HF4829

Provisions to support deployment of energy storage added and modified, Public Utilities Commission directed to issue an order, utilities required to install an energy storage system, incentive program established, and money appropriated.
Legislative Session 94 (2025-2026)

Bill text

Introduction

ReadChanges
PDF
(underlined = new law, struck through = current law the bill removes)
1.1A bill for an act
1.2relating to energy; adding and modifying provisions to support deployment of
1.3energy storage; directing the Public Utilities Commission to issue an order;
1.4requiring utilities to install an energy storage system under certain conditions;
1.5directing public utilities to file a tariff with the Public Utilities Commission;
1.6requiring the Public Utilities Commission to order the installation of energy storage
1.7systems; requiring public utilities to file a plan to install energy storage systems;
1.8establishing an incentive program to install energy storage systems; appropriating
1.9money; amending Minnesota Statutes 2024, sections 216B.1611, by adding a
1.10subdivision; 216B.2422, subdivision 7; proposing coding for new law in Minnesota
1.11Statutes, chapters 216B; 216C.
1.12BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.13Section 1. Minnesota Statutes 2024, section 216B.1611, is amended by adding a subdivision
1.14to read:
1.15 new text begin Subd. 5. Distributed generation capacity; treatment. (a) No later than November 1, new text end
1.16 new text begin 2026, the commission must issue an order clarifying that for purposes of interconnecting new text end
1.17 new text begin an on-site customer-owned distributed generation facility, the capacity of the facility must new text end
1.18 new text begin be measured and expressed as: new text end
1.19 new text begin (1) export capacity rather than nameplate capacity; and new text end
1.20 new text begin (2) alternating current capacity. new text end
1.21 new text begin (b) For purposes of this subdivision, "export capacity" means a distributed generation new text end
1.22 new text begin facility's nameplate capacity net of any limitations on the amount of power the distributed new text end
1.23 new text begin generating facility is capable of exporting to a utility's distribution system resulting from new text end
1.24 new text begin physical equipment that is part of or connected to the generating facility, including but not new text end
1.25 new text begin limited to an inverter, relay, or energy storage system, as defined in section 216B.2422, new text end
2.1 new text begin subdivision 1, paragraph (f), as reported to the utility by the owner of the distributed new text end
2.2 new text begin generation facility. new text end
2.3 new text begin (c) The owner of a distributed generation facility interconnected to a utility's distribution new text end
2.4 new text begin system is prohibited from increasing the export capacity of the distributed generation facility new text end
2.5 new text begin beyond the level that was first interconnected to the utility's distribution system unless the new text end
2.6 new text begin utility provides written approval. The utility must respond in writing to an owner's notice new text end
2.7 new text begin of intent to increase export capacity within 90 days of the date the notice is received and new text end
2.8 new text begin may reject the request only upon determining that approving the request reduces safety or new text end
2.9 new text begin the reliability of electric service. new text end
2.10 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
2.11Sec. 2. new text begin [216B.1616] FEEDER LINE REPLACEMENT; STORAGE REQUIREMENT. new text end
2.12 new text begin (a) When replacing a feeder line with a feeder line with a higher capacity, a public utility new text end
2.13 new text begin must install at the applicable distribution substation an energy storage system that has new text end
2.14 new text begin sufficient capacity to ensure customer safety and grid reliability. new text end
2.15 new text begin (b) For purposes of this section: new text end
2.16 new text begin (1) "energy storage system" has the meaning given in section 216B.2422, subdivision new text end
2.17 new text begin 1, paragraph (f); and new text end
2.18 new text begin (2) "feeder line" means a powerline (i) that transfers power from a distribution system new text end
2.19 new text begin substation to distribution transformers, and (ii) whose current flow is the same at the sending new text end
2.20 new text begin and receiving ends of the powerline. new text end
2.21 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
2.22Sec. 3. new text begin [216B.1617] ENERGY STORAGE; DISTRIBUTED ENERGY RESOURCE new text end
2.23 new text begin TARIFF. new text end
2.24 new text begin (a) No later than September 15, 2026, the commission must initiate a docket designed new text end
2.25 new text begin to result in a commission order requiring public utilities providing electric service to file a new text end
2.26 new text begin distributed energy resource tariff with the commission, based on guidelines established in new text end
2.27 new text begin the order, to compensate customer-owners of on-site distributed energy resources for the new text end
2.28 new text begin discharge of generated or stored energy that is net input to the public utility. The tariff must new text end
2.29 new text begin account for all value provided by distributed energy resources, including but not limited to new text end
2.30 new text begin energy, capacity, ancillary services, demand response, temporal value, locational value, and new text end
2.31 new text begin environmental value. new text end
3.1 new text begin (b) Within 90 days of the date the commission issues an order under this subdivision, a new text end
3.2 new text begin public utility must file with the commission for commission approval, disapproval, or new text end
3.3 new text begin modification a tariff that is consistent with the order. new text end
3.4 new text begin (c) For purposes of this section, "distributed energy resource" means a resource, located new text end
3.5 new text begin at a public utility customer's site, with a generation capacity no greater than ten megawatts. new text end
