1.2relating to energy; establishing a budget for energy, transmission, petroleum, and
1.3renewable energy purposes; adding and modifying provisions governing geothermal
1.4energy, solar energy, and other energy policy; authorizing natural gas utilities to
1.5sell extraordinary event bonds under certain circumstances; appropriating money;
1.6amending Minnesota Statutes 2024, sections 116C.7792; 216B.16, subdivisions
1.714, 15, by adding a subdivision; 216B.1641, by adding a subdivision; 216B.2402,
1.8subdivision 16; 216B.2421, subdivision 2; 216B.62, subdivision 3, by adding a
1.9subdivision; 216C.09; 216C.10; 216C.11; 216C.12; 216C.391, subdivisions 1, 3;
1.10216C.47, subdivision 1; proposing coding for new law in Minnesota Statutes,
1.11chapter 216B.
1.12BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.13ARTICLE 1
1.14CLIMATE AND ENERGY FINANCE
1.15Section 1. new text begin APPROPRIATIONS. new text end
1.16 new text begin The sums shown in the columns marked "Appropriations" are appropriated to the agencies new text end
1.17 new text begin and for the purposes specified in this article. The appropriations are from the general fund, new text end
1.18 new text begin or another named fund, and are available for the fiscal years indicated for each purpose. new text end
1.19 new text begin The figures "2026" and "2027" used in this article mean that the appropriations listed under new text end
1.20 new text begin them are available for the fiscal year ending June 30, 2026, or June 30, 2027, respectively. new text end
1.21 new text begin "The first year" is fiscal year 2026. "The second year" is fiscal year 2027. "The biennium" new text end
1.22 new text begin is fiscal years 2026 and 2027. If an appropriation in this article is enacted more than once new text end
1.23 new text begin in the 2025 regular or a special legislative session, the appropriation must be given effect new text end
1.24 new text begin only once. new text end
1.25 new text begin APPROPRIATIONS new text end
1.26 new text begin Available for the Year new text end
2.1 new text begin Ending June 30 new text end
2.2 new text begin 2026 2027 new text end
2.3Sec. 2. new text begin DEPARTMENT OF COMMERCE new text end
2.4 new text begin Subdivision 1. Total Appropriation $ 12,644,000 $ 12,644,000 new text end
2.5 new text begin Appropriations by Fund new text end
2.6 new text begin 2026 2027 new text end
2.7 new text begin General 11,047,000 11,047,000 new text end
2.8 new text begin Petroleum Tank 1,597,000 1,597,000 new text end
2.9 new text begin The amounts that may be spent for each new text end
2.10 new text begin purpose are specified in the following new text end
2.11 new text begin subdivisions. new text end
2.12 new text begin Subd. 2. Energy Resources 11,047,000 11,047,000 new text end
2.13 new text begin (a) $150,000 the first year and $150,000 the new text end
2.14 new text begin second year are to remediate vermiculite new text end
2.15 new text begin insulation from households that are eligible new text end
2.16 new text begin for weatherization assistance under new text end
2.17 new text begin Minnesota's weatherization assistance program new text end
2.18 new text begin state plan under Minnesota Statutes, section new text end
2.19 new text begin 216C.264. Remediation must be performed in new text end
2.20 new text begin conjunction with federal weatherization new text end
2.21 new text begin assistance program services. new text end
2.22 new text begin (b) $189,000 each year is for activities new text end
2.23 new text begin associated with a utility's implementation of new text end
2.24 new text begin a natural gas innovation plan under Minnesota new text end
2.25 new text begin Statutes, section 216B.2427. new text end
2.26 new text begin (c) $500,000 each year is for a grant to the new text end
2.27 new text begin clean energy resource teams under Minnesota new text end
2.28 new text begin Statutes, section 216C.385, subdivision 2, to new text end
2.29 new text begin provide additional capacity to perform the new text end
2.30 new text begin duties specified under Minnesota Statutes, new text end
2.31 new text begin section 216C.385, subdivision 3. This new text end
2.32 new text begin appropriation may be used to reimburse new text end
2.33 new text begin reasonable costs incurred by the Department new text end
2.34 new text begin of Commerce to administer the grant. new text end
3.1 new text begin (d) $301,000 each year is to implement energy new text end
3.2 new text begin benchmarking under Minnesota Statutes, new text end
3.3 new text begin section 216C.331. new text end
3.4 new text begin (e) $164,000 each year is for activities new text end
3.5 new text begin associated with a public utility's transportation new text end
3.6 new text begin electrification plan filing under Minnesota new text end
3.7 new text begin Statutes, section 216B.1615. new text end
3.8 new text begin (f) $77,000 each year is for activities new text end
3.9 new text begin associated with appeals of consumer new text end
3.10 new text begin complaints to the commission under new text end
3.11 new text begin Minnesota Statutes, section 216B.172. new text end
3.12 new text begin (g) $961,000 each year is for activities new text end
3.13 new text begin required under Minnesota Statutes, section new text end
3.14 new text begin 216B.1641, for community solar gardens. This new text end
3.15 new text begin appropriation must be assessed directly to the new text end
3.16 new text begin public utility subject to Minnesota Statutes, new text end
3.17 new text begin section 116C.779. new text end
3.18 new text begin (h) $46,000 each year is for work to align new text end
3.19 new text begin energy transmission and distribution planning new text end
3.20 new text begin activities with opportunities along trunk new text end
3.21 new text begin highway rights-of-way. new text end
3.22 new text begin (i) $265,000 each year is to (1) participate in new text end
3.23 new text begin a Public Utilities Commission proceeding to new text end
3.24 new text begin review electric transmission line owners' plans new text end
3.25 new text begin to deploy grid-enhancing technologies, and new text end
3.26 new text begin (2) issue an order to implement the plans. The new text end
3.27 new text begin base in fiscal year 2028 is $0. new text end
3.28 new text begin The general fund base is $10,782,000 in fiscal new text end
3.29 new text begin year 2028 and $10,782,000 in fiscal year 2029. new text end
3.30 new text begin Subd. 3. Petroleum Tank Release Compensation new text end
3.31 new text begin Board 1,597,000 1,597,000 new text end
3.32 new text begin This appropriation is from the petroleum tank new text end
3.33 new text begin fund. new text end
3.34Sec. 3. new text begin PUBLIC UTILITIES COMMISSION $ 13,330,000 $ 13,417,000 new text end
4.1 new text begin The general fund base is $13,183,000 in fiscal new text end
4.2 new text begin year 2028 and later. new text end
4.3Sec. 4. new text begin TRANSFERS. new text end
4.4 new text begin $1,199,000 in fiscal year 2026 and $1,199,000 in fiscal year 2027 are transferred from new text end
4.5 new text begin the general fund to the preweatherization account in the special revenue fund under Minnesota new text end
4.6 new text begin Statutes, section 216C.264, subdivision 1c. The commissioner of management and budget new text end
4.7 new text begin must include a transfer of $1,199,000 each year from the general fund to the new text end
4.8 new text begin preweatherization account in the special revenue fund in each forecast prepared under new text end
4.9 new text begin Minnesota Statutes, section 16A.103, from the effective date of this section through the new text end
4.10 new text begin February 2027 forecast. new text end
4.11Sec. 5. new text begin APPROPRIATION EXTENSION. new text end
4.12 new text begin The availability of the appropriation for the Tribal Advocacy Council on Energy in Laws new text end
4.13 new text begin 2023, chapter 60, article 10, section 2, subdivision 2, paragraph (i), is extended to June 30, new text end
4.14 new text begin 2026. new text end
4.15 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
4.16ARTICLE 2
4.17RENEWABLE DEVELOPMENT ACCOUNT APPROPRIATIONS
4.18Section 1. new text begin RENEWABLE DEVELOPMENT FINANCE. new text end
4.19 new text begin The sums shown in the columns marked "Appropriations" are appropriated to the agencies new text end
4.20 new text begin and for the purposes specified in this article. Notwithstanding Minnesota Statutes, section new text end
4.21 new text begin 116C.779, subdivision 1, paragraph (j), the appropriations are from the renewable new text end
4.22 new text begin development account in the special revenue fund established in Minnesota Statutes, section new text end
4.23 new text begin 116C.779, subdivision 1, and are available for the fiscal years indicated for each purpose. new text end
4.24 new text begin The figures "2026" and "2027" used in this article mean that the appropriations listed under new text end
4.25 new text begin them are available for the fiscal year ending June 30, 2026, or June 30, 2027, respectively. new text end
4.26 new text begin "The first year" is fiscal year 2026. "The second year" is fiscal year 2027. "The biennium" new text end
4.27 new text begin is fiscal years 2026 and 2027. If an appropriation in this article is enacted more than once new text end
4.28 new text begin in the 2025 regular or special legislative session, the appropriation must be given effect new text end
4.29 new text begin only once. new text end
4.30 new text begin APPROPRIATIONS new text end
4.31 new text begin Available for the Year new text end
5.1 new text begin Ending June 30 new text end
5.2 new text begin 2026 2027 new text end
5.3Sec. 2. new text begin DEPARTMENT OF COMMERCE new text end
5.4 new text begin Subdivision 1. Total Appropriation $ 10,500,000 $ 100,000 new text end
5.5 new text begin The amounts that may be spent for each new text end
5.6 new text begin purpose are specified in the following new text end
5.7 new text begin subdivisions. new text end
5.8 new text begin Subd. 2. "Made in Minnesota" Administration new text end
5.9 new text begin $100,000 each year is to administer the "Made new text end
5.10 new text begin in Minnesota" solar energy production new text end
5.11 new text begin incentive program under Minnesota Statutes, new text end
5.12 new text begin section 216C.417. Any unobligated amount new text end
5.13 new text begin remaining on June 30, 2027, cancels to the new text end
5.14 new text begin renewable development account. new text end
5.15 new text begin Subd. 3. Microgrid Research and Application new text end
5.16 new text begin $1,200,000 the first year is for a grant to the new text end
5.17 new text begin University of St. Thomas Center for Microgrid new text end
5.18 new text begin Research, which must be used to: new text end
5.19 new text begin (1) increase the center's capacity to provide new text end
5.20 new text begin industry partners with opportunities to test new text end
5.21 new text begin near-commercial microgrid products on a new text end
5.22 new text begin real-world scale and to multiply opportunities new text end
5.23 new text begin for innovative research; new text end
5.24 new text begin (2) procure advanced equipment and controls new text end
5.25 new text begin to enable the extension of the university's new text end
5.26 new text begin microgrid to additional buildings; and new text end
5.27 new text begin (3) expand (i) hands-on educational new text end
5.28 new text begin opportunities for undergraduate and graduate new text end
5.29 new text begin electrical engineering students to increase new text end
5.30 new text begin understanding of microgrid operations, and new text end
5.31 new text begin (ii) partnerships with community colleges. new text end
5.32 new text begin This is a onetime appropriation and is new text end
5.33 new text begin available until June 30, 2028. new text end
6.1 new text begin Subd. 4. Green Hydrogen Project new text end
6.2 new text begin $2,000,000 the first year is for a grant to the new text end
6.3 new text begin city of St. Cloud for the Green Hydrogen new text end
6.4 new text begin Project to incorporate a battery and renewable new text end
6.5 new text begin energy system. This is a onetime appropriation new text end
6.6 new text begin and is available until June 30, 2028. new text end
6.7 new text begin Subd. 5. Anaerobic Digester Energy System new text end
6.8 new text begin $4,000,000 the first year is for a grant to new text end
6.9 new text begin Ramsey/Washington Recycling and Energy, new text end
6.10 new text begin in partnership with Dem-Con HZI Bioenergy, new text end
6.11 new text begin LLC, to construct an anaerobic digester energy new text end
6.12 new text begin system in Louisville Township. For the new text end
6.13 new text begin purposes of this subdivision, "anaerobic new text end
6.14 new text begin digester energy system" means a facility that new text end
6.15 new text begin uses diverted food and organic waste to create new text end
