1.1A bill for an act
1.2relating to energy; establishing the A+ Energy Act; amending Minnesota Statutes
1.32024, sections 216B.01; 216B.1691, subdivisions 1, 2e; 216B.243, subdivisions
1.43b, 8.
1.5BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.6Section 1. new text begin SHORT TITLE. new text end
1.7 new text begin This act may be cited as the "A+ Energy Act." new text end
1.8 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
1.9Sec. 2. Minnesota Statutes 2024, section 216B.01, is amended to read:
1.10216B.01 LEGISLATIVE FINDINGS.
1.11 new text begin It is the policy of this state to preserve a safe, reliable, and affordable energy system that new text end
1.12 new text begin facilitates the use of all available energy options. new text end It is hereby declared to be in the public
1.13interest that public utilities be regulated as hereinafter provided in order to provide the retail
1.14consumers of natural gas and electric service in this state with adequate and reliable services
1.15at reasonable rates, consistent with the financial and economic requirements of public utilities
1.16and their need to construct facilities to provide such services or to otherwise obtain energy
1.17supplies, to avoid unnecessary duplication of facilities which increase the cost of service
1.18to the consumer and to minimize disputes between public utilities which may result in
1.19inconvenience or diminish efficiency in service to the consumers. Because municipal utilities
1.20are presently effectively regulated by the residents of the municipalities which own and
1.21operate them, and cooperative electric associations are presently effectively regulated and
1.22controlled by the membership under the provisions of chapter 308A, it is deemed unnecessary
2.1to subject such utilities to regulation under this chapter except as specifically provided
2.2herein.
2.3Sec. 3. Minnesota Statutes 2024, section 216B.1691, subdivision 1, is amended to read:
2.4Subdivision 1. Definitions. (a) For purposes of this section, the following terms have
2.5the meaning given them.
2.6(b) "Carbon-free" means a technology that generates electricity without emitting carbon
2.7dioxide.
2.8(c) Unless otherwise specified in law, "eligible energy technology" means an energy
2.9technology that generates electricity from the following renewable energy sources:
2.10(1) solar;
2.11(2) wind;
2.12(3) hydroelectric deleted text begin with a capacity of: (i) less than 100 megawatts; or (ii) 100 megawatts deleted text end
2.13 deleted text begin or more, provided that the facility is in operation as of February 8, 2023 deleted text end ;
2.14(4) hydrogen generated from the resources listed in this paragraph; deleted text begin or deleted text end
2.15(5) biomass, which includes, without limitation, landfill gas; an anaerobic digester
2.16system; the predominantly organic components of wastewater effluent, sludge, or related
2.17by-products from publicly owned treatment works, but not including incineration of
2.18wastewater sludge to produce electricity; and, except as provided in subdivision 1a, an
2.19energy recovery facility used to capture the heat value of mixed municipal solid waste or
2.20refuse-derived fuel from mixed municipal solid waste as a primary fuel deleted text begin . deleted text end new text begin ; or new text end
2.21 new text begin (6) nuclear. new text end
2.22(d) "Electric utility" means: (1) a public utility providing electric service; (2) a generation
2.23and transmission cooperative electric association; (3) a municipal power agency; (4) a power
2.24district; or (5) a cooperative electric association or municipal utility providing electric service
2.25that is not a member of an entity in clauses (2) to (4).
2.26(e) "Environmental justice area" means an area in Minnesota that, based on the most
2.27recent data published by the United States Census Bureau, meets one or more of the following
2.28criteria:
2.29(1) 40 percent or more of the area's total population is nonwhite;
2.30(2) 35 percent or more of households in the area have an income that is at or below 200
2.31percent of the federal poverty level;
3.1(3) 40 percent or more of the area's residents over the age of five have limited English
3.2proficiency; or
3.3(4) the area is located within Indian country, as defined in United State Code, title 18,
3.4section 1151.
3.5(f) "Total retail electric sales" means the kilowatt-hours of electricity sold in a year by
3.6an electric utility to retail customers of the electric utility or to a distribution utility for
3.7distribution to the retail customers of the distribution utility.
3.8 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
3.9Sec. 4. Minnesota Statutes 2024, section 216B.1691, subdivision 2e, is amended to read:
3.10Subd. 2e. Rate impact of standard compliance; report. new text begin (a) new text end Each electric utility must
3.11submit to the commission and the legislative committees with primary jurisdiction over
3.12energy policy a report containing an estimation of the rate impact of activities of the electric
3.13utility necessary to comply with this section. In consultation with the Department of
3.14Commerce, the commission shall determine a uniform reporting system to ensure that
3.15individual utility reports are consistent and comparable, and shall, by order, require each
3.16electric utility subject to this section to use that reporting system. The rate impact estimate
3.17must be for wholesale rates and, if the electric utility makes retail sales, the estimate shall
3.18also be for the impact on the electric utility's retail rates. Those activities include, without
3.19limitation, energy purchases, generation facility acquisition and construction, and
3.20transmission improvements. A report must be updated and submitted as part of each
3.21integrated resource plan or plan modification filed by the electric utility under section
3.22216B.2422. The reporting obligation of an electric utility under this subdivision expires
3.23December 31, 2040.
