HF3521
Exception to the hospital construction moratorium provided.
Legislative Session 94 (2025-2026)
Related bill: SF3587
Bill text
(underlined = new law, struck through = current law the bill removes)
Versions
Showing the most recent of the bill's 3 versions. Log in to read earlier versions and see what changed between them.
1.1A bill for an act
1.2relating to health; providing for an exception to the hospital construction
1.3moratorium; amending Minnesota Statutes 2024, section 144.551, subdivision 1.
1.4BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.5Section 1. Minnesota Statutes 2024, section 144.551, subdivision 1, is amended to read:
1.6Subdivision 1. Restricted construction or modification. (a) The following construction
1.7or modification may not be commenced:
1.8(1) any erection, building, alteration, reconstruction, modernization, improvement,
1.9extension, lease, or other acquisition by or on behalf of a hospital that increases the bed
1.10capacity of a hospital, relocates hospital beds from one physical facility, complex, or site
1.11to another, or otherwise results in an increase or redistribution of hospital beds within the
1.12state; and
1.13(2) the establishment of a new hospital.
1.14(b) This section does not apply to:
1.15(1) construction or relocation within a county by a hospital, clinic, or other health care
1.16facility that is a national referral center engaged in substantial programs of patient care,
1.17medical research, and medical education meeting state and national needs that receives more
1.18than 40 percent of its patients from outside the state of Minnesota;
1.19(2) a project for construction or modification for which a health care facility held an
1.20approved certificate of need on May 1, 1984, regardless of the date of expiration of the
1.21certificate;
2.1(3) a project for which a certificate of need was denied before July 1, 1990, if a timely
2.2appeal results in an order reversing the denial;
2.3(4) a project exempted from certificate of need requirements by Laws 1981, chapter 200,
2.4section 2;
2.5(5) a project involving consolidation of pediatric specialty hospital services within the
2.6Minneapolis-St. Paul metropolitan area that would not result in a net increase in the number
2.7of pediatric specialty hospital beds among the hospitals being consolidated;
2.8(6) a project involving the temporary relocation of pediatric-orthopedic hospital beds to
2.9an existing licensed hospital that will allow for the reconstruction of a new philanthropic,
2.10pediatric-orthopedic hospital on an existing site and that will not result in a net increase in
2.11the number of hospital beds. Upon completion of the reconstruction, the licenses of both
2.12hospitals must be reinstated at the capacity that existed on each site before the relocation;
2.13(7) the relocation or redistribution of hospital beds within a hospital building or
2.14identifiable complex of buildings provided the relocation or redistribution does not result
2.15in: (i) an increase in the overall bed capacity at that site; (ii) relocation of hospital beds from
2.16one physical site or complex to another; or (iii) redistribution of hospital beds within the
2.17state or a region of the state;
2.18(8) relocation or redistribution of hospital beds within a hospital corporate system that
2.19involves the transfer of beds from a closed facility site or complex to an existing site or
2.20complex provided that: (i) no more than 50 percent of the capacity of the closed facility is
2.21transferred; (ii) the capacity of the site or complex to which the beds are transferred does
2.22not increase by more than 50 percent; (iii) the beds are not transferred outside of a federal
2.23health systems agency boundary in place on July 1, 1983; (iv) the relocation or redistribution
2.24does not involve the construction of a new hospital building; and (v) the transferred beds
2.25are used first to replace within the hospital corporate system the total number of beds
2.26previously used in the closed facility site or complex for mental health services and substance
2.27use disorder services. Only after the hospital corporate system has fulfilled the requirements
2.28of this item may the remainder of the available capacity of the closed facility site or complex
2.29be transferred for any other purpose;
2.30(9) a construction project involving up to 35 new beds in a psychiatric hospital in Rice
2.31County that primarily serves adolescents and that receives more than 70 percent of its
2.32patients from outside the state of Minnesota;
2.33(10) a project to replace a hospital or hospitals with a combined licensed capacity of