6.16 new text begin renewable natural gas and biochar. This is a new text end
6.17 new text begin onetime appropriation and is available until new text end
6.18 new text begin June 30, 2028. new text end
6.19 new text begin Subd. 6. Como Zoo Geothermal Energy System new text end
6.20 new text begin $2,200,000 the first year is for a grant to Como new text end
6.21 new text begin Zoo in the city of St. Paul to construct a new text end
6.22 new text begin geothermal energy system that provides space new text end
6.23 new text begin heating and cooling to the large cats building. new text end
6.24 new text begin For the purposes of this subdivision, new text end
6.25 new text begin "geothermal energy system" means a system new text end
6.26 new text begin composed of a heat pump that moves a new text end
6.27 new text begin heat-transferring fluid through piping new text end
6.28 new text begin embedded in the earth and absorbs the earth's new text end
6.29 new text begin constant temperature, a heat exchanger, and new text end
6.30 new text begin ductwork to distribute heated and cooled air new text end
6.31 new text begin to a building. This is a onetime appropriation new text end
6.32 new text begin and is available until June 30, 2028. new text end
7.1 new text begin Subd. 7. Minnesota Energy Alley new text end
7.2 new text begin (a) $1,000,000 the first year for a grant to new text end
7.3 new text begin Clean Energy Economy Minnesota for the new text end
7.4 new text begin Minnesota Energy Alley initiative. The new text end
7.5 new text begin initiative is designed to promote energy new text end
7.6 new text begin innovation through supporting energy new text end
7.7 new text begin entrepreneurs and emerging businesses to new text end
7.8 new text begin commercialize energy solutions by matching new text end
7.9 new text begin promising innovators with established and new text end
7.10 new text begin trustworthy Minnesota-based public and new text end
7.11 new text begin private partners to demonstrate emerging new text end
7.12 new text begin technologies in real-world applications. The new text end
7.13 new text begin grant may be used to provide seed funding for new text end
7.14 new text begin businesses, develop a training and new text end
7.15 new text begin development program, support recruitment of new text end
7.16 new text begin entrepreneurs to Minnesota, and secure new text end
7.17 new text begin funding from federal programs and corporate new text end
7.18 new text begin partners to establish a self-sustaining, new text end
7.19 new text begin long-term revenue model. This is a onetime new text end
7.20 new text begin appropriation and is available until June 30, new text end
7.21 new text begin 2027. new text end
7.22 new text begin (b) By January 15, 2027, the commissioner of new text end
7.23 new text begin commerce must submit a written report to the new text end
7.24 new text begin chairs and ranking minority members of the new text end
7.25 new text begin house of representatives and senate new text end
7.26 new text begin committees with jurisdiction over energy new text end
7.27 new text begin finance and policy on the activities and new text end
7.28 new text begin accomplishments of the Minnesota Energy new text end
7.29 new text begin Alley initiative during the previous fiscal year new text end
7.30 new text begin and the disposition of this appropriation, new text end
7.31 new text begin including a separate statement of the amount new text end
7.32 new text begin of administrative costs. new text end
7.33 new text begin Subd. 8. Grant Administration new text end
7.34 new text begin Notwithstanding Minnesota Statutes, section new text end
7.35 new text begin 16B.98, subdivision 14, the commissioner may new text end
8.1 new text begin use up to $100,000 of the amount in this new text end
8.2 new text begin section for the administrative costs of the new text end
8.3 new text begin grants in this section. new text end
8.4Sec. 3. new text begin DEPARTMENT OF new text end
8.5 new text begin ADMINISTRATION $ 92,000 $ 92,000 new text end
8.6 new text begin $92,000 each year is for software and new text end
8.7 new text begin administrative costs associated with the state new text end
8.8 new text begin building energy conservation improvement new text end
8.9 new text begin revolving loan program under Minnesota new text end
8.10 new text begin Statutes, section 16B.87. new text end
8.11Sec. 4. new text begin UNIVERSITY OF MINNESOTA $ 5,000,000 $ -0- new text end
8.12 new text begin $5,000,000 the first year is for research, new text end
8.13 new text begin development, outreach, and demonstration of new text end
8.14 new text begin energy systems that use hydrogen and new text end
8.15 new text begin ammonia production from renewable energy new text end
8.16 new text begin resources and other sources of clean energy new text end
8.17 new text begin as a means of storing and generating new text end
8.18 new text begin electricity. This is a onetime appropriation and new text end
8.19 new text begin is available until June 30, 2028. new text end
8.20Sec. 5. new text begin POLLUTION CONTROL AGENCY $ 3,000,000 $ -0- new text end
8.21 new text begin $3,000,000 the first year is for a grant to the new text end
8.22 new text begin owner of a biomass energy generation plant new text end
8.23 new text begin in Shakopee that uses waste heat from the new text end
8.24 new text begin generation of electricity in the malting process new text end
8.25 new text begin to purchase equipment to facilitate the disposal new text end
8.26 new text begin of wood that is infested by emerald ash borer. new text end
8.27 new text begin This is a onetime appropriation and is new text end
8.28 new text begin available until June 30, 2028. Notwithstanding new text end
8.29 new text begin Minnesota Statutes, section 16B.98, new text end
8.30 new text begin subdivision 14, the commissioner of the new text end
8.31 new text begin Pollution Control Agency may use up to new text end
8.32 new text begin $25,000 of the amount in this section for the new text end
8.33 new text begin administrative costs of this grant. new text end
9.1Sec. 6. new text begin TRANSFER. new text end
9.2 new text begin $2,000,000 in fiscal year 2026 is transferred from the renewable development account new text end
9.3 new text begin in the special revenue fund to the geothermal planning grant account under Minnesota new text end
9.4 new text begin Statutes, section 216C.47, subdivision 3. new text end
9.5Sec. 7. new text begin APPROPRIATION EXTENSION. new text end
9.6 new text begin Notwithstanding Minnesota Statutes, section 16A.28, and Laws 2023, chapter 60, article new text end
9.7 new text begin 11, section 2, subdivision 3, paragraph (c), the availability of the fiscal year 2024 and fiscal new text end
9.8 new text begin year 2025 appropriations for grants to the University of St. Thomas Center for Microgrid new text end
9.9 new text begin Research in Laws 2023, chapter 60, article 11, section 2, subdivision 3, are extended to June new text end
9.10 new text begin 30, 2028. new text end
9.11 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
9.12ARTICLE 3
9.13ENERGY POLICY
9.14Section 1. Minnesota Statutes 2024, section 116C.7792, is amended to read:
9.15116C.7792 SOLAR ENERGY PRODUCTION INCENTIVE PROGRAM.
9.16(a) The utility subject to section 116C.779 shall operate a program to provide solar
9.17energy production incentives for solar energy systems of no more than a total aggregate
9.18nameplate capacity of 40 kilowatts alternating current per premise. The owner of a solar
9.19energy system installed before June 1, 2018, is eligible to receive a production incentive
9.20under this section for any additional solar energy systems constructed at the same customer
9.21location, provided that the aggregate capacity of all systems at the customer location does
9.22not exceed 40 kilowatts.
9.23(b) The program is funded by money withheld from transfer to the renewable development
9.24account under section 116C.779, subdivision 1, paragraphs (b) and (e). Program funds must
9.25be placed in a separate account for the purpose of the solar energy production incentive
9.26program operated by the utility and not for any other program or purpose.
9.27(c) Funds allocated to the solar energy production incentive program in 2019 and 2020
9.28remain available to the solar energy production incentive program.
9.29(d) The following amounts are allocated to the solar energy production incentive program:
9.30(1) $10,000,000 in 2021;
9.31(2) $10,000,000 in 2022;
10.1(3) $5,000,000 in 2023;
10.2(4) $11,250,000 in 2024;
10.3(5) $6,250,000 in 2025; and
10.4(6) $5,000,000 each year, beginning in 2026 through 2035.
10.5(e) Notwithstanding the Department of Commerce's November 14, 2018, decision in
10.6Docket No. E002/M-13-1015 regarding operation of the utility's solar energy production
10.7incentive program, half of the amounts allocated each year under paragraph (d), clauses (3),
10.8(4), deleted text begin and deleted text end (5), new text begin and (6), new text end must be reserved for solar energy systems whose installation meets
10.9the eligibility standards for the low-income program established in the November 14, 2018,
10.10decision or successor decisions of the department. All other program operations of the solar
10.11energy production incentive program are governed by the provisions of the November 14,
10.122018, decision or successor decisions of the department.
10.13(f) Funds allocated to the solar energy production incentive program that have not been
10.14committed to a specific project at the end of a program year remain available to the solar
10.15energy production incentive program.
10.16(g) Any unspent amount remaining on January 1, deleted text begin 2028 deleted text end new text begin 2038 new text end , must be transferred to the
10.17renewable development account.
10.18(h) A solar energy system receiving a production incentive under this section must be
10.19sized to less than 120 percent of the customer's on-site annual energy consumption when
10.20combined with other distributed generation resources and subscriptions provided under
10.21section 216B.1641 associated with the premise. The production incentive must be paid for
10.22ten years commencing with the commissioning of the system.
10.23(i) The utility must file a plan to operate the program with the commissioner of commerce.
10.24The utility may not operate the program until it is approved by the commissioner. A change
10.25to the program to include projects up to a nameplate capacity of 40 kilowatts or less does
10.26not require the utility to file a plan with the commissioner. Any plan approved by the
10.27commissioner of commerce must not provide an increased incentive scale over prior years
10.28unless the commissioner demonstrates that changes in the market for solar energy facilities
10.29require an increase.
10.30Sec. 2. Minnesota Statutes 2024, section 216B.16, is amended by adding a subdivision to
10.31read:
10.32 new text begin Subd. 1b. Definitions. For the purposes of this section, "low-income" means a household: new text end
11.1 new text begin (1) that is approved as qualified for energy assistance from the low-income home energy new text end
11.2 new text begin assistance program; new text end
11.3 new text begin (2) with a household income that is 50 percent or less of the state median income; or new text end
11.4 new text begin (3) that meets another qualification established by the commission. new text end
11.5Sec. 3. Minnesota Statutes 2024, section 216B.16, subdivision 14, is amended to read:
11.6Subd. 14. Low-income electric rate discount. A public utility shall fund an affordability
11.7program for low-income customers at a base annual funding level of $8,000,000. The annual
11.8funding level shall increase in the calendar years subsequent to each commission approval
11.9of a rate increase for the public utility's residential customers by the same percentage as the
11.10approved residential rate increase. Costs for the program shall be included in the utility's
11.11base rate. deleted text begin For the purposes of this subdivision, "low-income" describes a customer who is deleted text end
11.12 deleted text begin receiving assistance from the federal low-income home energy assistance program. deleted text end The
11.13affordability program must be designed to target participating customers with the lowest
11.14incomes and highest energy costs in order to lower the percentage of income they devote
11.15to energy bills, increase their payments, lower utility service disconnections, and decrease
11.16costs associated with collection activities on their accounts. For low-income customers who
11.17are 62 years of age or older or disabled, the program must include a $15 discount in each
11.18billing period. For the purposes of this subdivision, "public utility" includes only those
11.19public utilities with more than 200,000 residential electric service customers. The commission
11.20may issue orders necessary to implement, administer, and recover the costs of the program
11.21on a timely basis.
