flexibility. Expenditures from the fund must benefit Minnesota ratepayers receiving electric service from the utility that owns a nuclear-powered electric generating plant in this state or the Prairie Island Indian community or its members. The utility that owns a nuclear generating plant is eligible to apply for grants under this subdivision. (k) For the purposes of paragraph (j), the following terms have the meanings given: (1) "renewable" has the meaning given in section 216B.2422, subdivision 1, paragraph (c), clauses (1), (2), (4), and (5); and (2) "grid modernization" means: (i) enhancing the reliability of the electrical grid; (ii) improving the security of the electrical grid against cyberthreats and physical threats; and (iii) increasing energy conservation opportunities by facilitating communication between the utility and its customers through the use of two-way meters, control technologies, energy storage and microgrids, technologies to enable demand response, and other innovative technologies. (l) A renewable development account advisory group that includes, among others, representatives of the public utility and its ratepayers, and includes at least one representative of the Prairie Island Indian community appointed by that community's tribal council, shall develop recommendations on account expenditures. The advisory group must design a request for proposal and evaluate projects submitted in response to a request for proposals. The advisory group must utilize an independent third-party expert to evaluate proposals submitted in response to a request for proposal, including all proposals made by the public utility. A request for proposal for research and development under paragraph (j), clause (1), may be limited to or include a request to higher education institutions located in Minnesota for multiple projects authorized under paragraph (j), clause (1). The request for multiple projects may include a provision that exempts the projects from the third-party expert review and instead provides for project evaluation and selection by a merit peer review grant system. In the process of determining request for proposal scope and subject and in evaluating responses to request for proposals, the advisory group must strongly consider, where reasonable: (1) potential benefit to Minnesota citizens and businesses and the utility's ratepayers; and (2) the proposer's commitment to increasing the diversity of the proposer's workforce and vendors. (m) The advisory group shall submit funding recommendations to the public utility, which has full and sole authority to determine which expenditures shall be submitted by the advisory group to the legislature. The commission may approve proposed expenditures, may disapprove proposed expenditures that it finds not to be in compliance with this subdivision or otherwise not in the public interest, and may, if agreed to by the public utility, modify proposed expenditures. The commission shall, by order, submit its funding recommendations to the legislature as provided under paragraph (n). (n) The commission shall present its recommended appropriations from the account to the senate and house of representatives committees with jurisdiction over energy policy and finance annually by February 15. Expenditures from the account must be appropriated by law. In enacting appropriations from the account, the legislature: (1) may approve or disapprove, but may not modify, the amount of an appropriation for a project recommended by the commission; and (2) may not appropriate money for a project the commission has not recommended funding. (o) A request for proposal for renewable energy generation projects must, when feasible and reasonable, give preference to projects that are most cost-effective for a particular energy source. (p) The advisory group must annually, by February 15, report to the chairs and ranking minority members of the legislative committees with jurisdiction over energy policy on projects funded by the account for the prior year and all previous years. The report must, to the extent possible and reasonable, itemize the actual and projected financial benefit to the public utility's ratepayers of each project. (q) A project receiving funds from the account must produce a written final report that includes sufficient detail for technical readers and a clearly written summary for nontechnical readers. The report must include an evaluation of the project's financial, environmental, and other benefits to the state and the public utility's ratepayers. A project receiving funds from the account must submit a report that meets the requirements of section 216C.51, subdivisions 3 and 4, each year the project funded by the account is in progress. (r) Final reports, any mid-project status reports, and renewable development account financial reports must be posted online on a public website designated by the commissioner of commerce. (s) All final reports must acknowledge that the project was made possible in whole or part by the Minnesota renewable development account, noting that the account is financed by the public utility's ratepayers. (t) Of the amount in the renewable development account, priority must be given to making the payments required under section 216C.417. (u) Construction projects receiving funds from this account are subject to the requirement to pay the prevailing wage rate, as defined in section 177.42 and the requirements and enforcement provisions in sections 177.27, 177.30, 177.32, 177.41 to 177.435, and 177.45. Subd. 2. Renewable energy production incentive. (a) Until January 1, 2021, $10,900,000 annually must be allocated from available funds in the account to fund renewable