HF3212

Nine-county regional waste management system in northwest Minnesota funding provided, bonds issued, and money appropriated.
Legislative Session 94 (2025-2026)

Related bill: SF3404

Bill text

Introduction

ReadChanges
PDF
(underlined = new law, struck through = current law the bill removes)
1.1A bill for an act
1.2relating to capital investment; appropriating money for a nine-county regional
1.3waste management system in northwest Minnesota; authorizing the sale and
1.4issuance of state bonds.
1.5BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.6Section 1. new text begin NORTHWEST REGIONAL SOLID WASTE MANAGEMENT FACILITY. new text end
1.7 new text begin Subdivision 1. Appropriation; bond proceeds. (a) $34,588,148 is appropriated from new text end
1.8 new text begin the bond proceeds fund to the Pollution Control Agency for grants to nine counties to fund new text end
1.9 new text begin specified aspects of a regional waste management system that will include one new lined new text end
1.10 new text begin regional debris disposal facility located in Hubbard County and 12 mixed-use collection new text end
1.11 new text begin and processing facilities located in the counties of Beltrami, Cass, Clearwater, Hubbard, new text end
1.12 new text begin Mahnomen, Marshall, Norman, Polk, and Red Lake, that coordinate with the two regional new text end
1.13 new text begin debris disposal facilities. Of this appropriation: new text end
1.14 new text begin (1) $5,439,285 is for a grant to Beltrami County to design and construct new buildings new text end
1.15 new text begin and site improvements at the existing solid waste processing facilities in Beltrami County new text end
1.16 new text begin and to acquire and install capital equipment; new text end
1.17 new text begin (2) $5,689,725 is for a grant to Cass County to design and construct new buildings and new text end
1.18 new text begin make site improvements at the existing solid waste processing facility in Cass County, and new text end
1.19 new text begin to acquire and install capital equipment; new text end
1.20 new text begin (3) $1,185,450 is for a grant to Clearwater County to design and construct a new building, new text end
1.21 new text begin renovate an existing building, and implement site improvements at the existing solid waste new text end
1.22 new text begin processing facility in Clearwater County and to acquire and install capital equipment; new text end
2.1 new text begin (4) $6,894,375 is for a grant to Hubbard County to design and construct a lined regional new text end
2.2 new text begin construction and demolition debris landfill facility that includes construction of new buildings new text end
2.3 new text begin and site improvements and acquisition and installation of capital equipment for processing new text end
2.4 new text begin solid waste; new text end
2.5 new text begin (5) $8,463,563 is for a grant to Hubbard County to design and construct the expansion new text end
2.6 new text begin of and renovations to buildings to construct new buildings, make site improvements at the new text end
2.7 new text begin existing solid waste processing facilities in Hubbard County, and to acquire and install new text end
2.8 new text begin capital equipment; new text end
2.9 new text begin (6) $690,000 is for a grant to Mahnomen County to design and construct new buildings, new text end
2.10 new text begin make site improvements, and to acquire and install capital equipment; new text end
2.11 new text begin (7) $968,250 is for a grant to Marshall County to design and construct a new building, new text end
2.12 new text begin site improvements, and to acquire and install capital equipment; new text end
2.13 new text begin (8) $352,500 is for a grant to Norman County to design and construct a new building, new text end
2.14 new text begin make site improvements, and to acquire and install capital equipment; new text end
2.15 new text begin (9) $4,492,500 is for a grant to Polk County to design and construct expansion of and new text end
2.16 new text begin renovations to buildings, to construct new buildings, make site improvements at the existing new text end
2.17 new text begin solid waste processing facilities in Polk County, and to acquire and install capital equipment; new text end
2.18 new text begin and new text end
2.19 new text begin (10) $412,500 is for a grant to Red Lake County to design and construct new buildings, new text end
2.20 new text begin site improvements, and to acquire and install capital equipment. new text end
2.21 new text begin (b) "Capital equipment" as used in this subdivision means fixed equipment with a useful new text end
2.22 new text begin life of at least ten years that is used to manage, alter, classify, sort, or process solid waste, new text end
2.23 new text begin including conveyor systems, balers, compactors, compressors, robots to manipulate waste, new text end