11.22Sec. 4. Minnesota Statutes 2024, section 216B.16, subdivision 15, is amended to read:
11.23Subd. 15. Low-income affordability programs. (a) The commission must consider
11.24ability to pay as a factor in setting utility rates and may establish affordability programs for
11.25low-income residential ratepayers in order to ensure affordable, reliable, and continuous
11.26service to low-income utility customers. A public utility serving low-income residential
11.27ratepayers who use natural gas for heating must file an affordability program with the
11.28commission. deleted text begin For purposes of this subdivision, "low-income residential ratepayers" means deleted text end
11.29 deleted text begin ratepayers who receive energy assistance from the low-income home energy assistance deleted text end
11.30 deleted text begin program (LIHEAP). deleted text end
11.31(b) Any affordability program the commission orders a utility to implement must:
12.1(1) lower the percentage of income that participating low-income households devote to
12.2energy bills;
12.3(2) increase participating customer payments over time by increasing the frequency of
12.4payments;
12.5(3) decrease or eliminate participating customer arrears;
12.6(4) lower the utility costs associated with customer account collection activities; and
12.7(5) coordinate the program with other available low-income bill payment assistance and
12.8conservation resources.
12.9(c) In ordering affordability programs, the commission may require public utilities to
12.10file program evaluations that measure the effect of the affordability program on:
12.11(1) the percentage of income that participating households devote to energy bills;
12.12(2) service disconnections; and
12.13(3) frequency of customer payments, utility collection costs, arrearages, and bad debt.
12.14(d) The commission must issue orders necessary to implement, administer, and evaluate
12.15affordability programs, and to allow a utility to recover program costs, including
12.16administrative costs, on a timely basis. The commission may not allow a utility to recover
12.17administrative costs, excluding start-up costs, in excess of five percent of total program
12.18costs, or program evaluation costs in excess of two percent of total program costs. The
12.19commission must permit deferred accounting, with carrying costs, for recovery of program
12.20costs incurred during the period between general rate cases.
12.21(e) Public utilities may use information collected or created for the purpose of
12.22administering energy assistance to administer affordability programs.
12.23Sec. 5. Minnesota Statutes 2024, section 216B.1641, is amended by adding a subdivision
12.24to read:
12.25 new text begin Subd. 15. Sunset. This section expires July 31, 2030. new text end
12.26Sec. 6. Minnesota Statutes 2024, section 216B.2402, subdivision 16, is amended to read:
12.27Subd. 16. Low-income household. "Low-income household" means a household whose
12.28household income:
13.1(1) is 80 percent or less of the area median household income for the geographic area
13.2in which the low-income household is located, as calculated by deleted text begin the United States Department deleted text end
13.3 deleted text begin of Housing and Urban Development deleted text end new text begin a body of the state or federal government new text end ; or
13.4(2) meets the income eligibility standards, as determined by the commissioner, required
13.5for a household to receive financial assistance from a federal, state, municipal, or utility
13.6program administered or approved by the department.
13.7Sec. 7. Minnesota Statutes 2024, section 216B.2421, subdivision 2, is amended to read:
13.8Subd. 2. Large energy facility. "Large energy facility" means:
13.9(1) any electric power generating plant or combination of plants at a single site with a
13.10combined capacity of 50,000 kilowatts or more and transmission lines directly associated
13.11with the plant that are necessary to interconnect the plant to the transmission system;
13.12(2) any high-voltage transmission line with a capacity of 300 kilovolts or more and
13.13greater than one mile in length in Minnesota;
13.14(3) any high-voltage transmission line with a capacity of 100 kilovolts or more with
13.15more than ten miles of its length in Minnesota;
13.16(4) any pipeline greater than six inches in diameter and having more than 50 miles of
13.17its length in Minnesota used for the transportation of coal, crude petroleum or petroleum
13.18fuels or oil, or their derivatives;
13.19(5) any pipeline for transporting natural or synthetic gas at pressures in excess of 200
13.20pounds per square inch with more than 50 miles of its length in Minnesota;
13.21(6) any facility designed for or capable of storing on a single site more than deleted text begin 100,000 deleted text end
13.22 new text begin 1,000,000 new text end gallons of liquefied natural gas or synthetic gas;
13.23(7) any underground gas storage facility requiring a permit pursuant to section 103I.681;
13.24(8) any nuclear fuel processing or nuclear waste storage or disposal facility; and
13.25(9) any facility intended to convert any material into any other combustible fuel and
13.26having the capacity to process in excess of 75 tons of the material per hour.
13.27Sec. 8. Minnesota Statutes 2024, section 216C.09, is amended to read:
13.28216C.09 COMMISSIONER DUTIES.
13.29(a) The commissioner shall:
14.1(1) manage the department as the central repository within the state government for the
14.2collection of data on energy;
14.3(2) prepare and adopt an emergency allocation plan specifying actions to be taken in the
14.4event of an impending serious shortage of energy, or a threat to public health, safety, or
14.5welfare;
14.6(3) undertake a continuing assessment of trends in the consumption of all forms of energy
14.7and analyze the social, economic, and environmental consequences of these trends;
14.8(4) carry out energy new text begin conservation and efficiency new text end measures as specified by the legislature
14.9and recommend to the governor and the legislature additional energy policies and new text begin energy new text end
14.10conservation deleted text begin measures deleted text end new text begin and efficiency programming new text end as required to meet the objectives of
14.11this chapter;
14.12(5) collect and analyze data relating to present and future demands and resources for all
14.13sources of energy;
14.14(6) evaluate policies governing the establishment of rates and prices for energy as related
14.15to energy conservation new text begin and energy efficiency new text end , and other goals and policies of this chapter,
14.16and make recommendations for changes in energy pricing policies and rate schedules;
14.17(7) study the impact and relationship of the state energy policies to international, national,
14.18and regional energy policies;
14.19(8) design and implement a state program for deleted text begin the deleted text end new text begin energy new text end conservation deleted text begin of energy deleted text end new text begin and new text end
14.20 new text begin efficiency new text end ; deleted text begin this deleted text end new text begin the new text end program deleted text begin shall deleted text end new text begin must new text end include but new text begin is new text end not deleted text begin be deleted text end limited to deleted text begin , deleted text end general commercial,
14.21industrial, deleted text begin and deleted text end residential, and transportation areas; deleted text begin such deleted text end new text begin the new text end program deleted text begin shall deleted text end new text begin must new text end also provide
14.22for the evaluation of energy systems as they relate to lighting, heating, refrigeration, air
14.23conditioning, building design and operation, and appliance manufacturing and operation;
14.24(9) inform and educate the public about the sources and uses of energy and the ways in
14.25which deleted text begin persons deleted text end new text begin Minnesotans new text end can new text begin transition to a clean energy future, new text end conserve energy new text begin , and new text end
14.26 new text begin save money new text end ;
14.27(10) dispense funds made available for the purpose of research studies and projects deleted text begin of deleted text end
14.28 deleted text begin professional and civic orientation deleted text end , which are related to either energy conservation, resource
14.29recovery, or the development of alternative energy technologies which conserve
14.30nonrenewable energy resources while creating minimum environmental impact;
14.31(11) charge other governmental departments and agencies involved in energy-related
14.32activities with specific information gathering goals and require that those goals be met;
15.1(12) design a comprehensive program for the development of deleted text begin indigenous deleted text end energy
15.2resources. The program shall include deleted text begin , deleted text end but not be limited to deleted text begin , deleted text end providing technical,
15.3informational, educational, and financial services and materials to persons, businesses,
15.4municipalities, and organizations involved in the development of new text begin primary and emerging new text end
15.5 new text begin energy sources, including but not limited to new text end solar, wind, hydropower, peat, fiber fuels,
15.6biomass, and other alternative energy resources. The program shall be evaluated by the
15.7alternative energy technical activity; and
15.8(13) dispense loans, grants, or other financial deleted text begin aid deleted text end new text begin resources new text end from money received from
15.9litigation or new text begin a new text end settlement deleted text begin of alleged violations of federal petroleum-pricing regulations deleted text end made
15.10available to the department for that purpose.
15.11(b) Further, the commissioner may participate fully in hearings before the Public Utilities
15.12Commission on matters pertaining to rate design, cost allocation, efficient resource utilization,
15.13utility conservation investments, small power production, cogeneration, and other rate issues.
15.14The commissioner shall support the policies stated in section 216C.05 and shall prepare
15.15and defend testimony proposed to encourage energy conservation improvements as defined
15.16in section 216B.241.
15.17Sec. 9. Minnesota Statutes 2024, section 216C.10, is amended to read:
15.18216C.10 COMMISSIONER POWERS.
15.19(a) The commissioner may:
15.20(1) adopt rules under chapter 14 as necessary to carry out the purposes of this chapter;
15.21(2) make all contracts under this chapter and do all things necessary to cooperate with
15.22the United States government, and to qualify for, accept, and disburse any grant intended
15.23to administer this chapter;
15.24(3) provide on-site technical assistance to units of local government in order to enhance
15.25local capabilities deleted text begin for dealing with energy problems deleted text end new text begin to provide energy-related financial new text end
15.26 new text begin resources, planning, outreach, and engagement new text end ;
15.27(4) administer for the state, energy programs under federal law, regulations, or guidelines,
15.28and coordinate the programs and activities with other state agencies, units of local
15.29government, and educational institutions;
15.30(5) develop a state energy investment plan with yearly energy conservation and alternative
15.31energy development goals, investment targets, and marketing strategies;
16.1(6) perform market analysis studies relating to conservation, alternative and renewable
16.2energy resources, and energy recovery;
16.3(7) assist with the preparation of proposals for innovative conservation, renewable,
16.4alternative, or energy recovery projects;
16.5(8) manage and disburse funds made available for the purpose of research studies or
16.6demonstration projects related to energy conservation or other activities deemed appropriate
16.7by the commissioner;
16.8(9) intervene in certificate of need proceedings before the Public Utilities Commission;
16.9(10) collect fees from recipients of loans, grants, or other financial aid from money
16.10received from litigation or settlement of alleged violations of federal petroleum-pricing
16.11regulations, which fees must be used to pay the department's costs in administering those
16.12financial aids; and
16.13(11) collect fees from proposers and operators of conservation and other energy-related
16.14programs that are reviewed, evaluated, or approved by the department, other than proposers
16.15that are political subdivisions or community or nonprofit organizations, to cover the
16.16department's cost in making the reviewal, evaluation, or approval and in developing additional
16.17programs for others to operate.
16.18(b) Notwithstanding any other law, the commissioner is designated the state agent to
16.19apply for, receive, and accept federal or other funds made available to the state for the
16.20purposes of this chapter.
16.21Sec. 10. Minnesota Statutes 2024, section 216C.11, is amended to read:
16.22216C.11 ENERGY CONSERVATION INFORMATION CENTER.
