SF1382

Certain determinations before conducting environmental review and issuing permits relating to proposed non ferrous sulfide ore projects requirement
Legislative Session 94 (2025-2026)

Related bill: HF954

Bill text

Introduction

ReadChanges
PDF
(underlined = new law, struck through = current law the bill removes)
1.1A bill for an act
1.2relating to natural resources; requiring certain determinations before conducting
1.3environmental review and issuing permits relating to proposed nonferrous sulfide
1.4ore projects; amending Minnesota Statutes 2024, sections 93.001; 115.03,
1.5subdivision 1; proposing coding for new law in Minnesota Statutes, chapter 93.
1.6BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.7Section 1. Minnesota Statutes 2024, section 93.001, is amended to read:
1.893.001 POLICY FOR MINERAL DEVELOPMENT.
1.9It is the policy of the state to provide for the diversification of the state's mineral economy
1.10through long-term support of mineral exploration, evaluation, environmental research,
1.11development, production, and commercialization new text begin , consistent with the state policy to protect new text end
1.12 new text begin human health, clean air, clean water, and other natural resources of the state new text end .
1.13Sec. 2. new text begin [93.2501] MORATORIUM ON CONDUCTING ENVIRONMENTAL new text end
1.14 new text begin REVIEW AND ISSUING PERMITS RELATING TO PROPOSED NONFERROUS new text end
1.15 new text begin SULFIDE ORE PROJECTS. new text end
1.16 new text begin Subdivision 1. Scope. This section applies to conducting environmental review and new text end
1.17 new text begin issuing permits relating to proposed nonferrous sulfide ore projects under this chapter or new text end
1.18 new text begin other chapters administered by the commissioner of natural resources or the commissioner new text end
1.19 new text begin of the Minnesota Pollution Control Agency. This section does not apply to permits for or new text end
1.20 new text begin conducting environmental review relating to mining iron ore. new text end
1.21 new text begin Subd. 2. Definitions. (a) The terms used in this section have the meanings given. new text end
2.1 new text begin (b) "Nonferrous sulfide ore" means a metallic mineral from which iron is not the new text end
2.2 new text begin predominant metal extracted, including but not limited to copper, nickel, platinum, palladium, new text end
2.3 new text begin gold, silver, cobalt, chromium, zinc, lead, bismuth, tin, tungsten, tantalum, or niobium. new text end
2.4 new text begin (c) "Similar environment" means a location: new text end
2.5 new text begin (1) with similar average annual precipitation and average monthly temperatures; and new text end
2.6 new text begin (2) in which the proximity of surface water and groundwater to mining operations is new text end
2.7 new text begin similar to the proximity of surface water and groundwater to the Minnesota site or sites new text end
2.8 new text begin where the proposed nonferrous sulfide ore project would be sited. new text end
2.9 new text begin Subd. 3. Moratorium. (a) The commissioner and the commissioner of the Minnesota new text end
2.10 new text begin Pollution Control Agency must not conduct environmental review and must not issue permits new text end
2.11 new text begin relating to proposed nonferrous sulfide ore projects unless the commissioner and the new text end
2.12 new text begin commissioner of the Minnesota Pollution Control Agency both determine, based on new text end
2.13 new text begin published, peer-reviewed scientific information and public records, that a mine for nonferrous new text end
2.14 new text begin sulfide ore has operated commercially for at least ten years and has been closed for at least new text end
2.15 new text begin ten years without resulting in a release of a hazardous substance, hazardous waste, or new text end
2.16 new text begin pollutant or contaminant as defined under section 115B.02. The mine must have operated new text end
2.17 new text begin in the United States in a similar environment and must have used reclamation techniques new text end
2.18 new text begin substantially similar to those proposed by the nonferrous sulfide ore project. The applicant new text end
2.19 new text begin for a proposed nonferrous sulfide ore project bears the burden of proof under this section new text end
2.20 new text begin to demonstrate each of the conditions necessary for a determination that environmental new text end
2.21 new text begin review may be conducted or a permit may be issued. new text end
2.22 new text begin (b) The commissioner and the commissioner of the Minnesota Pollution Control Agency new text end
2.23 new text begin must publish notice of a proposed determination under paragraph (a) and allow public new text end
2.24 new text begin comment before making a preliminary decision to conduct environmental review or grant new text end
2.25 new text begin or deny any application for a permit relating to proposed nonferrous sulfide ore projects. If new text end
2.26 new text begin probative evidence is submitted to the commissioner or the commissioner of the Minnesota new text end
2.27 new text begin Pollution Control Agency during the public comment period that is contrary to the new text end
2.28 new text begin commissioners' proposed determination, the commissioners must order a contested case new text end
2.29 new text begin hearing under chapter 14 and must base the final decision for conducting environmental new text end
