HF3236
Requirements for water appropriations permits modified.
Legislative Session 94 (2025-2026)
Related bill: SF3423
Bill text
(underlined = new law, struck through = current law the bill removes)
Versions
1.1A bill for an act
1.2relating to environment; modifying requirements for water appropriations permits;
1.3amending Minnesota Statutes 2024, sections 103G.287, subdivision 1; 103G.305,
1.4subdivision 1, by adding a subdivision.
1.5BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.6Section 1. Minnesota Statutes 2024, section 103G.287, subdivision 1, is amended to read:
1.7Subdivision 1. Applications for groundwater appropriations; preliminary
1.8well-construction approval. (a) Groundwater use permit applications are not complete
1.9until the applicant has supplied:
1.10(1) a water well record as required by section 103I.205, subdivision 9, information on
1.11the subsurface geologic formations penetrated by the well and the formation or aquifer that
1.12will serve as the water source, and geologic information from test holes drilled to locate the
1.13site of the production well;
1.14(2) the maximum daily, seasonal, and annual pumpage rates and volumes being requested;
1.15(3) information on groundwater quality in terms of the measures of quality commonly
1.16specified for the proposed water use and details on water treatment necessary for the proposed
1.17use;
1.18(4) the results of deleted text begin an aquifer test completed according to specifications approved by the deleted text end
1.19 deleted text begin commissioner. The test must be conducted at the maximum pumping rate requested in the deleted text end
1.20 deleted text begin application and for a length of time adequate to assess or predict impacts to other wells and deleted text end
1.21 deleted text begin surface water and groundwater resources. The permit applicant is responsible for all costs deleted text end
1.22 deleted text begin related to the aquifer test, including the construction of groundwater and surface water deleted text end
2.1 deleted text begin monitoring installations, and water level readings before, during, and after the aquifer test deleted text end
2.2 new text begin any aquifer test that has previously been completed by, or on behalf of, the applicant related new text end
2.3 new text begin to the proposed water use and well new text end ; and
2.4(5) the results of any assessments conducted by the commissioner under paragraph deleted text begin (c) deleted text end
2.5 new text begin (d) new text end .
2.6(b) The commissioner may waive an application requirement in this subdivision if the
2.7information provided with the application is adequate to determine whether the proposed
2.8appropriation and use of water is sustainable and will protect ecosystems, water quality,
2.9and the ability of future generations to meet their own needs.
2.10 new text begin (c) If the commissioner determines that a new aquifer test is necessary to evaluate a new text end
2.11 new text begin proposed water use or well to determine whether the anticipated appropriation is likely to new text end
2.12 new text begin meet the applicable requirements of this chapter, the commissioner must, within 30 days new text end
2.13 new text begin of the commissioner's receipt of a complete application, issue a written determination new text end
2.14 new text begin requiring the applicant to complete an aquifer test. The written determination must state the new text end
2.15 new text begin factual findings that support the commissioner's determination that a new aquifer test is new text end
2.16 new text begin necessary and set forth the specifications the applicant must follow to complete the aquifer new text end
2.17 new text begin test. The permit applicant is responsible for all costs related to the aquifer test, including new text end
2.18 new text begin the construction of groundwater and surface water monitoring installations and water level new text end
2.19 new text begin readings before, during, and after the aquifer test. new text end
2.20 deleted text begin (c) deleted text end new text begin (d) new text end The commissioner shall provide an assessment of a proposed well needing a
2.21groundwater appropriation permit. The commissioner shall evaluate the information submitted
2.22as required under section 103I.205, subdivision 1, paragraph (e), and determine whether
2.23the anticipated appropriation request is likely to meet the applicable requirements of this
2.24chapter. If the appropriation request is likely to meet applicable requirements, the
2.25commissioner shall provide the person submitting the information with a letter or
2.26electronically transmitted notice providing preliminary approval to construct the well and
2.27the requirements, including test-well information, that will be needed to obtain the permit.
2.28 deleted text begin (d) deleted text end new text begin (e) new text end The commissioner must provide an applicant denied a groundwater use permit
2.29or issued a groundwater use permit that is reduced or restricted from the original request
2.30with all information the commissioner used in making the determination, including
2.31hydrographs, flow tests, aquifer tests, topographic maps, field reports, photographs, and
2.32proof of equipment calibration.
3.1Sec. 2. Minnesota Statutes 2024, section 103G.305, subdivision 1, is amended to read:
3.2Subdivision 1. General 150-day limit. (a) Except as provided in subdivision 2, the
3.3commissioner must act on a water-use permit within 150 days after the completed application
3.4for the permit has been submitted new text begin or, if the commissioner determines that a new aquifer test new text end
3.5 new text begin is necessary under section 103G.287, subdivision 1, paragraph (c), within 120 days after new text end
3.6 new text begin the applicant submits the results of a qualified aquifer test new text end . Within 30 business days of
3.7application for a water-use permit, the commissioner shall notify the applicant, in writing,
3.8whether the application is complete or incomplete. new text begin Failure of the commissioner to deny an new text end
3.9 new text begin application for a water-use permit within the period allowed under this subdivision is new text end
3.10 new text begin approval of the application. new text end
3.11(b) The commissioner must direct a hearing to be held on a water-use permit application
3.12or make an order issuing a permit or denying a permit.
3.13Sec. 3. Minnesota Statutes 2024, section 103G.305, is amended by adding a subdivision
3.14to read:
3.15 new text begin Subd. 3. Extensions. (a) The time limit in subdivision 1 is extended if a state statute, new text end
3.16 new text begin federal law, or court order requires a process to occur before the commissioner acts on the new text end
3.17 new text begin application and the time periods prescribed in the state statute, federal law, or court order new text end
3.18 new text begin make it impossible for the commissioner to act on the application within the period allowed new text end
3.19 new text begin under subdivision 1. In cases described in this paragraph, the deadline is extended to 60 new text end
3.20 new text begin days after completion of the last process required in the applicable statute, law, or order. new text end
3.21 new text begin Final approval of the commissioner is not considered a process for purposes of this paragraph. new text end
3.22 new text begin (b) The commissioner may extend the time limit in subdivision 1 before the end of the new text end
3.23 new text begin initial period allowed under subdivision 1 by providing written notice of the extension to new text end
3.24 new text begin the applicant. The notification must state the reasons for the extension and its anticipated new text end
3.25 new text begin length, which may not exceed 60 days unless approved by the applicant. new text end
3.26 new text begin (c) An applicant may, by written notice to the commissioner, request an extension of new text end
3.27 new text begin the time limit under this section. new text end
Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.