16.23 new text begin (a) new text end The commissioner deleted text begin shall deleted text end new text begin must new text end establish an Energy Information Center in the
16.24 deleted text begin department's offices in St. Paul deleted text end new text begin department new text end . The information center deleted text begin shall deleted text end new text begin must new text end maintain a
16.25 deleted text begin toll-free telephone information service and disseminate printed materials on energy deleted text end
16.26 deleted text begin conservation topics, including but not limited to, availability of loans and other public and deleted text end
16.27 deleted text begin private financing methods for energy conservation physical improvements, the techniques deleted text end
16.28 deleted text begin and materials used to conserve energy in buildings, including retrofitting or upgrading deleted text end
16.29 deleted text begin insulation and installing weatherstripping, the projected prices and availability of different deleted text end
16.30 deleted text begin sources of energy, and alternative sources of energy deleted text end new text begin physical, virtual, and mobile information new text end
16.31 new text begin service that collects, analyzes, and disseminates energy resources, data, technical assistance new text end
16.32 new text begin and expertise, financial assistance, connections, and information on a variety of energy new text end
16.33 new text begin topics relevant to Minnesota consumers, businesses, Tribal and local governments, and new text end
17.1 new text begin community organizations. The information center must be accessible and responsive to new text end
17.2 new text begin public inquiries and must conduct proactive outreach new text end .
17.3 deleted text begin The Energy Information Center shall serve as the official Minnesota Alcohol Fuels deleted text end
17.4 deleted text begin Information Center and shall disseminate information, printed, by the toll-free telephone deleted text end
17.5 deleted text begin information service, or otherwise on the applicability and technology of alcohol fuels. deleted text end
17.6 deleted text begin The information center shall include information on the potential hazards of energy deleted text end
17.7 deleted text begin conservation techniques and improvements in the printed materials disseminated. The deleted text end
17.8 deleted text begin commissioner shall not be liable for damages arising from the installation or operation of deleted text end
17.9 deleted text begin equipment or materials recommended by the information center. deleted text end
17.10 new text begin (b) new text end The information center deleted text begin shall deleted text end new text begin must new text end use the information collected under section
17.11216C.02, subdivision 1, to maintain a central source of information on new text begin energy new text end conservation new text begin , new text end
17.12 new text begin energy efficiency, new text end and other energy-related programs, including deleted text begin both deleted text end programs required by
17.13law or rule and programs developed and carried on voluntarily.
17.14Sec. 11. Minnesota Statutes 2024, section 216C.12, is amended to read:
17.15216C.12 ENERGY deleted text begin CONSERVATION PUBLICITY deleted text end new text begin LITERACY new text end .
17.16 new text begin (a) new text end The commissioner new text begin , new text end in consultation with other affected agencies or departments deleted text begin shall deleted text end new text begin , new text end
17.17 new text begin must new text end develop informational materials deleted text begin , pamphlets and radio and television messages deleted text end new text begin and new text end
17.18 new text begin messaging new text end on energy conservation and deleted text begin housing deleted text end new text begin energy efficiency new text end programs available in
17.19Minnesota deleted text begin , renewable energy resources, and energy supply and demand. The printed materials deleted text end
17.20 deleted text begin shall include information on available tax credits for residential energy conservation deleted text end
17.21 deleted text begin measures, residential retrofitting loan and grant programs, and data on the economics of deleted text end
17.22 deleted text begin energy conservation and renewable resource measures. Copies of printed materials shall be deleted text end
17.23 deleted text begin distributed to members of the appropriate standing committees of the legislature deleted text end . new text begin The new text end
17.24 new text begin commissioner must use modern and current outreach strategies and media to distribute the new text end
17.25 new text begin informational materials and messaging to the widest possible audience. new text end
17.26 new text begin (b) The informational materials must promote energy literacy for individuals and new text end
17.27 new text begin communities to help individuals and communities make informed decisions on topics ranging new text end
17.28 new text begin from smart energy use at home and consumer choices to national and international energy new text end
17.29 new text begin policy. The informational materials must include but are not limited to information on energy new text end
17.30 new text begin sources, energy generation, energy use, energy conservation strategies, the energy workforce new text end
17.31 new text begin sector, and state and federal energy-related programs administered by the department. new text end
18.1Sec. 12. Minnesota Statutes 2024, section 216C.391, subdivision 1, is amended to read:
18.2Subdivision 1. Definitions. (a) For the purposes of this section, the following terms have
18.3the meanings given.
18.4(b) "Competitive funds" means federal funds awarded to selected applicants based on
18.5the grantor's evaluation of the strength of an application measured against all other
18.6applications.
18.7(c) "Disadvantaged community" has the meaning given by the federal agency disbursing
18.8federal funds.
18.9(d) "Eligible entity" means an entity located in Minnesota that is eligible to receive
18.10federal funds, tax credits, loans, or an entity that has at least one Minnesota-based partner,
18.11as determined by the grantor of the federal funds, tax credits, or loans.
18.12(e) "Federal funds" means federal formula or competitive funds available for award to
18.13applicants for energy projects under the Infrastructure Investment and Jobs Act, Public Law
18.14117-58, or the Inflation Reduction Act of 2022, Public Law 117-169.
18.15(f) "Formula funds" means federal funds awarded to all eligible applicants on a
18.16noncompetitive basis.
18.17(g) "Loans" means federal loans from loan funds authorized or funded in the Inflation
18.18Reduction Act of 2022, Public Law 117-169.
18.19(h) "Match" means the amount of deleted text begin state deleted text end new text begin nonfederal new text end money a successful grantee in
18.20Minnesota is required to contribute to a project as a condition of receiving federal funds.
18.21(i) "Political subdivision" has the meaning given in section 331A.01, subdivision 3.
18.22(j) "Project" means the activities proposed to be undertaken by an eligible entity awarded
18.23federal funds and are located in Minnesota or will directly benefit Minnesotans.
18.24(k) "Tax credits" means federal tax credits authorized in the Inflation Reduction Act of
18.252022, Public Law 117-169.
18.26(l) "Tribal government" has the meaning given in section 116J.64, subdivision 4.
18.27Sec. 13. Minnesota Statutes 2024, section 216C.391, subdivision 3, is amended to read:
18.28Subd. 3. Grant awards; eligible entities; priorities. (a) Grants may be awarded under
18.29this section to eligible entities in accordance with the following order of priorities:
18.30(1) federal formula funds directed to the state that require a match;
19.1(2) federal funds directed to a political subdivision or a Tribal government that require
19.2a match;
19.3(3) federal funds directed to an institution of higher education, a consumer-owned utility,
19.4a business, or a nonprofit organization that require a match;
19.5(4) federal funds directed to investor-owned utilities that require a match;
19.6(5) federal funds directed to an eligible entity not included in clauses (1) to (4) that
19.7require a match; and
19.8(6) all other grant opportunities directed to eligible entities that do not require a match
19.9but for which the commissioner determines that a grant made under this section is likely to
19.10enhance the likelihood of an applicant receiving federal funds, or to increase the potential
19.11amount of federal funds received.
19.12(b) By November 15, 2023, the commissioner must develop and publicly post, and report
19.13to the chairs and ranking minority members of the legislative committees with jurisdiction
19.14over energy finance, the federal energy grant funds that are eligible for state matching funds
19.15under this section.
19.16 new text begin (c) Notwithstanding section 16B.98, subdivision 5, paragraph (b), a grant made under new text end
19.17 new text begin this section may exceed five years. new text end
19.18Sec. 14. Minnesota Statutes 2024, section 216C.47, subdivision 1, is amended to read:
19.19Subdivision 1. Definitions. (a) For the purposes of this section, the following terms have
19.20the meanings given.
19.21(b) "Eligible applicant" means a county, city, town, new text begin Tribal government, new text end or the
19.22Metropolitan Council.
19.23(c) "Geothermal energy system" means a system that heats and cools one or more
19.24buildings by using the constant temperature of the earth as both a heat source and heat sink,
19.25and a heat exchanger consisting of an underground closed loop system of piping containing
19.26a liquid to absorb and relinquish heat within the earth. Geothermal energy system includes:
19.27(1) a bored geothermal heat exchanger, as defined in section 103I.005;
19.28(2) a groundwater thermal exchange device, as defined in section 103I.005; and
19.29(3) a submerged closed loop heat exchanger, as defined in section 103I.005.