energy production incentives. $9,400,000 of this annual amount is for incentives for electricity generated by wind energy conversion systems that are eligible for the incentives under section 216C.41 or Laws 2005, chapter 40. (b) The balance of this amount, up to $1,500,000 annually, may be used for production incentives for on-farm biogas recovery facilities and hydroelectric facilities that are eligible for the incentive under section 216C.41 or for production incentives for other renewables, to be provided in the same manner as under section 216C.41. (c) Any portion of the $10,900,000 not expended in any calendar year for the incentive is available for other spending purposes under subdivision 1. This subdivision does not create an obligation to contribute funds to the account. (d) The Department of Commerce shall determine eligibility of projects under section 216C.41 for the purposes of this subdivision. At least quarterly, the Department of Commerce shall notify the public utility of the name and address of each eligible project owner and the amount due to each project under section 216C.41. The public utility shall make payments within 15 working days after receipt of notification of payments due. 116C.7791 REBATES FOR SOLAR PHOTOVOLTAIC MODULES. Subdivision 1. Definitions. For the purpose of this section, the following terms have the meanings given. (a) "Installation" means an array of solar photovoltaic modules attached to a building that will use the electricity generated by the solar photovoltaic modules or placed on a facility or property proximate to that building. (b) "Manufactured" means: (1) the material production of solar photovoltaic modules, including the tabbing, stringing, and lamination processes; or (2) the production of interconnections of low-voltage photoactive elements that produce the final useful photovoltaic output by a manufacturer operating in this state on May 18, 2010. (c) "Qualified owner" means an owner of a qualified property, but does not include an entity engaged in the business of generating or selling electricity at retail, or an unregulated subsidiary of such an entity. (d) "Qualified property" means a residence, multifamily residence, business, or publicly owned building located in the assigned service area of the utility subject to section 116C.779. (e) "Solar photovoltaic module" means the smallest, nondivisible, self-contained physical structure housing interconnected photovoltaic cells and providing a single direct current of electrical output. Subd. 2. Establishment. The utility subject to section 116C.779 shall establish a program to provide rebates to an owner of a qualified property for installing solar photovoltaic modules manufactured in Minnesota after December 31, 2009. Any solar photovoltaic modules installed under this program and any expenses incurred by the utility operating the program shall be treated the same as solar installations and related expenses under section 216B.241. Subd. 3. Rebate eligibility. (a) To be eligible for a rebate under this section, a solar photovoltaic module: (1) must be manufactured in Minnesota; (2) must be installed on a qualified property as part of a system whose generating capacity does not exceed 40 kilowatts; (3) must be certified by Underwriters Laboratory, must have received the ETL listed mark from Intertek, or must have an equivalent certification from an independent testing agency; (4) may or may not be connected to a utility grid; (5) must be installed, or reviewed and approved, by a person certified as a solar photovoltaic installer by the North American Board of Certified Energy Practitioners; and (6) may not be used to sell, transmit, or distribute the electrical energy at retail, nor to provide end-use electricity to an offsite facility of the electrical energy generator. On-site generation is allowed to the extent provided for in section 216B.1611. (b) To be eligible for a rebate under this section, an applicant must have applied for and been awarded a rebate or other form of financial assistance available exclusively to owners of properties on which solar photovoltaic modules are installed that is offered by: (1) the utility serving the property on which the solar photovoltaic modules are to be installed; or (2) this state, under an authority other than this section. (c) An applicant who is otherwise ineligible for a rebate under paragraph (b) is eligible if the applicant's failure to secure a rebate or other form of financial assistance is due solely to a lack of available funds on the part of a utility or this state. Subd. 4. Rebate amount and payment. (a) The amount of a rebate under this section is the difference between the sum of all rebates described in subdivision 3, paragraph (b), awarded to the applicant and $5 per watt of installed generating capacity. (b) Notwithstanding paragraph (a), the amount of all rebates or other forms of financial assistance awarded to an applicant by a utility and the state, including any rebate paid under this section, net of applicable federal income taxes applied at the highest applicable income tax rates, must not exceed 60 percent of the total installed cost of the solar photovoltaic modules. (c) Rebates must be awarded to eligible applicants beginning July 1, 2010. (d) The rebate must be paid out proportionately in five consecutive annual installments. Subd. 5. Rebate program funding. (a) The following amounts must be allocated from the renewable development account established in section 116C.779 to a separate account for the purpose of providing the rebates for solar photovoltaic modules specified in this section: (1) $2,000,000 in fiscal year 2011; (2) $4,000,000 in fiscal year 2012; (3) $5,000,000 in fiscal year 2013; (4) $5,000,000 in fiscal year 2014; and (5) $5,000,000 in fiscal year 2015. (b) If, by the end of fiscal year 2015, insufficient qualified owners have applied for and met the requirements for rebates under this section to exhaust the funds available, any remaining balance shall be returned to the account established under section 116C.779. 