2.30 new text begin review or proceeding with the permitting process on the evidentiary record developed in new text end
2.31 new text begin the hearing. new text end
2.32 new text begin Subd. 4. Renewing and amending permits. (a) For any permit issued relating to a new text end
2.33 new text begin nonferrous sulfide ore mining project under this chapter or other chapters administered by new text end
2.34 new text begin the commissioner or the commissioner of the Minnesota Pollution Control Agency, the new text end
3.1 new text begin permittee must apply for a reissuance of the permit every ten years, or sooner if the terms new text end
3.2 new text begin of the permit include an accelerated schedule. new text end
3.3 new text begin (b) A person or entity seeking renewal, reissuance, modification, or reinstatement of or new text end
3.4 new text begin an expansion or extension of activities under a permit under this chapter or other chapters new text end
3.5 new text begin administered by the commissioner or the commissioner of the Minnesota Pollution Control new text end
3.6 new text begin Agency related to mining nonferrous sulfide ore projects must submit to the commissioner new text end
3.7 new text begin or the commissioner of the Minnesota Pollution Control Agency a new, modified, or amended new text end
3.8 new text begin application for the permit. The application is subject to subdivision 3 and is considered a new text end
3.9 new text begin substantial change to the permit for purposes of the notice requirement in section 93.481, new text end
3.10 new text begin subdivision 3, paragraph (b). new text end
3.11Sec. 3. Minnesota Statutes 2024, section 115.03, subdivision 1, is amended to read:
3.12Subdivision 1. Generally. (a) The commissioner is given and charged with the following
3.13powers and duties:
3.14(1) to administer and enforce all laws relating to the pollution of any of the waters of
3.15the state;
3.16(2) to investigate the extent, character, and effect of the pollution of the waters of this
3.17state and to gather data and information necessary or desirable in the administration or
3.18enforcement of pollution laws, and to make such classification of the waters of the state as
3.19it may deem advisable;
3.20(3) to establish and alter such reasonable pollution standards for any waters of the state
3.21in relation to the public use to which they are or may be put as it shall deem necessary for
3.22the purposes of this chapter and, with respect to the pollution of waters of the state, chapter
3.23116;
3.24(4) to encourage waste treatment, including advanced waste treatment, instead of stream
3.25low-flow augmentation for dilution purposes to control and prevent pollution;
3.26(5) to adopt, issue, reissue, modify, deny, revoke, reopen, enter into, or enforce reasonable
3.27orders, permits, variances, standards, rules, schedules of compliance, and stipulation
3.28agreements, under such conditions as it may prescribe, in order to prevent, control or abate
3.29water pollution, or for the installation or operation of disposal systems or parts thereof, or
3.30for other equipment and facilities:
3.31(i) requiring the discontinuance of the discharge of sewage, industrial waste or other
3.32wastes into any waters of the state resulting in pollution in excess of the applicable pollution
3.33standard established under this chapter;
4.1(ii) prohibiting or directing the abatement of any discharge of sewage, industrial waste,
4.2or other wastes, into any waters of the state or the deposit thereof or the discharge into any
4.3municipal disposal system where the same is likely to get into any waters of the state in
4.4violation of this chapter and, with respect to the pollution of waters of the state, chapter
4.5116, or standards or rules promulgated or permits issued pursuant thereto, and specifying
4.6the schedule of compliance within which such prohibition or abatement must be
4.7accomplished;
4.8(iii) prohibiting the storage of any liquid or solid substance or other pollutant in a manner
4.9which does not reasonably assure proper retention against entry into any waters of the state
4.10that would be likely to pollute any waters of the state;
4.11(iv) requiring the construction, installation, maintenance, and operation by any person
4.12of any disposal system or any part thereof, or other equipment and facilities, or the
4.13reconstruction, alteration, or enlargement of its existing disposal system or any part thereof,
4.14or the adoption of other remedial measures to prevent, control or abate any discharge or
4.15deposit of sewage, industrial waste or other wastes by any person;
4.16(v) establishing, and from time to time revising, standards of performance for new sources
4.17taking into consideration, among other things, classes, types, sizes, and categories of sources,
4.18processes, pollution control technology, cost of achieving such effluent reduction, and any
4.19nonwater quality environmental impact and energy requirements. Said standards of
4.20performance for new sources shall encompass those standards for the control of the discharge
4.21of pollutants which reflect the greatest degree of effluent reduction which the agency
4.22determines to be achievable through application of the best available demonstrated control
4.23technology, processes, operating methods, or other alternatives, including, where practicable,
4.24a standard permitting no discharge of pollutants. New sources shall encompass buildings,
4.25structures, facilities, or installations from which there is or may be the discharge of pollutants,