19.30 new text begin (d) "Tribal government" means the elected government of a federally recognized Indian new text end
19.31 new text begin Tribe located in Minnesota. new text end
20.1 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
20.2ARTICLE 4
20.3SECURITIZATION
20.4Section 1. new text begin [216B.491] DEFINITIONS. new text end
20.5 new text begin Subdivision 1. Scope. For the purposes of sections 216B.491 to 216B.499, the terms new text end
20.6 new text begin defined in this section have the meanings given. new text end
20.7 new text begin Subd. 2. Ancillary agreement. "Ancillary agreement" means a bond, insurance policy, new text end
20.8 new text begin letter of credit, reserve account, surety bond, interest rate lock or swap arrangement, liquidity new text end
20.9 new text begin or credit support arrangement, or other financial arrangement entered into in connection new text end
20.10 new text begin with extraordinary event bonds that is designed to promote the credit quality and new text end
20.11 new text begin marketability of extraordinary event bonds or to mitigate the risk of an increase in interest new text end
20.12 new text begin rates. new text end
20.13 new text begin Subd. 3. Assignee. "Assignee" means a person to which an interest in extraordinary new text end
20.14 new text begin event property is sold, assigned, transferred, or conveyed, other than as security, and any new text end
20.15 new text begin successor to or subsequent assignee of the person. new text end
20.16 new text begin Subd. 4. Bondholder. "Bondholder" means a holder or owner of extraordinary event new text end
20.17 new text begin bonds. new text end
20.18 new text begin Subd. 5. Customer. "Customer" means a person who purchases natural gas or natural new text end
20.19 new text begin gas transportation services from a utility in Minnesota. Customer does not include a person new text end
20.20 new text begin who: new text end
20.21 new text begin (1) purchases natural gas transportation services from a utility in Minnesota that serves new text end
20.22 new text begin fewer than 350,000 natural gas customers in Minnesota; and new text end
20.23 new text begin (2) does not purchase natural gas from a utility in Minnesota. new text end
20.24 new text begin Subd. 6. Extraordinary event. (a) "Extraordinary event" means an event arising from new text end
20.25 new text begin unforeseen circumstances of sufficient magnitude, as determined by the commission: new text end
20.26 new text begin (1) to impose significant costs on customers; and new text end
20.27 new text begin (2) for which the issuance of extraordinary event bonds in response to the event meets new text end
20.28 new text begin the conditions of section 216B.492, subdivision 2. new text end
20.29 new text begin (b) Extraordinary event includes but is not limited to a storm event or other natural new text end
20.30 new text begin disaster, an act of God, war, terrorism, sabotage, vandalism, a cybersecurity attack, or a new text end
20.31 new text begin temporary significant increase in the wholesale price of natural gas. new text end
21.1 new text begin Subd. 7. Extraordinary event activity. "Extraordinary event activity" means an activity new text end
21.2 new text begin undertaken by or on behalf of a utility to restore or maintain the utility's ability to provide new text end
21.3 new text begin natural gas service following one or more extraordinary events, including but not limited new text end
21.4 new text begin to activities related to mobilizing, staging, constructing, reconstructing, replacing, or repairing new text end
21.5 new text begin natural gas transmission, distribution, storage, or general facilities. new text end
21.6 new text begin Subd. 8. Extraordinary event bonds. "Extraordinary event bonds" means debt securities, new text end
21.7 new text begin including but not limited to senior secured bonds, debentures, notes, certificates of new text end
21.8 new text begin participation, certificates of beneficial interest, certificates of ownership, or other evidences new text end
21.9 new text begin of indebtedness or ownership, that: (1) have a scheduled maturity of no longer than 30 years new text end
21.10 new text begin and a final legal maturity date that is not later than 32 years from the issue date; (2) are rated new text end
21.11 new text begin AA, Aa2, or higher by a major independent credit rating agency at the time of issuance; new text end
21.12 new text begin and (3) are issued by a utility or an assignee under a financing order. new text end
21.13 new text begin Subd. 9. Extraordinary event charge. "Extraordinary event charge" means a new text end
21.14 new text begin nonbypassable charge that: new text end
21.15 new text begin (1) a utility that is the subject of a financing order or the utility's successor or assignee new text end
21.16 new text begin imposes on all of the utility's customers; new text end
21.17 new text begin (2) is separate from the utility's base rates; and new text end
21.18 new text begin (3) provides a source of revenue used only to repay, finance, or refinance extraordinary new text end
21.19 new text begin event costs. new text end
21.20 new text begin Subd. 10. Extraordinary event costs. "Extraordinary event costs": new text end
21.21 new text begin (1) means all incremental costs of extraordinary event activities that are approved by new text end
21.22 new text begin the commission in a financing order issued under section 216B.492 as being: new text end
21.23 new text begin (i) necessary to enable the utility to restore or maintain natural gas service to customers new text end
21.24 new text begin after the utility experiences an extraordinary event; and new text end
21.25 new text begin (ii) prudent and reasonable; new text end
21.26 new text begin (2) includes costs to repurchase equity or retire any indebtedness relating to extraordinary new text end
21.27 new text begin event activities; new text end
21.28 new text begin (3) are net of applicable insurance proceeds, tax benefits, and any other amounts intended new text end
21.29 new text begin to reimburse the utility for extraordinary event activities, including government grants or new text end
21.30 new text begin aid of any kind; new text end
22.1 new text begin (4) do not include any monetary penalty, fine, or forfeiture assessed against a utility by new text end
22.2 new text begin a government agency or court under a federal or state environmental statute, rule, or new text end
22.3 new text begin regulation; and new text end
22.4 new text begin (5) must be adjusted to reflect: new text end
22.5 new text begin (i) the difference, as determined by the commission, between extraordinary event costs new text end
22.6 new text begin that the utility expects to incur and actual, reasonable, and prudent costs incurred; or new text end
22.7 new text begin (ii) a more fair or reasonable allocation of extraordinary event costs to customers over new text end
22.8 new text begin time, as expressed in a commission order, provided that after the issuance of extraordinary new text end
22.9 new text begin event bonds relating to the extraordinary event costs, the adjustment must not (A) reduce new text end
22.10 new text begin or impair the extraordinary event property relating to the extraordinary event bonds, or (B) new text end
22.11 new text begin reduce, impair, postpone, or terminate extraordinary event charges relating to the new text end
22.12 new text begin extraordinary event bonds until all principal, interest, and redemption premium, if any, new text end
22.13 new text begin payable on the extraordinary event bonds, all financing costs for the extraordinary event new text end
22.14 new text begin bonds, and all amounts that must be paid to an assignee or financing party under an ancillary new text end
22.15 new text begin agreement relating to the extraordinary event bonds are paid in full. new text end
22.16 new text begin Subd. 11. Extraordinary event property. "Extraordinary event property" means: new text end
22.17 new text begin (1) all rights and interests that a utility or the utility's successor or assignee possess under new text end
22.18 new text begin a financing order to impose, bill, collect, receive, and obtain periodic adjustments to new text end
22.19 new text begin extraordinary event charges authorized under a financing order issued by the commission; new text end
22.20 new text begin and new text end
22.21 new text begin (2) all revenue, collections, claims, rights to payments, payments, money, or proceeds new text end
22.22 new text begin arising from the rights and interests specified in clause (1), regardless of whether any are new text end
22.23 new text begin commingled with other revenue, collections, rights to payment, payments, money, or new text end
22.24 new text begin proceeds. new text end
22.25 new text begin Subd. 12. Extraordinary event revenue. "Extraordinary event revenue" means revenue, new text end
22.26 new text begin receipts, collections, payments, money, claims, or other proceeds arising from extraordinary new text end
22.27 new text begin event property. new text end
22.28 new text begin Subd. 13. Financing costs. "Financing costs" means: new text end
22.29 new text begin (1) principal, interest, and redemption premiums, if any, that are payable on extraordinary new text end
22.30 new text begin event bonds; new text end
22.31 new text begin (2) payments required under an ancillary agreement and amounts required to fund or new text end
22.32 new text begin replenish a reserve account or other accounts established under the terms of any indenture, new text end
22.33 new text begin ancillary agreement, or other financing document pertaining to extraordinary event bonds; new text end
23.1 new text begin (3) other demonstrable costs related to issuing, supporting, repaying, refunding, and new text end
23.2 new text begin servicing extraordinary event bonds, including but not limited to servicing fees, accounting new text end
23.3 new text begin and auditing fees, trustee fees, legal fees, consulting fees, financial adviser fees, new text end
23.4 new text begin administrative fees, placement and underwriting fees, capitalized interest, rating agency new text end
23.5 new text begin fees, stock exchange listing and compliance fees, security registration fees, filing fees, new text end
23.6 new text begin information technology programming costs, and any other demonstrable costs necessary to new text end
23.7 new text begin otherwise ensure and guarantee the timely payment of extraordinary event bonds, other new text end
23.8 new text begin amounts payable in connection with extraordinary event bonds, or other extraordinary event new text end
23.9 new text begin charges payable in connection with extraordinary event bonds; new text end
23.10 new text begin (4) taxes and license fees imposed on the revenue generated from collecting an new text end
23.11 new text begin extraordinary event charge; new text end
23.12 new text begin (5) state and local taxes, including franchise, sales and use, and other taxes or similar new text end
23.13 new text begin charges, including but not limited to regulatory assessment fees, whether paid, payable, or new text end
23.14 new text begin accrued; and new text end
23.15 new text begin (6) costs incurred by the commission to (i) hire and compensate additional temporary new text end
23.16 new text begin staff needed to perform the commission's responsibilities under this section, and (ii) engage new text end
23.17 new text begin specialized counsel and expert consultants experienced in securitized utility ratepayer-backed new text end
23.18 new text begin bond financings similar to extraordinary event bonds financings, as provided under section new text end
23.19 new text begin 216B.494. new text end
23.20 new text begin Subd. 14. Financing order. "Financing order" means an order issued by the commission new text end
23.21 new text begin under section 216B.492 that authorizes an applicant to: new text end
23.22 new text begin (1) issue extraordinary event bonds in one or more series; new text end
23.23 new text begin (2) impose, charge, and collect extraordinary event charges; and new text end
23.24 new text begin (3) create extraordinary event property. new text end
23.25 new text begin Subd. 15. Financing party. "Financing party" means a holder of extraordinary event new text end
23.26 new text begin bonds and a trustee, a collateral agent, a party under an ancillary agreement, or any other new text end
23.27 new text begin person acting for the benefit of extraordinary event bondholders. new text end
23.28 new text begin Subd. 16. Natural gas facility. "Natural gas facility" means natural gas pipelines, new text end
23.29 new text begin including distribution lines, underground storage areas, liquefied natural gas facilities, new text end
23.30 new text begin propane storage tanks, and other facilities the commission determines are used and useful new text end
23.31 new text begin to provide natural gas service to retail and transportation customers in Minnesota. new text end
23.32 new text begin Subd. 17. Nonbypassable. "Nonbypassable" means an extraordinary event charge that new text end
23.33 new text begin a retail customer located within a utility service area cannot avoid and must pay. new text end
24.1 new text begin Subd. 18. Pretax costs. "Pretax costs" means costs incurred by a utility and approved new text end
24.2 new text begin by the commission, including but not limited to: new text end
24.3 new text begin (1) unrecovered capitalized costs of replaced natural gas facilities damaged or destroyed new text end
24.4 new text begin by an extraordinary event; new text end
24.5 new text begin (2) costs to decommission and restore the site of a natural gas facility damaged or new text end
24.6 new text begin destroyed by an extraordinary event; new text end
24.7 new text begin (3) other applicable capital and operating costs, accrued carrying charges, deferred new text end
24.8 new text begin expenses, reductions for applicable insurance, and salvage proceeds; and new text end
24.9 new text begin (4) costs to retire any existing indebtedness, fees, costs, and expenses to modify existing new text end
24.10 new text begin debt agreements, or for waivers or consents related to existing debt agreements. new text end
24.11 new text begin Subd. 19. Storm event. "Storm event" means a tornado, derecho, ice or snow storm, new text end
24.12 new text begin wildfire, flood, earthquake, or other significant weather or natural disaster that causes new text end
24.13 new text begin substantial damage to a utility's infrastructure. new text end
24.14 new text begin Subd. 20. Successor. "Successor" means a legal entity that succeeds by operation of law new text end
24.15 new text begin to the rights and obligations of another legal entity as a result of bankruptcy, reorganization, new text end
24.16 new text begin restructuring, other insolvency proceeding, merger, acquisition, consolidation, or sale or new text end
24.17 new text begin transfer of assets. new text end