2.24 new text begin fire suppression systems, and scales. new text end
2.25 new text begin (c) "Site improvements" as used in this subdivision means infrastructure necessary to new text end
2.26 new text begin access, secure, use, or operate a solid waste processing facility. new text end
2.27 new text begin (d) "Building" as used in this subdivision means a building used primarily for reducing new text end
2.28 new text begin exposure of materials contained within to the elements, to allow for aggregation, processing new text end
2.29 new text begin or storage of those materials, and for ancillary purposes to support those activities. new text end
2.30 new text begin Subd. 2. Bond sale. To provide the money appropriated in this section from the bond new text end
2.31 new text begin proceeds fund, the commissioner of management and budget shall sell and issue bonds of new text end
2.32 new text begin the state in an amount up to $34,588,148 in the manner, upon the terms, and with the effect new text end
3.1 new text begin prescribed by Minnesota Statutes, sections 16A.631 to 16A.675, and by the Minnesota new text end
3.2 new text begin Constitution, article XI, sections 4 to 7. new text end
3.3Sec. 2. new text begin APPROPRIATION; GENERAL FUND. new text end
3.4 new text begin (a) $15,718,103 in fiscal year 2025 is appropriated from the general fund to the Pollution new text end
3.5 new text begin Control Agency for grants to nine counties for heavy equipment, containers, or trailers for new text end
3.6 new text begin spoke facilities for a nine-county regional waste management system as follows: new text end
3.7 new text begin (1) $1,385,715 is for a grant to Beltrami County to acquire heavy equipment and new text end
3.8 new text begin containers for the spoke located in Beltrami County, and material hauling trucks and trailers new text end
3.9 new text begin to expand the current multicounty hauling services; new text end
3.10 new text begin (2) $1,060,275 is for a grant to Cass County to acquire material-hauling trucks, heavy new text end
3.11 new text begin equipment, mobile processing equipment, and containers for the spoke located in Cass new text end
3.12 new text begin County; new text end
3.13 new text begin (3) $614,550 is for a grant to Clearwater County to acquire heavy equipment and new text end
3.14 new text begin containers for the spoke located in Clearwater County; new text end
3.15 new text begin (4) $2,855,625 is for a grant to Hubbard County to purchase material-hauling trucks, new text end
3.16 new text begin heavy equipment, mobile processing equipment, and containers to move and manage new text end
3.17 new text begin materials at the new lined regional debris disposal facility in Hubbard County; new text end
3.18 new text begin (5) $1,886,438 is for a grant to Hubbard County to purchase heavy equipment, mobile new text end
3.19 new text begin processing equipment, and containers for the spoke located in Hubbard County and trailers new text end
3.20 new text begin to expand the current multicounty hauling services; new text end
3.21 new text begin (6) $210,000 is for a grant to Mahnomen County to purchase heavy equipment and new text end
3.22 new text begin containers for the spoke located in Mahnomen County; new text end
3.23 new text begin (7) $531,750 is for a grant to Marshall County to purchase heavy equipment and new text end
3.24 new text begin containers for the spoke located in Marshall County; new text end
3.25 new text begin (8) $135,000 is for a grant to Norman County to purchase heavy equipment and containers new text end
3.26 new text begin for the spoke located in Norman County; new text end
3.27 new text begin (9) $6,513,750 is for a grant to Polk County to purchase heavy equipment, mobile new text end
3.28 new text begin processing equipment, and containers for the spokes located in Polk County and for trailers new text end
3.29 new text begin to expand the current multicounty hauling services; and new text end
3.30 new text begin (10) $525,000 is for a grant to Red Lake County to purchase heavy equipment and new text end
3.31 new text begin containers for the spoke located in Red Lake County. new text end
4.1 new text begin (b) Appropriations in this section are onetime and are available until encumbered or new text end
4.2 new text begin expended, subject to Minnesota Statutes, section 16A.642. new text end
4.3 new text begin (c) As used in this section, "spoke" means a mixed-use collection and processing facility. new text end
4.4 new text begin (d) As used in this section, "heavy equipment" means machinery that is self-propelled new text end
4.5 new text begin and used primarily for moving, sorting, altering material size or shape, or aggregating new text end
4.6 new text begin materials. new text end

Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.