3.6 new text begin Distributed energy resource includes an energy storage system, as defined in section new text end
3.7 new text begin 216B.2422, subdivision 1. new text end
3.8 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
3.9Sec. 4. new text begin [216B.1697] ENERGY STORAGE SYSTEMS; DEPLOYMENT TARGETS. new text end
3.10 new text begin Subdivision 1. Definition. For purposes of this section, "energy storage system" has the new text end
3.11 new text begin meaning given in section 216B.2422, subdivision 1. new text end
3.12 new text begin Subd. 2. Deployment targets. (a) A utility required to file a resource plan under section new text end
3.13 new text begin 216B.2422 must deploy energy storage systems with a capacity determined by the new text end
3.14 new text begin commission under paragraph (b). No later than December 31, 2036, the aggregate statewide new text end
3.15 new text begin capacity of energy storage systems deployed by all utilities subject to this section must be new text end
3.16 new text begin at least 3,000 megawatts. new text end
3.17 new text begin (b) No later than October 1, 2026, the commission must issue an order specifying the new text end
3.18 new text begin amount of energy storage capacity required of each utility subject to this section to meet new text end
3.19 new text begin the statewide capacity target and schedule in paragraph (a). The amount of energy storage new text end
3.20 new text begin capacity required of an individual utility must be calculated by dividing the utility's total new text end
3.21 new text begin electric retail sales to Minnesota customers in 2025 by the total electric retail sales to new text end
3.22 new text begin Minnesota customers in 2025 of all utilities subject to this section, and multiplying the new text end
3.23 new text begin resulting quotient by 3,000 megawatts. The commission may establish interim energy storage new text end
3.24 new text begin capacity targets that utilities are required to meet before the 2036 target date. new text end
3.25 new text begin Subd. 3. Application. (a) A utility must file an application with the commission before new text end
3.26 new text begin installing a proposed energy storage system. The application must contain: new text end
3.27 new text begin (1) the energy storage system's technical specifications, including but not limited to: new text end
3.28 new text begin (i) the maximum amount of electric output the energy storage system is capable of new text end
3.29 new text begin providing; new text end
3.30 new text begin (ii) the length of time the energy storage system is capable of sustaining maximum new text end
3.31 new text begin output; new text end
4.1 new text begin (iii) the location of the project within the utility's distribution system and a description new text end
4.2 new text begin of the analysis conducted to determine the location; new text end
4.3 new text begin (iv) a description of the utility's electric system needs the proposed energy storage system new text end
4.4 new text begin addresses; new text end
4.5 new text begin (v) a description of the services the energy storage system is expected to provide; and new text end
4.6 new text begin (vi) a description of the technology required to construct, operate, and maintain the new text end
4.7 new text begin energy storage system, including a data or communication system necessary to operate the new text end
4.8 new text begin energy storage system; new text end
4.9 new text begin (2) the estimated cost of the project, including: new text end
4.10 new text begin (i) capital costs; new text end
4.11 new text begin (ii) the estimated cost per unit of energy delivered by the energy storage system; and new text end
4.12 new text begin (iii) an evaluation of the energy storage system's cost-effectiveness; new text end
4.13 new text begin (3) the energy storage system's estimated benefits to the utility's electric system, including new text end
4.14 new text begin but not limited to: new text end
4.15 new text begin (i) deferred investments in generation, transmission, or distribution capacity; new text end
4.16 new text begin (ii) reduced need for electricity during times of peak demand; new text end
4.17 new text begin (iii) improved reliability of the utility's transmission or distribution system; and new text end
4.18 new text begin (iv) improved integration of the utility's renewable energy resources; new text end
4.19 new text begin (4) a description indicating how the addition of an energy storage system complements new text end
4.20 new text begin the utility's proposed actions described in the most recent integrated resource plan submitted new text end
4.21 new text begin under section 216B.2422 to meet expected demand with the least expensive combination new text end
4.22 new text begin of resources; and new text end
4.23 new text begin (5) any additional information required by the commission. new text end
4.24 new text begin (b) A utility must include in the application an evaluation of the potential to store energy new text end
4.25 new text begin throughout the utility's electric system and must identify geographic areas in the utility's new text end
4.26 new text begin service area where the deployment of energy storage systems has the greatest potential to new text end
4.27 new text begin achieve the economic benefits identified in paragraph (a), clause (3). new text end
4.28 new text begin Subd. 4. Commission review. The commission must review each proposal submitted new text end
4.29 new text begin under this section and may approve, reject, or modify the proposal. The commission must new text end
4.30 new text begin approve a proposal the commission determines: (1) is in the public interest; and (2) reasonably new text end
4.31 new text begin balances the value derived from the deployment of an energy storage system for ratepayers new text end
5.1 new text begin and the utility's operations with the cost to procure, construct, operate, and maintain the new text end
5.2 new text begin energy storage system. new text end
5.3 new text begin Subd. 5. Cost recovery. A public utility may recover from ratepayers all costs prudently new text end