24.18 new text begin Subd. 21. Utility. "Utility" means a public utility, as defined in section 216B.02, new text end
24.19 new text begin subdivision 4, that provides natural gas service to Minnesota customers. Utility includes new text end
24.20 new text begin the utility's successors or assignees. new text end
24.21Sec. 2. new text begin [216B.492] FINANCING ORDER. new text end
24.22 new text begin Subdivision 1. Application. (a) A utility may file an application with the commission new text end
24.23 new text begin requesting a financing order to enable the utility to recover extraordinary event costs by new text end
24.24 new text begin issuing extraordinary event bonds under this section. new text end
24.25 new text begin (b) The application must include the following information, as applicable: new text end
24.26 new text begin (1) a description of each natural gas facility to be repaired or replaced; new text end
24.27 new text begin (2) the undepreciated value remaining in each natural gas facility under clause (1) that new text end
24.28 new text begin the utility proposes to repair or replace using financing obtained by issuing extraordinary new text end
24.29 new text begin event bonds under sections 216B.491 to 216B.499, and the method used to calculate the new text end
24.30 new text begin undepreciated value remaining; new text end
25.1 new text begin (3) the estimated costs imposed on customers resulting from an extraordinary event that new text end
25.2 new text begin involves no physical damage to natural gas facilities; new text end
25.3 new text begin (4) the estimated savings or estimated mitigation of rate impacts to utility customers if new text end
25.4 new text begin the financing order is issued as requested in the application, calculated by comparing the new text end
25.5 new text begin costs to customers that are expected to result from implementing the financing order and new text end
25.6 new text begin the estimated costs associated with implementing traditional utility financing mechanisms new text end
25.7 new text begin with respect to the same undepreciated balance, expressed in net present value terms; new text end
25.8 new text begin (5) a description of (i) the nonbypassable extraordinary event charge utility customers new text end
25.9 new text begin must pay in order to fully recover financing costs, and (ii) the method and assumptions used new text end
25.10 new text begin to calculate the nonbypassable extraordinary event charge; new text end
25.11 new text begin (6) a proposed methodology to allocate the revenue requirement for the extraordinary new text end
25.12 new text begin event charge among the utility's customer classes; new text end
25.13 new text begin (7) a description of a proposed adjustment mechanism that is implemented when necessary new text end
25.14 new text begin to correct any overcollection or undercollection of extraordinary event charges, in order to new text end
25.15 new text begin complete payment of scheduled principal and interest on extraordinary event bonds and new text end
25.16 new text begin other financing costs in a timely fashion; new text end
25.17 new text begin (8) a memorandum with supporting exhibits, developed by a securities firm that is new text end
25.18 new text begin experienced in the marketing of securitized utility ratepayer-backed bonds, indicating the new text end
25.19 new text begin proposed issuance satisfies: (i) the current published AA, Aa2, or higher rating; or (ii) new text end
25.20 new text begin equivalent rating criteria of at least one nationally recognized securities rating organization new text end
25.21 new text begin for issuances similar to the proposed extraordinary event bonds; new text end
25.22 new text begin (9) an estimate of: (i) the timing of the extraordinary event bonds issuance; and (ii) the new text end
25.23 new text begin term of the extraordinary event bonds or series of bonds, provided that the scheduled final new text end
25.24 new text begin maturity for each bond issuance does not exceed 30 years; new text end
25.25 new text begin (10) identification of plans to sell, assign, transfer, or convey, other than as a security, new text end
25.26 new text begin interest in extraordinary event property, including identification of an assignee and new text end
25.27 new text begin demonstration that the assignee is a financing entity that is wholly owned, directly or new text end
25.28 new text begin indirectly, by the utility; new text end
25.29 new text begin (11) identification of ancillary agreements that may be necessary or appropriate; new text end
25.30 new text begin (12) one or more alternative financing scenarios in addition to the preferred scenario new text end
25.31 new text begin contained in the application; new text end
25.32 new text begin (13) the extent of damage to the utility's natural gas facility caused by an extraordinary new text end
25.33 new text begin event and the estimated costs to repair or replace the damaged natural gas facility; new text end
26.1 new text begin (14) a schedule of the proposed repairs to and replacement of the damaged natural gas new text end
26.2 new text begin facility; new text end
26.3 new text begin (15) a description of the steps taken to provide customers interim natural gas service new text end
26.4 new text begin while the damaged natural gas facility is being repaired or replaced; and new text end
26.5 new text begin (16) a description of the impacts on the utility's current workforce resulting from new text end
26.6 new text begin implementing a repair or replacement plan following an extraordinary event. new text end
26.7 new text begin Subd. 2. Findings. After providing notice and holding a public hearing on an application new text end
26.8 new text begin filed under subdivision 1, the commission may issue a financing order if the commission new text end
26.9 new text begin finds that: new text end
26.10 new text begin (1) the extraordinary event costs described in the application are reasonable; new text end
26.11 new text begin (2) the proposed issuance of extraordinary event bonds and the imposition and collection new text end
26.12 new text begin of extraordinary event charges: new text end
26.13 new text begin (i) are just and reasonable; new text end
26.14 new text begin (ii) are consistent with the public interest; new text end
26.15 new text begin (iii) constitute a prudent and reasonable mechanism to finance the extraordinary event new text end
26.16 new text begin costs; and new text end
26.17 new text begin (iv) provide tangible and quantifiable benefits to customers, either by providing lower new text end
26.18 new text begin overall costs or mitigating rate impacts relative to traditional methods of financing, that new text end
26.19 new text begin exceed the benefits achieved absent the issuance of extraordinary event bonds; and new text end
26.20 new text begin (3) the proposed structuring, marketing, and pricing of the extraordinary event bonds: new text end
26.21 new text begin (i) lower overall costs to customers or mitigate rate impacts to customers relative to new text end
26.22 new text begin traditional methods of financing; and new text end
26.23 new text begin (ii) achieve customer savings or mitigate rate impacts to customers, as determined by new text end
26.24 new text begin the commission in a financing order, consistent with market conditions at the time of sale new text end
26.25 new text begin and the terms of the financing order. new text end
26.26 new text begin Subd. 3. Contents. (a) A financing order issued under this section must: new text end
26.27 new text begin (1) determine the maximum amount of extraordinary event costs that may be financed new text end
26.28 new text begin from proceeds of extraordinary event bonds issued pursuant to the financing order; new text end
26.29 new text begin (2) describe the proposed customer billing mechanism for extraordinary event charges new text end
26.30 new text begin and include a finding that the mechanism is just and reasonable; new text end
27.1 new text begin (3) describe the financing costs that may be recovered through extraordinary event new text end
27.2 new text begin charges and the period over which the costs may be recovered, which must end no earlier new text end
27.3 new text begin than the date of final legal maturity of the extraordinary event bonds; new text end
27.4 new text begin (4) describe the extraordinary event property that is created and that may be used to pay, new text end
27.5 new text begin and secure the payment of, principal and interest on the extraordinary event bonds and other new text end
27.6 new text begin financing costs authorized in the financing order; new text end
27.7 new text begin (5) authorize the utility to finance extraordinary event costs by issuing one or more series new text end
27.8 new text begin of extraordinary event bonds. A utility is not required to secure a separate financing order new text end
27.9 new text begin for each extraordinary event bonds issuance or for each scheduled phase to replace natural new text end
27.10 new text begin gas facilities approved in the financing order; new text end
27.11 new text begin (6) include a formula-based mechanism that must be used to make expeditious periodic new text end
27.12 new text begin adjustments to the extraordinary event charges authorized by the financing order that are new text end
27.13 new text begin necessary to (i) correct for any overcollection or undercollection, or (ii) otherwise provide new text end
27.14 new text begin for the timely payment of extraordinary event bonds, other financing costs, and other required new text end
27.15 new text begin amounts and charges payable in connection with extraordinary event bonds; new text end
27.16 new text begin (7) specify the degree of flexibility afforded to the utility to establish the terms and new text end
27.17 new text begin conditions of the extraordinary event bonds, including but not limited to repayment schedules, new text end
27.18 new text begin expected interest rates, and other financing costs; new text end
27.19 new text begin (8) specify that the extraordinary event bonds must be issued, subject to market conditions new text end
27.20 new text begin and the financing order's terms, as soon as feasible following the financing order's issuance; new text end
27.21 new text begin (9) require the utility, at the same time extraordinary event charges are initially collected new text end
27.22 new text begin and independent of the schedule to close and decommission any natural gas facility replaced new text end
27.23 new text begin as the result of an extraordinary event, if any, to remove the natural gas facility from the new text end
27.24 new text begin utility's rate base and commensurately reduce the utility's base rates; new text end
27.25 new text begin (10) specify a future ratemaking process to reconcile any difference between the projected new text end
27.26 new text begin pretax costs included in the amount financed by extraordinary event bonds and the final new text end
27.27 new text begin actual pretax costs incurred by the utility to retire or replace the natural gas facility, if any; new text end
27.28 new text begin (11) specify information regarding extraordinary event bonds issuance and repayments, new text end
27.29 new text begin financing costs, energy transaction charges, extraordinary event property, and related matters new text end
27.30 new text begin that the natural gas utility is required to provide to the commission on a schedule determined new text end
27.31 new text begin by the commission; new text end
27.32 new text begin (12) allow or require the creation of a utility's extraordinary event property to be new text end
27.33 new text begin conditioned on, and occur simultaneously with, the sale or other transfer of the extraordinary new text end
28.1 new text begin event property to an assignee and the pledge of the extraordinary event property to secure new text end
28.2 new text begin the extraordinary event bonds; new text end
28.3 new text begin (13) ensure that the structuring, marketing, and pricing of extraordinary event bonds new text end
28.4 new text begin result in reasonable extraordinary event charges and customer savings or rate impact new text end
28.5 new text begin mitigation, consistent with market conditions and the financing order's terms; and new text end
28.6 new text begin (14) specify that a utility that finances the replacement of one or more natural gas facilities new text end
28.7 new text begin after the natural gas facilities that are subject to the finance order are removed from the new text end
28.8 new text begin utility's rate base is prohibited from: new text end
28.9 new text begin (i) operating the natural gas facilities; or new text end
28.10 new text begin (ii) selling the natural gas facilities to another entity to operate as natural gas facilities. new text end
28.11 new text begin (b) A financing order issued under this section may: new text end
28.12 new text begin (1) include conditions different from those requested in the application that the new text end
28.13 new text begin commission determines are necessary to: new text end
28.14 new text begin (i) promote the public interest; and new text end
28.15 new text begin (ii) maximize the financial benefits or minimize the financial risks of the transaction to new text end
28.16 new text begin customers and to directly impacted Minnesota workers and communities; and new text end
28.17 new text begin (2) select one or more underwriters for the extraordinary event bonds. new text end
28.18 new text begin Subd. 4. Duration; irrevocability; subsequent order. (a) A financing order remains new text end
28.19 new text begin effective until the extraordinary event bonds issued under the financing order and all new text end
28.20 new text begin financing costs related to the extraordinary event bonds have been paid in full. new text end
28.21 new text begin (b) A financing order remains effective and unabated notwithstanding the bankruptcy, new text end
28.22 new text begin reorganization, or insolvency of the utility to which the financing order applies or any new text end
28.23 new text begin affiliate, successor, or assignee of the utility to which the financing order applies. new text end
28.24 new text begin (c) Subject to judicial review under section 216B.52, a financing order is irrevocable new text end
28.25 new text begin and is not reviewable by a future commission. The commission must not: (1) reduce, impair, new text end
28.26 new text begin postpone, or terminate extraordinary event charges approved in a financing order; (2) reduce new text end
28.27 new text begin or impair the extraordinary event property approved in a financing order or impair the new text end
28.28 new text begin collection or recovery of extraordinary event charges and extraordinary event revenue; or new text end
28.29 new text begin (3) change the customers required to pay extraordinary event charges. new text end