4.26the construction of which is commenced after the publication by the agency of proposed
4.27rules prescribing a standard of performance which will be applicable to such source.
4.28Notwithstanding any other provision of the law of this state, any point source the construction
4.29of which is commenced after May 20, 1973, and which is so constructed as to meet all
4.30applicable standards of performance for new sources shall, consistent with and subject to
4.31the provisions of section 306(d) of the Amendments of 1972 to the Federal Water Pollution
4.32Control Act, not be subject to any more stringent standard of performance for new sources
4.33during a ten-year period beginning on the date of completion of such construction or during
4.34the period of depreciation or amortization of such facility for the purposes of section 167
4.35or 169, or both, of the Federal Internal Revenue Code of 1954, whichever period ends first.
5.1Construction shall encompass any placement, assembly, or installation of facilities or
5.2equipment, including contractual obligations to purchase such facilities or equipment, at
5.3the premises where such equipment will be used, including preparation work at such
5.4premises;
5.5(vi) establishing and revising pretreatment standards to prevent or abate the discharge
5.6of any pollutant into any publicly owned disposal system, which pollutant interferes with,
5.7passes through, or otherwise is incompatible with such disposal system;
5.8(vii) requiring the owner or operator of any disposal system or any point source to
5.9establish and maintain such records, make such reports, install, use, and maintain such
5.10monitoring equipment or methods, including where appropriate biological monitoring
5.11methods, sample such effluents in accordance with such methods, at such locations, at such
5.12intervals, and in such a manner as the agency shall prescribe, and providing such other
5.13information as the agency may reasonably require;
5.14(viii) notwithstanding any other provision of this chapter, and with respect to the pollution
5.15of waters of the state, chapter 116, requiring the achievement of more stringent limitations
5.16than otherwise imposed by effluent limitations in order to meet any applicable water quality
5.17standard by establishing new effluent limitations, based upon section 115.01, subdivision
5.1813, clause (b), including alternative effluent control strategies for any point source or group
5.19of point sources to insure the integrity of water quality classifications, whenever the agency
5.20determines that discharges of pollutants from such point source or sources, with the
5.21application of effluent limitations required to comply with any standard of best available
5.22technology, would interfere with the attainment or maintenance of the water quality
5.23classification in a specific portion of the waters of the state. Prior to establishment of any
5.24such effluent limitation, the agency shall hold a public hearing to determine the relationship
5.25of the economic and social costs of achieving such limitation or limitations, including any
5.26economic or social dislocation in the affected community or communities, to the social and
5.27economic benefits to be obtained and to determine whether or not such effluent limitation
5.28can be implemented with available technology or other alternative control strategies. If a
5.29person affected by such limitation demonstrates at such hearing that, whether or not such
5.30technology or other alternative control strategies are available, there is no reasonable
5.31relationship between the economic and social costs and the benefits to be obtained, such
5.32limitation shall not become effective and shall be adjusted as it applies to such person;
5.33(ix) modifying, in its discretion, any requirement or limitation based upon best available
5.34technology with respect to any point source for which a permit application is filed after July
5.351, 1977, upon a showing by the owner or operator of such point source satisfactory to the
6.1agency that such modified requirements will represent the maximum use of technology
6.2within the economic capability of the owner or operator and will result in reasonable further
6.3progress toward the elimination of the discharge of pollutants;
6.4(x) requiring that applicants for wastewater discharge permits evaluate in their
6.5applications the potential reuses of the discharged wastewater; and
6.6(xi) when appropriate, requiring parties who enter into a negotiated agreement to settle
6.7an enforcement matter with the agency to reimburse the agency for oversight costs. The
6.8agency may recover oversight costs only if the agency's costs exceed $25,000. If oversight
6.9costs exceed $25,000, the agency may recover all the oversight costs incurred by the agency
6.10that are associated with implementing the negotiated agreement. Oversight costs may include
6.11but are not limited to any costs associated with inspections, sampling, monitoring, modeling,
6.12risk assessment, permit writing, engineering review, economic analysis and review, and
6.13other record or document review. Estimates of anticipated oversight costs must be disclosed
6.14in the negotiated agreement, and estimates must be periodically updated and disclosed to
6.15the parties to the negotiated agreement. The agency's legal and litigation costs are not
6.16recoverable under this clause. In addition to settlement agreements, the commissioner has
6.17discretion as to whether to apply this clause in cases when the agency is using schedules of
