HF3080

Certain trunk highway project development transparency requirements modified, including to require a transportation project activity portal; legislative reports modified; and money appropriated.
Legislative Session 94 (2025-2026)

Bill text

Introduction

ReadChanges
PDF
(underlined = new law, struck through = current law the bill removes)
1.1A bill for an act
1.2relating to transportation; modifying certain trunk highway project development
1.3transparency requirements, including to require a transportation project activity
1.4portal; modifying certain legislative reports; appropriating money; amending
1.5Minnesota Statutes 2024, sections 161.178, subdivision 1; 174.03, subdivision 12;
1.6174.07, subdivision 3; 174.56; proposing coding for new law in Minnesota Statutes,
1.7chapter 174.
1.8BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.9Section 1. Minnesota Statutes 2024, section 161.178, subdivision 1, is amended to read:
1.10Subdivision 1. Definitions. (a) For purposes of this section, the following terms have
1.11the meanings given.
1.12(b) "Applicable entity" means the commissioner with respect to a project or portfolio
1.13for inclusion in the state transportation improvement program or a metropolitan planning
1.14organization with respect to a project or portfolio for inclusion in the appropriate metropolitan
1.15transportation improvement program.
1.16(c) "Assessment" means the impact assessment under this section.
1.17(d) "Capacity expansion project" means a project for trunk highway construction or
1.18reconstruction that:
1.19(1) is a major highway project, as defined in section deleted text begin 174.56 deleted text end new text begin 174.034 new text end , subdivision 1,
1.20paragraph deleted text begin (b) deleted text end new text begin (c) new text end ; and
1.21(2) adds highway traffic capacity or provides for grade separation of motor vehicle traffic
1.22at an intersection, excluding auxiliary lanes with a length of less than 2,500 feet.
2.1(e) "Greenhouse gas emissions" includes those emissions described in section 216H.01,
2.2subdivision 2.
2.3Sec. 2. Minnesota Statutes 2024, section 174.03, subdivision 12, is amended to read:
2.4Subd. 12. Trunk highway performance, resiliency, and sustainability. (a) The
2.5commissioner must implement performance measures and targets for the trunk highway
2.6system in order to construct resilient infrastructure, enhance the project selection for all
2.7transportation modes, improve economic security, and achieve the state transportation goals
2.8established in section 174.01.
2.9(b) At a minimum, the transportation planning process must include:
2.10(1) an inventory of transportation assets, including but not limited to bridge, pavement,
2.11geotechnical, pedestrian, bicycle, and transit asset categories;
2.12(2) establishment of statewide performance measures and targets, reporting of
2.13performance measure results, and where possible, performance forecasts that are:
2.14(i) statewide and, where data allow, district-specific;
2.15(ii) for assets in each asset category specified in clause (1); and
2.16(iii) identified in collaboration with the public;
2.17(3) gap identification and an explanation of the difference between performance targets
2.18and current status; and
2.19(4) life cycle assessment and corridor risk assessment as part of asset management
2.20programs in each district of the department.
2.21(c) At a minimum, the ten-year capital highway investment plan in each district of the
2.22department must:
2.23(1) be based on expected funding during the plan period and, to the extent feasible,
2.24maximize long-term benefits;
2.25(2) estimate the funding necessary to make optimal life cycle investments;
2.26(3) identify investments within each of the asset categories specified in paragraph (b),
2.27clause (1), that are funded through the trunk highway capital program;
2.28(4) identify specific trunk highway segments programmed to be removed from the trunk
2.29highway system; and
3.1(5) deliver annual progress toward achieving the state transportation goals established
3.2in section 174.01.
3.3 deleted text begin (d) Annually by December 15, the commissioner must report trunk highway performance deleted text end
3.4 deleted text begin measures and targets and identify gaps, including information detailing the department's deleted text end
3.5 deleted text begin progress on achieving the state transportation goals, to the chairs and ranking minority deleted text end
3.6 deleted text begin members of the legislative committees having jurisdiction over transportation policy and deleted text end
3.7 deleted text begin finance. The report must be signed by the commissioner. deleted text end
3.8Sec. 3. new text begin [174.034] TRANSPORTATION PROJECT ACTIVITY PORTAL. new text end
3.9 new text begin Subdivision 1. Definitions. (a) For purposes of this section, the following terms have new text end
3.10 new text begin the meanings given. new text end
3.11 new text begin (b) "Analysis activity" means an undertaking to analyze or study a highway or a corridor new text end
3.12 new text begin prior to project identification or as part of project development. Analysis activity includes new text end
3.13 new text begin but is not limited to: (1) planning, assessment, project scoping, project development, land new text end
3.14 new text begin acquisition, environmental review, and project-related public engagement; and (2) a safety new text end
3.15 new text begin study or audit, a corridor analysis or study, a planning study, a feasibility analysis, a purpose new text end
3.16 new text begin and need assessment, or similar assessment or analysis. new text end