28.30 new text begin (d) Notwithstanding paragraph (c), the commission may, on the commission's own new text end
28.31 new text begin motion or at the request of a utility or any other person, commence a proceeding and issue new text end
29.1 new text begin a subsequent financing order that provides for refinancing, retiring, or refunding extraordinary new text end
29.2 new text begin event bonds issued under the original financing order if: new text end
29.3 new text begin (1) the commission makes all of the findings specified in subdivision 2 with respect to new text end
29.4 new text begin the subsequent financing order; and new text end
29.5 new text begin (2) the modification contained in the subsequent financing order does not in any way new text end
29.6 new text begin impair the covenants and terms of the extraordinary event bonds being refinanced, retired, new text end
29.7 new text begin or refunded. new text end
29.8 new text begin Subd. 5. Effect on commission jurisdiction. (a) Except as provided in paragraph (b), new text end
29.9 new text begin the commission, in exercising the powers and carrying out the duties under this section, is new text end
29.10 new text begin prohibited from: new text end
29.11 new text begin (1) considering extraordinary event bonds issued under this section to be debt of the new text end
29.12 new text begin utility other than for income tax purposes, unless considering the extraordinary event bonds new text end
29.13 new text begin to be debt is necessary to achieve consistency with prevailing utility debt rating new text end
29.14 new text begin methodologies; new text end
29.15 new text begin (2) considering the extraordinary event charges paid under the financing order to be new text end
29.16 new text begin revenue of the utility; new text end
29.17 new text begin (3) considering the extraordinary event costs or financing costs specified in the financing new text end
29.18 new text begin order to be the regulated costs or assets of the utility; or new text end
29.19 new text begin (4) determining that any prudent action taken by a utility that is consistent with the new text end
29.20 new text begin financing order is unjust or unreasonable. new text end
29.21 new text begin (b) Nothing in this subdivision: new text end
29.22 new text begin (1) affects the authority of the commission to apply or modify a billing mechanism new text end
29.23 new text begin designed to recover extraordinary event charges; new text end
29.24 new text begin (2) prevents or precludes the commission from (i) investigating a utility's compliance new text end
29.25 new text begin with the financing order's terms and conditions, and (ii) requiring compliance with the new text end
29.26 new text begin financing order; or new text end
29.27 new text begin (3) prevents or precludes the commission from imposing regulatory sanctions against a new text end
29.28 new text begin utility for failure to comply with (i) the financing order's terms and conditions, or (ii) the new text end
29.29 new text begin requirements of this section. new text end
29.30 new text begin (c) The commission is prohibited from refusing to allow a utility to recover any costs new text end
29.31 new text begin associated with the replacement of natural gas facilities solely because the utility has elected new text end
30.1 new text begin to finance the natural gas facility replacement through a financing mechanism other than new text end
30.2 new text begin extraordinary event bonds. new text end
30.3Sec. 3. new text begin [216B.493] POSTORDER COMMISSION DUTIES. new text end
30.4 new text begin Subdivision 1. Financing costs review. Within 120 days after the date extraordinary new text end
30.5 new text begin event bonds are issued, a utility subject to a financing order must file with the commission new text end
30.6 new text begin the actual initial and ongoing financing costs, the final structure and pricing of the new text end
30.7 new text begin extraordinary event bonds, and the actual extraordinary event charge. The commission must new text end
30.8 new text begin review the prudence of the natural gas utility's actions to determine whether the actual new text end
30.9 new text begin financing costs were the lowest that could reasonably be achieved given the financing order's new text end
30.10 new text begin terms and market conditions prevailing at the time of the extraordinary event bond's issuance. new text end
30.11 new text begin Subd. 2. Enforcement. If the commission determines that a utility's actions under this new text end
30.12 new text begin section are not prudent or are inconsistent with the financing order, the commission may new text end
30.13 new text begin apply remedies deemed appropriate for utility actions, provided that any remedy applied new text end
30.14 new text begin must not directly or indirectly: (1) reduce or impair the extraordinary event property approved new text end
30.15 new text begin in the financing order or impair the collection or recovery of extraordinary event charges new text end
30.16 new text begin and extraordinary event revenue; (2) reduce, impair, postpone, or terminate extraordinary new text end
30.17 new text begin event charges approved in the financing order until all principal, interest, and redemption new text end
30.18 new text begin premium, if any, payable on the extraordinary event bonds, all financing costs, and all new text end
30.19 new text begin amounts to be paid to an assignee or financing party under an ancillary agreement are paid new text end
30.20 new text begin in full; or (3) change the customers required to pay extraordinary event charges. new text end
30.21Sec. 4. new text begin [216B.494] USE OF OUTSIDE EXPERTS. new text end
30.22 new text begin (a) To carry out the duties under this section, the commission may: new text end
30.23 new text begin (1) contract with outside consultants and counsel experienced in securitized utility new text end
30.24 new text begin customer-backed bond financing similar to extraordinary event bonds; and new text end
30.25 new text begin (2) hire and compensate additional temporary staff as needed. new text end
30.26 new text begin Expenses incurred by the commission under this paragraph must be treated as financing new text end
30.27 new text begin costs paid by the extraordinary event revenue. The costs incurred under clause (1) are not new text end
30.28 new text begin an obligation of the state and are assigned solely to the transaction. new text end
30.29 new text begin (b) A utility presented with a written request from the commission to reimburse the new text end
30.30 new text begin commission's expenses incurred under paragraph (a), accompanied by a detailed account new text end
30.31 new text begin of the subject expenses, must provide the issuer of the extraordinary event bonds and the new text end
30.32 new text begin indenture trustee for the extraordinary event bonds with such documentation. The indenture new text end
31.1 new text begin trustee must remit full payment of the expenses to the commission on the next interest new text end
31.2 new text begin payment date of the extraordinary event bonds after the payment of interest and scheduled new text end
31.3 new text begin principal of the extraordinary event bonds in accordance with the payment waterfall included new text end
31.4 new text begin in the indenture governing the extraordinary event bonds. new text end
31.5 new text begin (c) If a utility's application for a financing order is denied or withdrawn for any reason new text end
31.6 new text begin and extraordinary event bonds are not issued, the commission's costs to retain expert new text end
31.7 new text begin consultants under this section must be paid by the applicant utility and are deemed a prudent new text end
31.8 new text begin deferred expense eligible for recovery in the utility's future rates. new text end
31.9Sec. 5. new text begin [216B.495] EXTRAORDINARY EVENT CHARGE; BILLING TREATMENT. new text end
31.10 new text begin (a) A utility that obtains a financing order and issues extraordinary event bonds must: new text end
31.11 new text begin (1) include on each customer's monthly natural gas bill: new text end
31.12 new text begin (i) a statement that a portion of the charges represents extraordinary event charges new text end
31.13 new text begin approved in a financing order; new text end
31.14 new text begin (ii) the amount and rate of the extraordinary event charge as a separate line item titled new text end
31.15 new text begin "extraordinary event charge"; and new text end
31.16 new text begin (iii) if extraordinary event property has been transferred to an assignee, a statement that new text end
31.17 new text begin the assignee is the owner of the rights to extraordinary event charges and that the utility or new text end
31.18 new text begin other entity, if applicable, is acting as a collection agent or servicer for the assignee; and new text end
31.19 new text begin (2) file annually with the commission: new text end
31.20 new text begin (i) a calculation that identifies the impact financing the retirement or replacement of new text end
31.21 new text begin natural gas facilities has on customer rates, itemized by customer class; and new text end
31.22 new text begin (ii) evidence demonstrating that extraordinary event revenues are applied solely to pay new text end
31.23 new text begin (A) principal and interest on extraordinary event bonds, and (B) other financing costs. new text end
31.24 new text begin (b) Extraordinary event charges are nonbypassable and must be paid by all existing and new text end
31.25 new text begin future customers receiving service from the utility or the utility's successors or assignees new text end
31.26 new text begin under commission-approved rate schedules or special contracts. new text end
31.27 new text begin (c) A utility's failure to comply with this section does not invalidate, impair, or affect new text end
31.28 new text begin any financing order, extraordinary event property, extraordinary event charge, or new text end
31.29 new text begin extraordinary event bonds, but does subject the utility to penalties under applicable new text end
31.30 new text begin commission rules provided that any penalty applied must not directly or indirectly: (1) new text end
31.31 new text begin reduce or impair the extraordinary event property approved in the financing order or impair new text end
31.32 new text begin the collection or recovery of extraordinary event charges and extraordinary event revenue; new text end
32.1 new text begin (2) reduce, impair, postpone, or terminate extraordinary event charges approved in the new text end
32.2 new text begin financing order until all principal, interest, and redemption premium, if any, payable on the new text end
32.3 new text begin extraordinary event bonds, all financing costs, and all amounts to be paid to an assignee or new text end
32.4 new text begin financing party under an ancillary agreement are paid in full; or (3) change the customers new text end
32.5 new text begin required to pay extraordinary event charges. new text end
32.6Sec. 6. new text begin [216B.496] EXTRAORDINARY EVENT PROPERTY. new text end
32.7 new text begin Subdivision 1. General. (a) Extraordinary event property is an existing present property new text end
32.8 new text begin right or interest in a property right, even though the imposition and collection of extraordinary new text end
32.9 new text begin event charges depend on the utility collecting extraordinary event charges and on future new text end
32.10 new text begin natural gas consumption. The property right or interest exists regardless of whether the new text end
32.11 new text begin revenues or proceeds arising from the extraordinary event property have been billed, have new text end
32.12 new text begin accrued, or have been collected. new text end
32.13 new text begin (b) Extraordinary event property exists until all extraordinary event bonds issued under new text end
32.14 new text begin a financing order are paid in full and all financing costs and other extraordinary event bonds new text end
32.15 new text begin costs have been recovered in full. new text end
32.16 new text begin (c) All or any portion of extraordinary event property described in a financing order new text end
32.17 new text begin issued to a utility may be transferred, sold, conveyed, or assigned to a successor or assignee new text end
32.18 new text begin that is wholly owned, directly or indirectly, by the utility and created for the limited purpose new text end
32.19 new text begin of acquiring, owning, or administering extraordinary event property or issuing extraordinary new text end
32.20 new text begin event bonds authorized by the financing order. All or any portion of extraordinary event new text end
32.21 new text begin property may be pledged to secure extraordinary event bonds issued under a financing order, new text end
32.22 new text begin amounts payable to financing parties and to counterparties under any ancillary agreements, new text end
32.23 new text begin and other financing costs. Each transfer, sale, conveyance, assignment, or pledge by a utility new text end
32.24 new text begin or an affiliate of extraordinary event property is a transaction in the ordinary course of new text end
32.25 new text begin business. new text end
32.26 new text begin (d) If a utility defaults on any required payment of charges arising from extraordinary new text end
32.27 new text begin event property described in a financing order, a court, upon petition by an interested party new text end
32.28 new text begin and without limiting any other remedies available to the petitioner, must order the new text end
32.29 new text begin sequestration and payment of the revenues arising from the extraordinary event property to new text end
32.30 new text begin the financing parties. new text end
32.31 new text begin (e) The interest of a transferee, purchaser, acquirer, assignee, or pledgee in extraordinary new text end
32.32 new text begin event property specified in a financing order issued to a utility, and in the revenue and new text end
32.33 new text begin collections arising from the property, is not subject to setoff, counterclaim, surcharge, or new text end
33.1 new text begin defense by the utility or any other person, or in connection with the reorganization, new text end
33.2 new text begin bankruptcy, or other insolvency of the utility or any other entity. new text end
33.3 new text begin (f) A successor to a utility, whether resulting from a reorganization, bankruptcy, or other new text end
33.4 new text begin insolvency proceeding, merger or acquisition, sale, other business combination, transfer by new text end
33.5 new text begin operation of law, utility restructuring, or otherwise: (1) must perform and satisfy all new text end
33.6 new text begin obligations of, and has the same duties and rights under, a financing order as the utility to new text end
33.7 new text begin which the financing order applies; and (2) must perform the duties and exercise the rights new text end