216C.41 RENEWABLE ENERGY PRODUCTION INCENTIVE. Subdivision 1. Definitions. (a) The definitions in this subdivision apply to this section. (b) "Qualified hydroelectric facility" means a hydroelectric generating facility in this state that: (1) is located at the site of a dam, if the dam was in existence as of March 31, 1994; and (2) begins generating electricity after July 1, 1994, or generates electricity after substantial refurbishing of a facility that begins after July 1, 2001. (c) "Qualified wind energy conversion facility" means a wind energy conversion system in this state that: (1) produces two megawatts or less of electricity as measured by nameplate rating and begins generating electricity after December 31, 1996, and before July 1, 1999; (2) begins generating electricity after June 30, 1999, produces two megawatts or less of electricity as measured by nameplate rating, and is: (i) owned by a resident of Minnesota or an entity that is organized under the laws of this state, is not prohibited from owning agricultural land under section 500.24, and owns the land where the facility is sited; (ii) owned by a Minnesota small business as defined in section 645.445; (iii) owned by a Minnesota nonprofit organization; (iv) owned by a tribal council if the facility is located within the boundaries of the reservation; (v) owned by a Minnesota municipal utility or a Minnesota cooperative electric association; or (vi) owned by a Minnesota political subdivision or local government, including, but not limited to, a county, statutory or home rule charter city, town, school district, or any other local or regional governmental organization such as a board, commission, or association; or (3) begins generating electricity after June 30, 1999, produces seven megawatts or less of electricity as measured by nameplate rating, and: (i) is owned by a cooperative organized under chapter 308A other than a Minnesota cooperative electric association; and (ii) all shares and membership in the cooperative are held by an entity that is not prohibited from owning agricultural land under section 500.24. (d) "Qualified on-farm biogas recovery facility" means an anaerobic digester system that: (1) is located at the site of an agricultural operation; and (2) is owned by an entity that is not prohibited from owning agricultural land under section 500.24 and that owns or rents the land where the facility is located. (e) "Anaerobic digester system" means a system of components that processes animal waste based on the absence of oxygen and produces gas used to generate electricity. Subd. 2. Incentive payment; appropriation. (a) Incentive payments must be made according to this section to (1) a qualified on-farm biogas recovery facility, (2) the owner or operator of a qualified hydropower facility or qualified wind energy conversion facility for electric energy generated and sold by the facility, (3) a publicly owned hydropower facility for electric energy that is generated by the facility and used by the owner of the facility outside the facility, or (4) the owner of a publicly owned dam that is in need of substantial repair, for electric energy that is generated by a hydropower facility at the dam and the annual incentive payments will be used to fund the structural repairs and replacement of structural components of the dam, or to retire debt incurred to fund those repairs. (b) Payment may only be made upon receipt by the commissioner of commerce of an incentive payment application that establishes that the applicant is eligible to receive an incentive payment and that satisfies other requirements the commissioner deems necessary. The application must be in a form and submitted at a time the commissioner establishes. (c) There is annually appropriated from the renewable development account under section 116C.779 to the commissioner of commerce sums sufficient to make the payments required under this section, in addition to the amounts funded by the renewable development account as specified in subdivision 5a. Subd. 3. Eligibility window. Payments may be made under this section only for: (a) electricity generated from: (1) a qualified hydroelectric facility that is operational and generating electricity before December 31, 2011; (2) a qualified wind energy conversion facility that is operational and generating electricity before January 1, 2008; or (3) a qualified on-farm biogas recovery facility from July 1, 2001, through December 31, 2017; and (b) gas generated from a qualified on-farm biogas recovery facility from July 1, 2007, through December 31, 2017. Subd. 4. Payment period. (a) A facility may receive payments under this section for a ten-year period. No payment under this section may be made for electricity generated: (1) by a qualified hydroelectric facility after December 31, 2021; (2) by a qualified wind energy conversion facility after December 31, 2018; or (3) by a qualified on-farm biogas recovery facility after December 31, 2017. (b) The payment period begins and runs consecutively from the date the facility begins generating electricity or, in the case of refurbishment of a hydropower facility, after substantial repairs to the hydropower facility dam funded by the incentive payments are initiated. Subd. 5. Amount of payment; wind facilities limit. (a) An incentive