3.17 new text begin (c) "Major highway project" means a highway project that has a total cost for all segments new text end
3.18 new text begin that the commissioner most recently estimates to be at least (1) $15,000,000 in the new text end
3.19 new text begin metropolitan highway construction district, or (2) $5,000,000 in any nonmetropolitan new text end
3.20 new text begin highway construction district. new text end
3.21 new text begin Subd. 2. Portal establishment. The commissioner must maintain a centralized portal new text end
3.22 new text begin on the department's website that provides comprehensive information on highway projects, new text end
3.23 new text begin project development, studies and assessments, and related activity. new text end
3.24 new text begin Subd. 3. Portal design. The portal must: new text end
3.25 new text begin (1) provide a geographic information system interface that allows for identification of new text end
3.26 new text begin projects and analysis activity through interactive mapping; new text end
3.27 new text begin (2) identify: new text end
3.28 new text begin (i) each trunk highway project that is specified in the state transportation improvement new text end
3.29 new text begin program, excluding general or maintenance set-asides; the statewide multimodal new text end
3.30 new text begin transportation plan; the Minnesota state highway investment plan; or a ten-year capital new text end
3.31 new text begin highway investment plan in a district; new text end
4.1 new text begin (ii) each trunk highway project that reached substantial completion in the current or new text end
4.2 new text begin previous two calendar years; new text end
4.3 new text begin (iii) each trunk highway project that is planned for the ensuing 15 years; and new text end
4.4 new text begin (iv) each trunk highway segment or corridor for which the commissioner: (A) is new text end
4.5 new text begin undertaking analysis activity; or (B) has completed an analysis activity under subitem (A) new text end
4.6 new text begin within the previous five years; new text end
4.7 new text begin (3) identify department districts, jurisdictions of local units of government, state and new text end
4.8 new text begin local road systems, major geographic features, and relevant local landmarks; new text end
4.9 new text begin (4) provide the ability to search, filter, and apply mapping layer visibility based on new text end
4.10 new text begin location, dates, status, and common transportation categories; new text end
4.11 new text begin (5) present information in a manner that is readily understood by the general public; new text end
4.12 new text begin (6) allow for future extension to incorporate local road projects; and new text end
4.13 new text begin (7) provide access to the information required under subdivision 4 and the dashboard new text end
4.14 new text begin required under subdivision 5. new text end
4.15 new text begin Subd. 4. Information contents. (a) The commissioner must provide information on the new text end
4.16 new text begin department's website for each project or analysis activity identified under subdivision 3, new text end
4.17 new text begin clause (2). At a minimum, the information must include: new text end
4.18 new text begin (1) a plain language description of the nature and scope of the project or analysis activity; new text end
4.19 new text begin (2) as appropriate, the state project number and bridge number; new text end
4.20 new text begin (3) as appropriate, an explanation of the project purpose and need; new text end
4.21 new text begin (4) at least one map that identifies the project limits, corridor, or general location; new text end
4.22 new text begin (5) a timeline that provides any key milestones; new text end
4.23 new text begin (6) the primary documentation for the project or analysis activity, including but not new text end
4.24 new text begin limited to project layout and design plans, data and results from relevant modeling, and any new text end
4.25 new text begin studies or reports; new text end
4.26 new text begin (7) a fiscal overview that includes project or analysis activity cost and funding sources; new text end
4.27 new text begin (8) notice of any scheduled public meetings, and if testimony is being taken, the ability new text end
4.28 new text begin for an individual to arrange to testify; new text end
4.29 new text begin (9) details on each previous public meeting, including but not limited to meeting minutes, new text end
4.30 new text begin presentations, associated documents, and recordings; new text end
5.1 new text begin (10) identification of a project or analysis activity contact; and new text end
5.2 new text begin (11) for each major highway project, project details that at a minimum include: new text end
5.3 new text begin (i) project purposes relative to objectives in the statewide multimodal transportation new text end
5.4 new text begin plan and investment priority areas established in the Minnesota state highway investment new text end
5.5 new text begin plan; new text end
5.6 new text begin (ii) a history of the project, including but not limited to previous official actions by the new text end
5.7 new text begin department or the appropriate area transportation partnership, or both; the date on which new text end
5.8 new text begin the project was first included in the state transportation improvement plan; the cost of the new text end
5.9 new text begin project at that time; the planning estimate for the project; the engineer's estimate; the award new text end
5.10 new text begin price; the final cost as of six months after substantial completion, including any supplemental new text end