33.8 new text begin in the same manner and to the same extent as the utility, including (i) collecting extraordinary new text end
33.9 new text begin event bonds revenues, collections, payments, or proceeds, and (ii) paying a person entitled new text end
33.10 new text begin to receive extraordinary event bonds revenues, collections, payments, or proceeds. new text end
33.11 new text begin Subd. 2. Security interests in extraordinary event property. (a) The creation, new text end
33.12 new text begin perfection, and enforcement of any security interest in extraordinary event property to secure new text end
33.13 new text begin the repayment of the principal and interest on extraordinary event bonds, amounts payable new text end
33.14 new text begin under any ancillary agreement, and other financing costs are governed by this section only. new text end
33.15 new text begin (b) A security interest in extraordinary event property is created, valid, and binding new text end
33.16 new text begin when: new text end
33.17 new text begin (1) the financing order that describes the extraordinary event property is issued; new text end
33.18 new text begin (2) a security agreement is executed and delivered; and new text end
33.19 new text begin (3) value is received for the extraordinary event bonds. new text end
33.20 new text begin (c) Once a security interest in extraordinary event property is created, the security interest new text end
33.21 new text begin attaches without any physical delivery of collateral or any other act. The lien of the security new text end
33.22 new text begin interest is valid, binding, and perfected against all parties having claims of any kind in tort, new text end
33.23 new text begin in contract, or otherwise against the person granting the security interest, regardless of new text end
33.24 new text begin whether the parties have notice of the lien, upon the filing of a financing statement with the new text end
33.25 new text begin secretary of state. new text end
33.26 new text begin (d) The description or indication of extraordinary event property in a transfer or security new text end
33.27 new text begin agreement and a financing statement is sufficient only if the description or indication refers new text end
33.28 new text begin to this section and the financing order creating the extraordinary event property. new text end
33.29 new text begin (e) A security interest in extraordinary event property is a continuously perfected security new text end
33.30 new text begin interest and has priority over any other lien, created by operation of law or otherwise, that new text end
33.31 new text begin may subsequently attach to the extraordinary event property unless the person that holds new text end
33.32 new text begin the security interest has agreed otherwise in writing. new text end
34.1 new text begin (f) The priority of a security interest in extraordinary event property is not affected by new text end
34.2 new text begin the commingling of extraordinary event property or extraordinary event revenue with other new text end
34.3 new text begin money. An assignee, bondholder, or financing party has a perfected security interest in the new text end
34.4 new text begin amount of all extraordinary event property or extraordinary event revenue that is pledged new text end
34.5 new text begin to pay extraordinary event bonds even if the extraordinary event property or extraordinary new text end
34.6 new text begin event revenue is deposited in a cash or deposit account owned by the utility in which the new text end
34.7 new text begin extraordinary event revenue is commingled with other money. Any other security interest new text end
34.8 new text begin that applies to the other money does not apply to the extraordinary event revenue. new text end
34.9 new text begin (g) A subsequent commission order amending a financing order under section 216B.492, new text end
34.10 new text begin subdivision 4, or the application of an adjustment mechanism authorized by a financing new text end
34.11 new text begin order under section 216B.492, subdivision 3, does not affect the validity, perfection, or new text end
34.12 new text begin priority of a security interest in or transfer of extraordinary event property. new text end
34.13 new text begin Subd. 3. Sales of extraordinary event property. (a) A sale, assignment, or transfer of new text end
34.14 new text begin extraordinary event property is an absolute transfer and true sale of, and not a pledge of or new text end
34.15 new text begin secured transaction relating to, the seller's right, title, and interest in, to, and under the new text end
34.16 new text begin extraordinary event property if the documents governing the transaction expressly state that new text end
34.17 new text begin the transaction is a sale or other absolute transfer. A transfer of an interest in extraordinary new text end
34.18 new text begin event property may be created when: new text end
34.19 new text begin (1) the financing order creating and describing the extraordinary event property is new text end
34.20 new text begin effective; new text end
34.21 new text begin (2) the documents evidencing the transfer of the extraordinary event property are executed new text end
34.22 new text begin and delivered to the assignee; and new text end
34.23 new text begin (3) value is received. new text end
34.24 new text begin (b) The characterization of a sale, assignment, or transfer as an absolute transfer and new text end
34.25 new text begin true sale, and the corresponding characterization of the property interest of the assignee, is new text end
34.26 new text begin not affected or impaired by: new text end
34.27 new text begin (1) commingling extraordinary event revenue with other money; new text end
34.28 new text begin (2) the seller retaining: new text end
34.29 new text begin (i) a partial or residual interest, including an equity interest, in the extraordinary event new text end
34.30 new text begin property, whether (A) direct or indirect, or (B) subordinate or otherwise; or new text end
34.31 new text begin (ii) the right to recover costs associated with taxes, franchise fees, or license fees imposed new text end
34.32 new text begin on the collection of extraordinary event revenue; new text end
35.1 new text begin (3) any recourse that the extraordinary event property purchaser may have against the new text end
35.2 new text begin seller; new text end
35.3 new text begin (4) any indemnification rights, obligations, or repurchase rights made or provided by new text end
35.4 new text begin the extraordinary event property seller; new text end
35.5 new text begin (5) the extraordinary event property seller's obligation to collect extraordinary event new text end
35.6 new text begin revenues on behalf of an assignee; new text end
35.7 new text begin (6) the treatment of the sale, assignment, or transfer for tax, financial reporting, or other new text end
35.8 new text begin purposes; new text end
35.9 new text begin (7) any subsequent financing order amending a financing order under section 216B.492, new text end
35.10 new text begin subdivision 4, paragraph (d); or new text end
35.11 new text begin (8) any application of an adjustment mechanism under section 216B.492, subdivision new text end
35.12 new text begin 3, paragraph (a), clause (6). new text end
35.13Sec. 7. new text begin [216B.497] EXTRAORDINARY EVENT BONDS. new text end
35.14 new text begin (a) A bank, trust company, savings and loan association, insurance company, executor, new text end
35.15 new text begin administrator, guardian, trustee, or other fiduciary may legally invest any money within the new text end
35.16 new text begin individual's or entity's control in extraordinary event bonds. new text end
35.17 new text begin (b) Extraordinary event bonds issued under a financing order are not debt of or a pledge new text end
35.18 new text begin of the faith and credit or taxing power of the state, any agency of the state, or any political new text end
35.19 new text begin subdivision. An extraordinary event bonds holder does not possess the ability to compel new text end
35.20 new text begin taxes to be levied by the state or a political subdivision in order to pay the principal or new text end
35.21 new text begin interest on extraordinary event bonds. The issuance of extraordinary event bonds does not new text end
35.22 new text begin directly, indirectly, or contingently obligate the state or a political subdivision to levy any new text end
35.23 new text begin tax or make any appropriation to pay principal or interest on the extraordinary event bonds. new text end
35.24 new text begin (c) The state pledges to and agrees with an extraordinary event bonds holder, assignee, new text end
35.25 new text begin and financing party that the state and state agencies, including the commission, are prohibited new text end
35.26 new text begin from: new text end
35.27 new text begin (1) taking or permitting an action that reduces or impairs the extraordinary event property new text end
35.28 new text begin approved in the financing order or impairs the collection or recovery of extraordinary event new text end
35.29 new text begin charges or extraordinary event revenue; new text end
35.30 new text begin (2) reducing, impairing, postponing, or terminating extraordinary event charges approved new text end
35.31 new text begin in the financing order that are imposed, collected, and remitted for the benefit of an new text end
35.32 new text begin extraordinary event bonds holder, assignee, and financing party until all principal, interest, new text end
36.1 new text begin and redemption premium, if any, payable on extraordinary event bonds, all financing costs, new text end
36.2 new text begin and all amounts to be paid to an assignee or financing party under an ancillary agreement new text end
36.3 new text begin are paid in full; or new text end
36.4 new text begin (3) changing the customers required to pay the extraordinary event charges. new text end
36.5 new text begin (d) The commission may include a pledge in the financing order similar to the pledge new text end
36.6 new text begin included in paragraph (c). new text end
36.7 new text begin (e) A person who issues extraordinary event bonds may include the pledge specified in new text end
36.8 new text begin paragraphs (c) and (d) in the extraordinary event bonds, ancillary agreements, and new text end
36.9 new text begin documentation related to the issuance and marketing of the extraordinary event bonds. new text end
36.10Sec. 8. new text begin [216B.498] ASSIGNEE OF FINANCING PARTY NOT SUBJECT TO new text end
36.11 new text begin COMMISSION REGULATION. new text end
36.12 new text begin An assignee or financing party that is not already regulated by the commission does not new text end
36.13 new text begin become subject to commission regulation solely as a result of engaging in any transaction new text end
36.14 new text begin authorized by or described in sections 216B.491 to 216B.499. new text end
36.15Sec. 9. new text begin [216B.499] EFFECT ON OTHER LAWS. new text end
36.16 new text begin (a) If a provision of sections 216B.491 to 216B.499 conflicts with other law regarding new text end
36.17 new text begin the attachment, assignment, perfection, effect of perfection, or priority of a security interest new text end
36.18 new text begin in or transfer of extraordinary event property, sections 216B.491 to 216B.499 govern. new text end
36.19 new text begin (b) Nothing in this section precludes a utility for which the commission has initially new text end
36.20 new text begin issued a financing order from applying to the commission for: new text end
36.21 new text begin (1) a subsequent financing order amending the financing order under section 216B.492, new text end
36.22 new text begin subdivision 4, paragraph (d); or new text end
36.23 new text begin (2) approval to issue extraordinary event bonds to refund all or a portion of an outstanding new text end
36.24 new text begin series of extraordinary event bonds. new text end
36.25Sec. 10. Minnesota Statutes 2024, section 216B.62, subdivision 3, is amended to read:
36.26Subd. 3. Assessing all public utilities. The department and commission shall quarterly,
36.27at least 30 days before the start of each quarter, estimate the total of their expenditures in
36.28the performance of their duties relating to public utilities under sections 216B.01 to 216B.67,
36.29other than amounts chargeable to public utilities under subdivision 2, 6, 7, deleted text begin or deleted text end 8 new text begin , or 9 new text end . The
36.30remainder shall be assessed by the commission and department to the several public utilities
36.31in proportion to their respective gross operating revenues from retail sales of gas or electric
37.1service within the state during the last calendar year. The assessment shall be paid into the
37.2state treasury within 30 days after the bill has been transmitted via mail, personal delivery,
37.3or electronic service to the several public utilities, which shall constitute notice of the
37.4assessment and demand of payment thereof. The total amount which may be assessed to
37.5the public utilities, under authority of this subdivision, shall not exceed one-sixth of one
37.6percent of the total gross operating revenues of the public utilities during the calendar year
37.7from retail sales of gas or electric service within the state. The assessment for the third
37.8quarter of each fiscal year shall be adjusted to compensate for the amount by which actual
37.9expenditures by the commission and department for the preceding fiscal year were more or
37.10less than the estimated expenditures previously assessed.
37.11Sec. 11. Minnesota Statutes 2024, section 216B.62, is amended by adding a subdivision
37.12to read:
37.13 new text begin Subd. 9. Administrative costs for extraordinary event bonds. The commission and new text end
37.14 new text begin the department may assess gas utilities for the actual commission and department costs new text end
37.15 new text begin incurred to administer extraordinary event bonds under sections 216B.491 to 216B.499. new text end
37.16 new text begin The money received from the assessment must be deposited into an account in the special new text end
37.17 new text begin revenue fund. All money deposited in the account is appropriated to the commission or the new text end
37.18 new text begin department for the purposes of this subdivision. The commission and department may new text end
37.19 new text begin initially assess for estimated costs under sections 216B.491 to 216B.499, then must adjust new text end
37.20 new text begin subsequent assessments for actual costs incurred under sections 216B.491 to 216B.499. An new text end
37.21 new text begin assessment made under this subdivision is not subject to the cap on assessments provided new text end
37.22 new text begin in subdivision 3 or any other law. new text end
Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.
Progress through the legislative process
Passed Chamber