2.34130 beds or less if: (i) the new hospital site is located within five miles of the current site;
3.1and (ii) the total licensed capacity of the replacement hospital, either at the time of
3.2construction of the initial building or as the result of future expansion, will not exceed 100
3.3licensed hospital beds, or the combined licensed capacity of the hospitals, whichever is less;
3.4(11) the relocation of licensed hospital beds from an existing state facility operated by
3.5the Direct Care and Treatment executive board to a new or existing facility, building, or
3.6complex operated by the Direct Care and Treatment executive board; from one regional
3.7treatment center site to another; or from one building or site to a new or existing building
3.8or site on the same campus;
3.9(12) the construction or relocation of hospital beds operated by a hospital having a
3.10statutory obligation to provide hospital and medical services for the indigent that does not
3.11result in a net increase in the number of hospital beds, notwithstanding section 144.552, 27
3.12beds, of which 12 serve mental health needs, may be transferred from Hennepin County
3.13Medical Center to Regions Hospital under this clause;
3.14(13) a construction project involving the addition of up to 31 new beds in an existing
3.15nonfederal hospital in Beltrami County;
3.16(14) a construction project involving the addition of up to eight new beds in an existing
3.17nonfederal hospital in Otter Tail County with 100 licensed acute care beds;
3.18(15) a construction project involving the addition of 20 new hospital beds in an existing
3.19hospital in Carver County serving the southwest suburban metropolitan area;
3.20(16) a project for the construction or relocation of up to 20 hospital beds for the operation
3.21of up to two psychiatric facilities or units for children provided that the operation of the
3.22facilities or units have received the approval of the commissioner of human services;
3.23(17) a project involving the addition of 14 new hospital beds to be used for rehabilitation
3.24services in an existing hospital in Itasca County;
3.25(18) a project to add 20 licensed beds in existing space at a hospital in Hennepin County
3.26that closed 20 rehabilitation beds in 2002, provided that the beds are used only for
3.27rehabilitation in the hospital's current rehabilitation building. If the beds are used for another
3.28purpose or moved to another location, the hospital's licensed capacity is reduced by 20 beds;
3.29(19) a critical access hospital established under section 144.1483, clause (9), and section
3.301820 of the federal Social Security Act, United States Code, title 42, section 1395i-4, that
3.31delicensed beds since enactment of the Balanced Budget Act of 1997, Public Law 105-33,
3.32to the extent that the critical access hospital does not seek to exceed the maximum number
3.33of beds permitted such hospital under federal law;
4.1(20) notwithstanding section 144.552, a project for the construction of a new hospital
4.2in the city of Maple Grove with a licensed capacity of up to 300 beds provided that:
4.3(i) the project, including each hospital or health system that will own or control the entity
4.4that will hold the new hospital license, is approved by a resolution of the Maple Grove City
4.5Council as of March 1, 2006;
4.6(ii) the entity that will hold the new hospital license will be owned or controlled by one
4.7or more not-for-profit hospitals or health systems that have previously submitted a plan or
4.8plans for a project in Maple Grove as required under section 144.552, and the plan or plans
4.9have been found to be in the public interest by the commissioner of health as of April 1,
4.102005;
4.11(iii) the new hospital's initial inpatient services must include, but are not limited to,
4.12medical and surgical services, obstetrical and gynecological services, intensive care services,
4.13orthopedic services, pediatric services, noninvasive cardiac diagnostics, behavioral health
4.14services, and emergency room services;
4.15(iv) the new hospital:
4.16(A) will have the ability to provide and staff sufficient new beds to meet the growing
4.17needs of the Maple Grove service area and the surrounding communities currently being
4.18served by the hospital or health system that will own or control the entity that will hold the
4.19new hospital license;
4.20(B) will provide uncompensated care;
4.21(C) will provide mental health services, including inpatient beds;
4.22(D) will be a site for workforce development for a broad spectrum of health-care-related