5.11 new text begin agreements and cost overruns or cost savings; the dates of environmental approval; the dates new text end
5.12 new text begin of municipal approval; the date of final geometric layout; and the date of establishment of new text end
5.13 new text begin any construction limits; new text end
5.14 new text begin (iii) the project's priority listing or rank within its construction district, if any, as well new text end
5.15 new text begin as the reasons for that listing or rank, the criteria used in prioritization or rank, any changes new text end
5.16 new text begin in that prioritization or rank since the project was first included in a department work plan, new text end
5.17 new text begin and the reasons for those changes; and new text end
5.18 new text begin (iv) past and potential future reasons for delay in letting or completing the project, details new text end
5.19 new text begin of all project cost changes that exceed $500,000, and specific modifications to the overall new text end
5.20 new text begin program that are made as a result of delays and project cost changes. new text end
5.21 new text begin (b) The commissioner must maintain and revise the information required under this new text end
5.22 new text begin subdivision in a timely manner, and must publish the public meeting information required new text end
5.23 new text begin under paragraph (a), clause (8), within two weeks of the meeting. new text end
5.24 new text begin Subd. 5. Fiscal transparency dashboard. The commissioner must provide a fiscal new text end
5.25 new text begin transparency dashboard on the department's website that summarizes fiscal information for new text end
5.26 new text begin the current fiscal year and each year in the state transportation improvement program. At a new text end
5.27 new text begin minimum, the dashboard must include: new text end
5.28 new text begin (1) a summary of total amounts by funding source and for projects; new text end
5.29 new text begin (2) identification of total expenditures associated with each objective in the statewide new text end
5.30 new text begin multimodal transportation plan under section 174.03, subdivision 1a, and resulting impacts new text end
5.31 new text begin on associated performance targets; and new text end
5.32 new text begin (3) an overview of expenditures by investment priority area established in the Minnesota new text end
5.33 new text begin state highway investment plan under section 174.03, subdivision 1c. new text end
6.1 new text begin Subd. 6. Implementation. The commissioner must implement the requirements of this new text end
6.2 new text begin section by the earlier of January 1, 2027, or completion of necessary information technology new text end
6.3 new text begin changes. new text end
6.4Sec. 4. Minnesota Statutes 2024, section 174.07, subdivision 3, is amended to read:
6.5Subd. 3. Exceptions. This section does not apply to:
6.6(1) a law that establishes a requirement with general applicability for an agency or
6.7agencies to submit a report, including but not limited to reports and information under
6.8sections 14.05, subdivision 5, and 14.116;
6.9(2) a law that specifies a reporting expiration date or a date for the submission of a final
6.10report;
6.11(3) information required by law to be included in a budget submission to the legislature
6.12under section 16A.11;
6.13(4) the plans required under section 174.03, subdivisions 1a, 1b, and 1c;
6.14(5) the forecast information requirements under section 174.03, subdivision 9; and
6.15(6) the reports required under sections 161.088, subdivision 7; 161.089; 161.3203,
6.16subdivision 4; 165.03, subdivision 8; deleted text begin 174.03, subdivision 12; deleted text end 174.185, subdivision 3;
6.17174.247; 174.56, subdivisions 1 and 2; and 174.75, subdivision 3.
6.18Sec. 5. Minnesota Statutes 2024, section 174.56, is amended to read:
6.19174.56 REPORT ON deleted text begin MAJOR HIGHWAY PROJECTS, deleted text end TRUNK HIGHWAY
6.20 deleted text begin FUND deleted text end new text begin PERFORMANCE, new text end EXPENDITURES, AND EFFICIENCIES.
6.21Subdivision 1. Report required. deleted text begin (a) deleted text end The commissioner of transportation deleted text begin shall deleted text end new text begin must new text end
6.22submit a report by December 15 of each year on deleted text begin (1) the status of major highway projects deleted text end
6.23 deleted text begin completed during the previous two years or under construction or planned during the year deleted text end
6.24 deleted text begin of the report and for the ensuing 15 years, (2) trunk highway fund expenditures, and (3) deleted text end
6.25 deleted text begin efficiencies achieved during the previous two fiscal years deleted text end new text begin trunk highway system performance new text end
6.26 new text begin and department activity new text end .
6.27 deleted text begin (b) For purposes of this section, a "major highway project" is a highway project that has deleted text end
6.28 deleted text begin a total cost for all segments that the commissioner estimates at the time of the report to be deleted text end
6.29 deleted text begin at least (1) $15,000,000 in the metropolitan highway construction district, or (2) $5,000,000 deleted text end
6.30 deleted text begin in any nonmetropolitan highway construction district. deleted text end
7.1 deleted text begin Subd. 2. Report contents; major highway projects. For each major highway project deleted text end
7.2 deleted text begin the report must include: deleted text end