6.18compliance to bring a class of regulated parties into compliance;
6.19(6) to require to be submitted and to approve plans and specifications for disposal systems
6.20or point sources, or any part thereof and to inspect the construction thereof for compliance
6.21with the approved plans and specifications thereof;
6.22(7) to prescribe and alter rules, not inconsistent with law, for the conduct of the agency
6.23and other matters within the scope of the powers granted to and imposed upon it by this
6.24chapter and, with respect to pollution of waters of the state, in chapter 116, provided that
6.25every rule affecting any other department or agency of the state or any person other than a
6.26member or employee of the agency shall be filed with the secretary of state;
6.27(8) to conduct such investigations, issue such notices, public and otherwise, deleted text begin and deleted text end hold
6.28such hearings new text begin and make such determinations new text end as are necessary or which deleted text begin it deleted text end new text begin the commissioner new text end
6.29may deem advisable for the discharge of deleted text begin its deleted text end duties under this chapter new text begin and section 93.2501 new text end
6.30and, with respect to the pollution of waters of the state, under chapter 116, including, but
6.31not limited to, the issuance of permits, and to authorize any member, employee, or agent
6.32appointed by it to conduct such investigations or, issue such notices and hold such hearings;
6.33(9) for the purpose of water pollution control planning by the state and pursuant to the
6.34Federal Water Pollution Control Act, as amended, to establish and revise planning areas,
7.1adopt plans and programs and continuing planning processes, including, but not limited to,
7.2basin plans and areawide waste treatment management plans, and to provide for the
7.3implementation of any such plans by means of, including, but not limited to, standards, plan
7.4elements, procedures for revision, intergovernmental cooperation, residual treatment process
7.5waste controls, and needs inventory and ranking for construction of disposal systems;
7.6(10) to train water pollution control personnel and charge training fees as are necessary
7.7to cover the agency's costs. All such fees received must be paid into the state treasury and
7.8credited to the Pollution Control Agency training account;
7.9(11) to provide chloride reduction training and charge training fees as necessary to cover
7.10the agency's costs not to exceed $350. All training fees received must be paid into the state
7.11treasury and credited to the Pollution Control Agency training account;
7.12(12) to impose as additional conditions in permits to publicly owned disposal systems
7.13appropriate measures to insure compliance by industrial and other users with any pretreatment
7.14standard, including, but not limited to, those related to toxic pollutants, and any system of
7.15user charges ratably as is hereby required under state law or said Federal Water Pollution
7.16Control Act, as amended, or any regulations or guidelines promulgated thereunder;
7.17(13) to set a period not to exceed five years for the duration of any national pollutant
7.18discharge elimination system permit or not to exceed ten years for any permit issued as a
7.19state disposal system permit only;
7.20(14) to require each governmental subdivision identified as a permittee for a wastewater
7.21treatment works to evaluate in every odd-numbered year the condition of its existing system
7.22and identify future capital improvements that will be needed to attain or maintain compliance
7.23with a national pollutant discharge elimination system or state disposal system permit;
7.24(15) to train subsurface sewage treatment system personnel, including persons who
7.25design, construct, install, inspect, service, and operate subsurface sewage treatment systems,
7.26and charge fees as necessary to pay the agency's costs. All fees received must be paid into
7.27the state treasury and credited to the agency's training account. Money in the account is
7.28appropriated to the agency to pay expenses related to training; and
7.29(16) to encourage practices that enable the recovery and use of waste heat from
7.30wastewater treatment operations.
7.31(b) The information required in paragraph (a), clause (14), must be submitted in every
7.32odd-numbered year to the commissioner on a form provided by the commissioner. The
7.33commissioner shall provide technical assistance if requested by the governmental subdivision.
8.1(c) The powers and duties given the agency in this subdivision also apply to permits
8.2issued under chapter 114C.
8.3Sec. 4. new text begin EFFECTIVE DATE. new text end
8.4 new text begin Sections 1 to 3 are effective the day following final enactment and apply to proposed new text end
8.5 new text begin nonferrous sulfide ore projects that have begun, but not completed, environmental review new text end
8.6 new text begin on or before that date and to permits granted, renewed, modified, or amended on or after new text end
8.7 new text begin that date relating to proposed nonferrous sulfide ore projects under Minnesota Statutes, new text end
8.8 new text begin chapter 93, or other chapters administered by the commissioner of natural resources or the new text end
8.9 new text begin commissioner of the Minnesota Pollution Control Agency. new text end

Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.

Loading…