payment is based on the number of kilowatt-hours of electricity generated. The amount of the payment is: (1) for a facility described under subdivision 2, paragraph (a), clause (4), 1.0 cent per kilowatt-hour; and (2) for all other facilities, 1.5 cents per kilowatt-hour. For electricity generated by qualified wind energy conversion facilities, the incentive payment under this section is limited to no more than 200 megawatts of nameplate capacity. (b) For wind energy conversion systems installed and contracted for after January 1, 2002, the total size of a wind energy conversion system under this section must be determined according to this paragraph. Unless the systems are interconnected with different distribution systems, the nameplate capacity of one wind energy conversion system must be combined with the nameplate capacity of any other wind energy conversion system that is: (1) located within five miles of the wind energy conversion system; (2) constructed within the same calendar year as the wind energy conversion system; and (3) under common ownership. In the case of a dispute, the commissioner of commerce shall determine the total size of the system, and shall draw all reasonable inferences in favor of combining the systems. (c) In making a determination under paragraph (b), the commissioner of commerce may determine that two wind energy conversion systems are under common ownership when the underlying ownership structure contains similar persons or entities, even if the ownership shares differ between the two systems. Wind energy conversion systems are not under common ownership solely because the same person or entity provided equity financing for the systems. Subd. 5a. Renewable development account. The Department of Commerce shall authorize payment of the renewable energy production incentive to wind energy conversion systems that are eligible under this section or Laws 2005, chapter 40, to on-farm biogas recovery facilities, and to hydroelectric facilities. Payment of the incentive shall be made from the renewable energy development account as provided under section 116C.779, subdivision 2. Subd. 6. Ownership; financing; cure. (a) For the purposes of subdivision 1, paragraph (c), clause (2), a wind energy conversion facility qualifies if it is owned at least 51 percent by one or more of any combination of the entities listed in that clause. (b) A subsequent owner of a qualified facility may continue to receive the incentive payment for the duration of the original payment period if the subsequent owner qualifies for the incentive under subdivision 1. (c) Nothing in this section may be construed to deny incentive payment to an otherwise qualified facility that has obtained debt or equity financing for construction or operation as long as the ownership requirements of subdivision 1 and this subdivision are met. If, during the incentive payment period for a qualified facility, the owner of the facility is in default of a lending agreement and the lender takes possession of and operates the facility and makes reasonable efforts to transfer ownership of the facility to an entity other than the lender, the lender may continue to receive the incentive payment for electricity generated and sold by the facility for a period not to exceed 18 months. A lender who takes possession of a facility shall notify the commissioner immediately on taking possession and, at least quarterly, document efforts to transfer ownership of the facility. (d) If, during the incentive payment period, a qualified facility loses the right to receive the incentive because of changes in ownership, the facility may regain the right to receive the incentive upon cure of the ownership structure that resulted in the loss of eligibility and may reapply for the incentive, but in no case may the payment period be extended beyond the original ten-year limit. (e) A subsequent or requalifying owner under paragraph (b) or (d) retains the facility's original priority order for incentive payments as long as the ownership structure requalifies within two years from the date the facility became unqualified or two years from the date a lender takes possession. Subd. 7. Eligibility process. (a) A qualifying project is eligible for the incentive on the date the commissioner receives: (1) an application for payment of the incentive; (2) one of the following: (i) a copy of a signed power purchase agreement; (ii) a copy of a binding agreement other than a power purchase agreement to sell electricity generated by the project to a third person; or (iii) if the project developer or owner will sell electricity to its own members or customers, a copy of the purchase order for equipment to construct the project with a delivery date and a copy of a signed receipt for a nonrefundable deposit; and (3) any other information the commissioner deems necessary to determine whether the proposed project qualifies for the incentive under this section. (b) The commissioner shall determine whether a project qualifies for the incentive and respond in writing to the applicant approving or denying the application within 15 working days of receipt of the information required in paragraph (a). A project that is not operational within 18 months of receipt of a letter of approval is no longer approved for the incentive. The commissioner shall notify an applicant of potential loss of approval not less than 60 days prior to the end of the 18-month period. Eligibility for a project that loses approval may be reestablished as of the date the commissioner receives a new completed application.
Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.
Progress through the legislative process
In Other Chamber