3.24 new text begin (b) A report submitted under this subdivision must include an explanation detailing the new text end
3.25 new text begin electric utility's efforts to reduce carbon dioxide emissions and increase the use of renewable new text end
3.26 new text begin energy in the electric utility's operations in a manner that does not adversely affect customer new text end
3.27 new text begin costs or the reliability of electric service to Minnesotans. new text end
3.28 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
3.29Sec. 5. Minnesota Statutes 2024, section 216B.243, subdivision 3b, is amended to read:
3.30Subd. 3b. Nuclear power plant; deleted text begin new construction prohibited; deleted text end relicensing. deleted text begin (a) The deleted text end
3.31 deleted text begin commission may not issue a certificate of need for the construction of a new nuclear-powered deleted text end
3.32 deleted text begin electric generating plant. deleted text end
4.1 deleted text begin (b) deleted text end Any certificate of need for additional storage of spent nuclear fuel for a facility
4.2seeking a license extension shall address the impacts of continued operations over the period
4.3for which approval is sought.
4.4Sec. 6. Minnesota Statutes 2024, section 216B.243, subdivision 8, is amended to read:
4.5Subd. 8. Exemptions. (a) This section does not apply to:
4.6(1) cogeneration or small power production facilities as defined in the Federal Power
4.7Act, United States Code, title 16, section 796, paragraph (17), subparagraph (A), and
4.8paragraph (18), subparagraph (A), and having a combined capacity at a single site of less
4.9than 80,000 kilowatts; plants or facilities for the production of ethanol or fuel alcohol; or
4.10any case where the commission has determined after being advised by the attorney general
4.11that its application has been preempted by federal law;
4.12(2) a high-voltage transmission line proposed primarily to distribute electricity to serve
4.13the demand of a single customer at a single location, unless the applicant opts to request
4.14that the commission determine need under this section or section 216B.2425;
4.15(3) the upgrade to a higher voltage of an existing transmission line that serves the demand
4.16of a single customer that primarily uses existing rights-of-way, unless the applicant opts to
4.17request that the commission determine need under this section or section 216B.2425;
4.18(4) a high-voltage transmission line of one mile or less required to connect a new or
4.19upgraded substation to an existing, new, or upgraded high-voltage transmission line;
4.20(5) conversion of the fuel source of an existing electric generating plant to using natural
4.21gas;
4.22(6) the modification of an existing electric generating plant to increase efficiency, as
4.23long as the capacity of the plant is not increased more than ten percent or more than 100
4.24megawatts, whichever is greater;
4.25(7) a large wind energy conversion system, as defined in section 216I.02, subdivision
4.2612, or a solar energy generating system, as defined in section 216I.02, subdivision 18, for
4.27which a site permit application is submitted by an independent power producer under chapter
4.28216I;
4.29(8) a large wind energy conversion system, as defined in section 216I.02, subdivision
4.3012, or a solar energy generating system, as defined in section 216I.02, subdivision 18,
4.31engaging in a repowering project that:
5.1(i) will not result in the system exceeding the nameplate capacity under its most recent
5.2interconnection agreement; or
5.3(ii) will result in the system exceeding the nameplate capacity under its most recent
5.4interconnection agreement, provided that the Midcontinent Independent System Operator
5.5has provided a signed generator interconnection agreement that reflects the expected net
5.6power increase;
5.7(9) energy storage systems, as defined in section 216I.02, subdivision 6;
5.8(10) transmission lines that directly interconnect large wind energy conversion systems,
5.9solar energy generating systems, or energy storage systems to the transmission system; deleted text begin or deleted text end
5.10(11) relocation of an existing high voltage transmission line to new right-of-way, provided
5.11that any new structures that are installed are not designed for and capable of operation at
5.12higher voltage deleted text begin . deleted text end new text begin ; new text end
5.13 new text begin (12) a nuclear-powered electric generating plant; new text end
5.14 new text begin (13) a hydroelectric generating facility; or new text end
5.15 new text begin (14) a biomass electric generating facility. new text end
5.16(b) For the purpose of this subdivision, "repowering project" means:
5.17(1) modifying a large wind energy conversion system or a solar energy generating system
5.18that is a large energy facility to increase its efficiency without increasing its nameplate
5.19capacity;
5.20(2) replacing turbines in a large wind energy conversion system without increasing the
5.21nameplate capacity of the system; or
5.22(3) increasing the nameplate capacity of a large wind energy conversion system.
5.23 new text begin (c) The exemptions under paragraph (a), clauses (12) to (14), do not apply if the new text end
5.24 new text begin commission determines that the exemption is not in the public interest. new text end
5.25 new text begin EFFECTIVE DATE. This section is effective the day following final enactment and new text end
5.26 new text begin applies to a large wind energy conversion system, a solar energy generating system, a new text end
5.27 new text begin nuclear-powered electric generating plant, a hydroelectric generating facility, or a biomass new text end
5.28 new text begin electric generating facility whose owner has filed an application for a certificate of need new text end
5.29 new text begin with the Public Utilities Commission on or after that date. new text end
Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.