4.23occupations and have a commitment to providing clinical training programs for physicians
4.24and other health care providers;
4.25(E) will demonstrate a commitment to quality care and patient safety;
4.26(F) will have an electronic medical records system, including physician order entry;
4.27(G) will provide a broad range of senior services;
4.28(H) will provide emergency medical services that will coordinate care with regional
4.29providers of trauma services and licensed emergency ambulance services in order to enhance
4.30the continuity of care for emergency medical patients; and
4.31(I) will be completed by December 31, 2009, unless delayed by circumstances beyond
4.32the control of the entity holding the new hospital license; and
5.1(v) as of 30 days following submission of a written plan, the commissioner of health
5.2has not determined that the hospitals or health systems that will own or control the entity
5.3that will hold the new hospital license are unable to meet the criteria of this clause;
5.4(21) a project approved under section 144.553;
5.5(22) a project for the construction of a hospital with up to 25 beds in Cass County within
5.6a 20-mile radius of the state Ah-Gwah-Ching facility, provided the hospital's license holder
5.7is approved by the Cass County Board;
5.8(23) a project for an acute care hospital in Fergus Falls that will increase the bed capacity
5.9from 108 to 110 beds by increasing the rehabilitation bed capacity from 14 to 16 and closing
5.10a separately licensed 13-bed skilled nursing facility;
5.11(24) notwithstanding section 144.552, a project for the construction and expansion of a
5.12specialty psychiatric hospital in Hennepin County for up to 50 beds, exclusively for patients
5.13who are under 21 years of age on the date of admission. The commissioner conducted a
5.14public interest review of the mental health needs of Minnesota and the Twin Cities
5.15metropolitan area in 2008. No further public interest review shall be conducted for the
5.16construction or expansion project under this clause;
5.17(25) a project for a 16-bed psychiatric hospital in the city of Thief River Falls, if the
5.18commissioner finds the project is in the public interest after the public interest review
5.19conducted under section 144.552 is complete;
5.20(26)(i) a project for a 20-bed psychiatric hospital, within an existing facility in the city
5.21of Maple Grove, exclusively for patients who are under 21 years of age on the date of
5.22admission, if the commissioner finds the project is in the public interest after the public
5.23interest review conducted under section 144.552 is complete;
5.24(ii) this project shall serve patients in the continuing care benefit program under section
5.25256.9693. The project may also serve patients not in the continuing care benefit program;
5.26and
5.27(iii) if the project ceases to participate in the continuing care benefit program, the
5.28commissioner must complete a subsequent public interest review under section 144.552. If
5.29the project is found not to be in the public interest, the license must be terminated six months
5.30from the date of that finding. If the commissioner of human services terminates the contract
5.31without cause or reduces per diem payment rates for patients under the continuing care
5.32benefit program below the rates in effect for services provided on December 31, 2015, the
6.1project may cease to participate in the continuing care benefit program and continue to
6.2operate without a subsequent public interest review;
6.3(27) a project involving the addition of 21 new beds in an existing psychiatric hospital
6.4in Hennepin County that is exclusively for patients who are under 21 years of age on the
6.5date of admission;
6.6(28) a project to add 55 licensed beds in an existing safety net, level I trauma center
6.7hospital in Ramsey County as deleted text begin designated deleted text end new text begin regulated new text end under section 383A.91, subdivision 5,
6.8of which 15 beds are to be used for inpatient mental health and 40 are to be used for other
6.9services. In addition, five unlicensed observation mental health beds shall be added;
6.10(29) upon submission of a plan to the commissioner for public interest review under
6.11section 144.552 and the addition of the 15 inpatient mental health beds specified in clause
6.12(28), to its bed capacity, a project to add 45 licensed beds in an existing safety net, level I
6.13trauma center hospital in Ramsey County as deleted text begin designated deleted text end new text begin regulated new text end under section 383A.91,