7.3 deleted text begin (1) a description of the project sufficient to specify its scope and location; deleted text end
7.4 deleted text begin (2) a history of the project, including, but not limited to, previous official actions by the deleted text end
7.5 deleted text begin department or the appropriate area transportation partnership, or both, the date on which deleted text end
7.6 deleted text begin the project was first included in the state transportation improvement plan, the cost of the deleted text end
7.7 deleted text begin project at that time, the planning estimate for the project, the engineer's estimate, the award deleted text end
7.8 deleted text begin price, the final cost as of six months after substantial completion, including any supplemental deleted text end
7.9 deleted text begin agreements and cost overruns or cost savings, the dates of environmental approval, the dates deleted text end
7.10 deleted text begin of municipal approval, the date of final geometric layout, and the date of establishment of deleted text end
7.11 deleted text begin any construction limits; deleted text end
7.12 deleted text begin (3) the project's priority listing or rank within its construction district, if any, as well as deleted text end
7.13 deleted text begin the reasons for that listing or rank, the criteria used in prioritization or rank, any changes deleted text end
7.14 deleted text begin in that prioritization or rank since the project was first included in a department work plan, deleted text end
7.15 deleted text begin and the reasons for those changes; deleted text end
7.16 deleted text begin (4) past and potential future reasons for delay in letting or completing the project, details deleted text end
7.17 deleted text begin of all project cost changes that exceed $500,000, and specific modifications to the overall deleted text end
7.18 deleted text begin program that are made as a result of delays and project cost changes; deleted text end
7.19 deleted text begin (5) two representative trunk highway construction projects, one each from the deleted text end
7.20 deleted text begin department's metropolitan district and from greater Minnesota, and for each project report deleted text end
7.21 deleted text begin the cost of environmental mitigation and compliance; and deleted text end
7.22 deleted text begin (6) the annual budget for products and services for each Department of Transportation deleted text end
7.23 deleted text begin district and office, with comparison to actual spending and including measures of productivity deleted text end
7.24 deleted text begin for the previous fiscal year. deleted text end
7.25Subd. 2a. Report contents deleted text begin ; trunk highway fund expenditures deleted text end . The commissioner
7.26 deleted text begin shall deleted text end new text begin must new text end include in the report new text begin : new text end
7.27 new text begin (1) a review of trunk highway performance measures and targets under section 174.03, new text end
7.28 new text begin subdivisions 1c and 12, including identification of gaps; new text end
7.29 new text begin (2) details on the department's progress on achieving the state transportation goals under new text end
7.30 new text begin section 174.01; new text end
7.31 new text begin (3) the annual budget for products and services for each Department of Transportation new text end
7.32 new text begin district and office, including a comparison to actual spending and measures of productivity new text end
7.33 new text begin for the previous fiscal year; new text end
8.1 new text begin (4) new text end information on the total expenditures from the trunk highway fund during the previous
8.2fiscal year, new text begin which must include: new text end
8.3 new text begin (i) a breakout new text end for each Department of Transportation district deleted text begin , deleted text end in the following categories:
8.4road construction; planning; design and engineering; labor; compliance with environmental
8.5regulations; administration; acquisition of right-of-way, including costs for attorney fees
8.6and other compensation for property owners; litigation costs, including payment of claims,
8.7settlements, and judgments; maintenance; and road operations deleted text begin . deleted text end new text begin ; and new text end
8.8 new text begin (ii) any other categories or information identified by the commissioner to provide for new text end
8.9 new text begin expenditure overlap across the categories under item (i) and comparison to other fiscal new text end
8.10 new text begin reporting; and new text end
8.11 new text begin (5) efficiencies achieved during the previous two fiscal years. new text end
8.12Subd. 3. Department resources. The commissioner deleted text begin shall deleted text end new text begin must new text end prepare and submit the
8.13report with existing department staff and resources.
8.14 deleted text begin Subd. 4. Availability of information. The commissioner must maintain an Internet deleted text end
8.15 deleted text begin website that displays information for each major highway project. At a minimum, the deleted text end
8.16 deleted text begin information must include the report contents identified in subdivision 2. deleted text end
8.17Sec. 6. new text begin APPROPRIATION; PROJECT ACTIVITY PORTAL. new text end
8.18 new text begin $....... in fiscal year 2026 is appropriated from the trunk highway fund to the commissioner new text end
8.19 new text begin of transportation to implement the requirements under Minnesota Statutes, section 174.034. new text end

Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.

Progress through the legislative process

17%
In Committee
Loading…