5.4 new text begin incurred by the public utility to deploy an energy storage system approved by the commission new text end
5.5 new text begin under this section, net of any revenues generated by the operation of the energy storage new text end
5.6 new text begin system. new text end
5.7 new text begin Subd. 6. Reporting; compliance. The commission must establish reporting procedures new text end
5.8 new text begin for utilities that are sufficient in content and frequency to ensure the commission is informed new text end
5.9 new text begin regarding compliance with this section. new text end
5.10 new text begin Subd. 7. Commission authority; orders. The commission may issue orders and conduct new text end
5.11 new text begin proceedings necessary to implement and administer this section. new text end
5.12 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
5.13Sec. 5. Minnesota Statutes 2024, section 216B.2422, subdivision 7, is amended to read:
5.14Subd. 7. Energy storage systems assessment. (a) Each deleted text begin public deleted text end utility required to file a
5.15resource plan under subdivision 2 must new text begin incorporate in the utility's resource planning the new text end
5.16 new text begin energy storage targets the utility is required to meet under section 216B.1697 and must new text end
5.17include in the filing an assessment of energy storage systems that analyzes how the
5.18deployment of energy storage systems contributes to:
5.19(1) meeting identified generation and capacity needs; deleted text begin and deleted text end
5.20 new text begin (2) the factors identified under section 216B.1697, subdivision 3, paragraph (a), clause new text end
5.21 new text begin (3); and new text end
5.22 deleted text begin (2) deleted text end new text begin (3) new text end evaluating ancillary services.
5.23(b) The assessment must employ appropriate modeling methods to enable the analysis
5.24required in paragraph (a).
5.25Sec. 6. new text begin [216C.3771] ENERGY STORAGE INCENTIVE PROGRAM. new text end
5.26 new text begin (a) The public utility subject to section 116C.779 must develop and operate a program new text end
5.27 new text begin that provides grants to customers to reduce the cost to purchase and install an on-site energy new text end
5.28 new text begin storage system, as defined in section 216B.2422, subdivision 1, paragraph (f). No later than new text end
5.29 new text begin November 1, 2026, the public utility subject to this section must file a plan with the new text end
5.30 new text begin commissioner to operate the program. The public utility must not operate the program until new text end
6.1 new text begin the plan is approved by the commissioner. A change to an operating program must be new text end
6.2 new text begin approved by the commissioner. new text end
6.3 new text begin (b) To be eligible to receive a grant under this section, a customer's energy storage system new text end
6.4 new text begin must: new text end
6.5 new text begin (1) have a capacity no greater than 50 kilowatt-hours; and new text end
6.6 new text begin (2) be located within the electric service area of the public utility subject to this section. new text end
6.7 new text begin (c) An owner of an energy storage system is eligible to receive a grant under this section new text end
6.8 new text begin if: new text end
6.9 new text begin (1) a solar energy generating system is operating at the same site as the proposed energy new text end
6.10 new text begin storage system; or new text end
6.11 new text begin (2) the owner has filed an application with the public utility subject to this section to new text end
6.12 new text begin interconnect a solar energy generating system at the same site as the proposed energy storage new text end
6.13 new text begin system. new text end
6.14 new text begin (d) The amount of a grant awarded under this section must be based on the number of new text end
6.15 new text begin watt-hours that reflects the duration of the energy storage system at the system's rated new text end
6.16 new text begin capacity, up to a maximum of $........ new text end
6.17 new text begin (e) The commissioner must annually review and may adjust the amount of grants awarded new text end
6.18 new text begin under this section, but the commissioner must not increase the amount above the amount new text end
6.19 new text begin awarded in previous years unless the commissioner demonstrates in writing that an upward new text end
6.20 new text begin adjustment is warranted due to market conditions. new text end
6.21 new text begin (f) A customer who receives a grant under this section is eligible to receive financial new text end
6.22 new text begin assistance under programs operated by the state or the utility for the solar energy generating new text end
6.23 new text begin system operating in conjunction with the energy storage system. new text end
6.24 new text begin (g) For purposes of this section, "solar energy generating system" means a set of devices new text end
6.25 new text begin whose primary purpose is to produce electricity by means of any combination of collecting, new text end
6.26 new text begin transferring, or converting solar-generated energy. new text end
6.27 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
6.28Sec. 7. new text begin APPROPRIATION. new text end
6.29 new text begin Notwithstanding Minnesota Statutes, section 116C.779, subdivision 1, paragraph (j), new text end
6.30 new text begin $....... in fiscal year 2027 is appropriated from the renewable development account established new text end
6.31 new text begin in Minnesota Statutes, section 116C.779, to the commissioner of commerce to award grants new text end
7.1 new text begin to install energy storage systems under Minnesota Statutes, section 216C.3771, and to pay new text end
7.2 new text begin the reasonable costs incurred by the department to administer Minnesota Statutes, section new text end
7.3 new text begin 216C.3771. This appropriation is available until expended. The base for this appropriation new text end
7.4 new text begin in fiscal year 2028 is $........ new text end

Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.