6.14subdivision 5. Five of the 45 additional beds authorized under this clause must be designated
6.15for use for inpatient mental health and must be added to the hospital's bed capacity before
6.16the remaining 40 beds are added. Notwithstanding section 144.552, the hospital may add
6.17licensed beds under this clause prior to completion of the public interest review, provided
6.18the hospital submits its plan by the 2021 deadline and adheres to the timelines for the public
6.19interest review described in section 144.552;
6.20(30) upon submission of a plan to the commissioner for public interest review under
6.21section 144.552, a project to add up to 30 licensed beds in an existing psychiatric hospital
6.22in Hennepin County that exclusively provides care to patients who are under 21 years of
6.23age on the date of admission. Notwithstanding section 144.552, the psychiatric hospital
6.24may add licensed beds under this clause prior to completion of the public interest review,
6.25provided the hospital submits its plan by the 2021 deadline and adheres to the timelines for
6.26the public interest review described in section 144.552;
6.27(31) any project to add licensed beds in a hospital located in Cook County or Mahnomen
6.28County that: (i) is designated as a critical access hospital under section 144.1483, clause
6.29(9), and United States Code, title 42, section 1395i-4; (ii) has a licensed bed capacity of
6.30fewer than 25 beds; and (iii) has an attached nursing home, so long as the total number of
6.31licensed beds in the hospital after the bed addition does not exceed 25 beds. Notwithstanding
6.32section 144.552, a public interest review is not required for a project authorized under this
6.33clause;
7.1(32) upon submission of a plan to the commissioner for public interest review under
7.2section 144.552, a project to add 22 licensed beds at a Minnesota freestanding children's
7.3hospital in St. Paul that is part of an independent pediatric health system with freestanding
7.4inpatient hospitals located in Minneapolis and St. Paul. The beds shall be utilized for pediatric
7.5inpatient behavioral health services. Notwithstanding section 144.552, the hospital may add
7.6licensed beds under this clause prior to completion of the public interest review, provided
7.7the hospital submits its plan by the 2022 deadline and adheres to the timelines for the public
7.8interest review described in section 144.552;
7.9(33) a project for a 144-bed psychiatric hospital on the site of the former Bethesda
7.10hospital in the city of Saint Paul, Ramsey County, if the commissioner finds the project is
7.11in the public interest after the public interest review conducted under section 144.552 is
7.12complete. Following the completion of the construction project, the commissioner of health
7.13shall monitor the hospital, including by assessing the hospital's case mix and payer mix,
7.14patient transfers, and patient diversions. The hospital must have an intake and assessment
7.15area. The hospital must accommodate patients with acute mental health needs, whether they
7.16walk up to the facility, are delivered by ambulances or law enforcement, or are transferred
7.17from other facilities. The hospital must comply with subdivision 1a, paragraph (b). The
7.18hospital must annually submit de-identified data to the department in the format and manner
7.19defined by the commissioner; deleted text begin or deleted text end
7.20(34) a project involving the relocation of up to 26 licensed long-term acute care hospital
7.21beds from an existing long-term care hospital located in Hennepin County with a licensed
7.22capacity prior to the relocation of 92 beds to dedicated space on the campus of an existing
7.23safety net, level I trauma center hospital in Ramsey County as deleted text begin designated deleted text end new text begin regulated new text end under
7.24section 383A.91, subdivision 5, provided both the commissioner finds the project is in the
7.25public interest after the public interest review conducted under section 144.552 is complete
7.26and the relocated beds continue to be used as long-term acute care hospital beds after the
7.27relocation deleted text begin . deleted text end new text begin ; or new text end
7.28 new text begin (35) a project to add 85 licensed beds in an existing safety net, level I trauma center new text end
7.29 new text begin hospital in Ramsey County as regulated under section 383A.91, subdivision 5. new text end
Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.
Progress through the legislative process
Enacted